MoDOT contract 251212-D02 bid tabulation
J5S3418 - ROUTE OR 50 - COLE COUNTY. Let by Missouri DOT on December 12, 2025, Cole, Central. 3 bids received; low bid $1,552,567 by Sam Gaines Construction, Inc..
- Owner
- Missouri DOT
- Letting
- 12 DEC 2025
- Pay items
- 119
- Data through
- 16 OCT 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Sam Gaines Construction, Inc. | $1,552,567 | Low |
| 2 | Don Schnieders Excavating Company, Inc. | $1,725,616 | +11% |
| 3 | Aplex, Inc. | $2,046,338 | +32% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Sam Gaines Construction, Inc. | 2. Don Schnieders Excavating Company, Inc. | 3. Aplex, Inc. |
|---|---|---|---|---|---|---|
| 0010 | Clearing and grubbing (2013000) | ACRE | 1 | $5,000.00 | $4,440.00 | $5,000.00 |
| 0020 | Removal of improvements (2022010) | LS | 1 | $100,000 | $79,722 | $85,000 |
| 0030 | Class A excavation (2031000) | CY | 2,188 | $20.00 | $37.30 | $35.00 |
| 0040 | Compacting embankment (2036000) | CY | 1,647 | $10.00 | $14.55 | $10.00 |
| 0050 | Compacting in cut (2037075) | STA | 16.30 | $250.00 | $1,693.00 | $2,600.00 |
| 0060 | Class 3 excavation (2063000) | CY | 263 | $30.00 | $68.44 | $65.00 |
| 0070 | Class 4 excavation (2063300) | CY | 24 | $150.00 | $75.00 | $150.00 |
| 0080 | Class 4 excavation in rock (2063400) | CY | 45 | $225.00 | $272.00 | $250.00 |
| 0090 | Linear grading class 1 (2071000) | STA | 1.80 | $20,000 | $3,300.00 | $2,500.00 |
| 0100 | Type 5 aggregate for base (4 in. thick) (3040504) | SY | 1,831 | $12.00 | $11.15 | $22.00 |
| 0110 | Type 5 aggregate for base (6 in. thick) (3040506) | SY | 3,017 | $16.00 | $18.45 | $25.00 |
| 0120 | Bituminous pavement mixture PG64-22 (surface leveling) (4020520) | TON | 28.70 | $438.00 | $350.00 | $350.00 |
| 0130 | Concrete pavement (9 in. non-reinforced 15 FT. joints) (5021309) | SY | 2,321 | $90.00 | $135.00 | $95.00 |
| 0140 | Pipe collar, type A (6044011) | EACH | 1 | $1,000.00 | $2,500.00 | $1,500.00 |
| 0150 | Chain-link fence (60 in.) (6071012A) | LF | 176 | $75.00 | $60.00 | $75.00 |
| 0160 | Modified concrete gutter type A (6071101) | LF | 138 | $250.00 | $325.00 | $265.00 |
| 0170 | Concrete curb ramp (6081010) | SY | 194 | $150.00 | $137.00 | $135.00 |
| 0180 | Truncated domes (6081012) | SF | 60 | $40.00 | $30.00 | $30.00 |
| 0190 | 6 in. concrete median strip (6083006) | SY | 304 | $115.00 | $69.00 | $125.00 |
| 0200 | Paved approach, 8 in. (6085008) | SY | 877 | $105.00 | $124.00 | $135.00 |
| 0210 | Concrete sidewalk, 4 in. (6086004) | SY | 685 | $65.00 | $90.75 | $65.00 |
| 0220 | Concrete curb (6 in. height and under) type S (6091010) | LF | 42 | $150.00 | $54.00 | $95.00 |
| 0230 | Concrete gutter type B (6091042) | LF | 226 | $100.00 | $89.00 | $95.00 |
| 0240 | Curb and gutter type B (6091052) | LF | 1,926 | $70.00 | $61.00 | $58.00 |
| 0250 | Rock lining (6097000) | CY | 20 | $90.00 | $112.50 | $160.00 |
| 0260 | Truck mounted attenuator (TMA) (6123001) | LS | 1 | $12,000 | $30,000 | $12,500 |
| 0270 | Furnishing and placing concrete material for full depth pavement repair (6131010) | SY | 60 | $95.00 | $228.00 | $365.00 |
| 0280 | Subgrade compaction (6 in. depth) (pavement repair) (6131012) | SY | 46 | $30.00 | $27.00 | $20.00 |
| 0290 | Type 1 or 5 aggregate for base (4 in. thick) (pavement repair) (6131013) | SY | 46 | $12.00 | $15.00 | $20.00 |
| 0300 | Full depth pavement repair saw cut (for perimeter and internal saw cuts) (6131014) | LF | 196 | $6.00 | $10.00 | $20.00 |
| 0310 | Dowel bar (drilling, furnishing and installation) for full depth pavement repair (6131015) | EACH | 196 | $30.00 | $22.00 | $20.00 |
| 0320 | Grate and bearing plate (5 FT. X 3 FT. or 1524 MM X 914 MM) (6141024) | EACH | 1 | $4,000.00 | $2,770.00 | $3,000.00 |
| 0330 | Curved vane grate and frame (4 FT. X 2 FT. or 1200MM X 600MM) (6141121) | EACH | 3 | $2,000.00 | $1,340.00 | $1,500.00 |
| 0340 | Manhole frame and cover, type 3 (6143013) | EACH | 1 | $1,000.00 | $700.00 | $1,000.00 |
| 0350 | Construction signs (6161005) | SF | 245 | $7.00 | $7.00 | $9.00 |
| 0360 | Channelizer (trim-line) (6161025) | EACH | 59 | $16.00 | $16.00 | $18.00 |
| 0370 | Type 3 moveable barricade (6161030) | EACH | 5 | $100.00 | $100.00 | $155.00 |
| 0380 | Direction indicator barricade (6161033) | EACH | 15 | $65.00 | $65.00 | $125.00 |
| 0390 | Flashing arrow panel (6161040) | EACH | 1 | $1,000.00 | $1,000.00 | $1,200.00 |
| 0400 | Sequential flashing warning light (6161055) | EACH | 15 | $100.00 | $100.00 | $110.00 |
| 0410 | Mobilization (6181000) | LS | 1 | $80,000 | $99,750 | $125,000 |
| 0420 | Additional mobilization for seeding (6181020) | EACH | 4 | $600.00 | $600.00 | $600.00 |
| 0430 | Preformed thermoplastic pavement marking, 24 in. white (6200015) | LF | 208 | $18.00 | $18.00 | $18.00 |
| 0440 | Preformed thermoplastic pavement marking, 24 in. yellow (6200018) | LF | 21 | $20.00 | $20.00 | $20.00 |
| 0450 | Preformed thermoplastic pavement marking, left/right arrow (6200021) | EACH | 15 | $250.00 | $250.00 | $250.00 |
| 0460 | Temporary removable marking tape 4 in., white (6205301B) | LF | 4,860 | $1.25 | $1.25 | $1.25 |
| 0470 | Temporary removable marking tape 4 in., yellow (6205303B) | LF | 5,937 | $1.25 | $1.25 | $1.25 |
| 0480 | Temporary non-removable marking tape left/right arrow (6205440A) | EACH | 6 | $150.00 | $150.00 | $150.00 |
| 0490 | 4 in. yellow class 2 pavement marking paint (25-mil, type L beads) (6205901B) | LF | 5,074 | $2.25 | $2.25 | $2.25 |
| 0500 | 4 in. white class 1 pavement marking paint (18-mil, type P beads) (6206000D) | LF | 5,595 | $1.25 | $1.25 | $1.25 |
| 0510 | Pavement marking removal (6207001) | LF | 7,316 | $0.40 | $0.40 | $40.00 |
| 0520 | Pavement marking removal (symbols) (6207002) | EACH | 3 | $100.00 | $100.00 | $100.00 |
| 0530 | Contractor furnished surveying and staking (6274000) | LS | 1 | $25,000 | $15,000 | $35,000 |
| 0540 | Mechanically stabilized earth wall systemssmall block retaining wall (7201000) | SF | 647 | $46.00 | $81.50 | $85.00 |
| 0550 | 15 in. pipe group B (7250315A) | LF | 183 | $75.00 | $55.00 | $75.00 |
| 0560 | 18 in. pipe group B (7250318A) | LF | 92 | $85.00 | $59.00 | $85.00 |
| 0570 | 24 in. pipe group B (7250324A) | LF | 12 | $150.00 | $150.00 | $150.00 |
| 0580 | 18 in. pipe group A (7261018) | LF | 87 | $100.00 | $77.00 | $85.00 |
| 0590 | Precast concrete drop inlet 4 FT X 2 FT (7311042) | FT | 13 | $1,000.00 | $670.00 | $750.00 |
| 0600 | Precast concrete drop inlet 5 FT X 3 FT (7311053) | FT | 8 | $1,875.00 | $770.00 | $1,050.00 |
| 0610 | 18 in. or allowed substitute group B flared end section (7320018A) | EACH | 2 | $600.00 | $450.00 | $1,000.00 |
| 0620 | 24 in. or allowed substitute group B flared end section (7320024A) | EACH | 1 | $1,000.00 | $575.00 | $1,500.00 |
| 0630 | Turf type tall fescue sodding (8031000A) | SY | 3,688 | $11.00 | $11.50 | $11.50 |
| 0640 | Rock ditch check (8061005) | LF | 168 | $10.00 | $12.00 | $65.00 |
| 0650 | Curb inlet check (8061007A) | EACH | 6 | $100.00 | $100.00 | $100.00 |
| 0660 | Sediment removal (8061016) | CY | 39 | $40.00 | $20.00 | $65.00 |
| 0670 | Temporary seeding (8061017) | ACRE | 0.80 | $1,000.00 | $1,000.00 | $1,000.00 |
| 0680 | Silt fence (8061019) | LF | 1,039 | $3.00 | $3.00 | $3.00 |
| 0690 | Lighting pole, 30 FT. or 9.0 M, type at (9011030) | EACH | 5 | $3,022.00 | $3,022.00 | $3,022.00 |
| 0700 | Bracket arm, 8 FT. or 2.4 M (9011108) | EACH | 3 | $664.00 | $664.00 | $664.00 |
| 0710 | Bracket arm, 12 FT. or 3.6 M (9011112) | EACH | 2 | $1,019.00 | $1,019.00 | $1,019.00 |
| 0720 | Bracket arm, 15 FT. or 4.6 M (9011115) | EACH | 1 | $1,059.00 | $1,059.00 | $1,059.00 |
| 0730 | Luminaire, LED-A (9011311) | EACH | 6 | $432.00 | $432.00 | $432.00 |
| 0740 | Conduit, 2 in. rigid, in trench (9013002) | LF | 5 | $20.00 | $20.00 | $20.00 |
| 0750 | Conduit, 3 in. rigid, pushed (9014003) | LF | 801 | $22.00 | $22.00 | $22.00 |
| 0760 | Trenching type I (9015010) | LF | 183 | $12.00 | $12.00 | $12.00 |
| 0770 | Pull box, preformed class 1 (9016110) | EACH | 2 | $1,850.00 | $1,850.00 | $1,850.00 |
| 0780 | Pull box, preformed class 2 (9016111) | EACH | 1 | $2,458.00 | $2,458.00 | $2,458.00 |
| 0790 | Cable, 2 AWG 1 conductor (9017002) | LF | 80 | $4.53 | $4.53 | $4.53 |
| 0800 | Cable, 10 AWG 1 conductor, pole and bracket (9017110) | LF | 440 | $1.00 | $1.00 | $1.00 |
| 0810 | Cable-conduit, 1 in., 2 conductors and 1 bare neutral, 6 AWG (9017404) | LF | 1,020 | $6.28 | $6.28 | $6.28 |
| 0820 | Pole foundation (30 FT. or 9.0 M mounting height) (9018230) | EACH | 5 | $1,828.00 | $1,828.00 | $1,828.00 |
| 0830 | Power supply assembly, type 2, 240/120 volt service, lighting only (9018612) | EACH | 1 | $11,176 | $11,176 | $11,176 |
| 0840 | Signal head, type 3S (9020213) | EACH | 1 | $1,054.00 | $1,054.00 | $1,054.00 |
| 0850 | Signal head, type 3B (9020513) | EACH | 5 | $1,891.00 | $1,891.00 | $1,891.00 |
| 0860 | Signal head, type 4B (9020514) | EACH | 1 | $1,542.00 | $1,542.00 | $1,542.00 |
| 0870 | SH-flat sheet - signal sign (9020833) | SF | 36 | $40.00 | $40.00 | $40.00 |
| 0880 | Signal sign, mounting hardware (9020834) | EACH | 4 | $408.00 | $408.00 | $408.00 |
| 0890 | Post, signal 8 FT. (9022708) | EACH | 1 | $1,311.00 | $1,311.00 | $1,311.00 |
| 0900 | Post, type CL, 30 FT. arm or 9.1 M arm (9023130) | EACH | 1 | $13,028 | $13,028 | $13,028 |
| 0910 | Post, type B, longest arm 40 FT. or 12.2 M (9023340) | EACH | 1 | $22,678 | $22,678 | $22,678 |
| 0920 | Controller assembly housing, NEMA TS2 controller (9024283) | EACH | 1 | $28,850 | $28,850 | $28,850 |
| 0930 | Accessible pedestrian signal (9024921) | EACH | 2 | $2,702.00 | $2,702.00 | $2,702.00 |
| 0940 | Video detection system (9024975) | EACH | 1 | $27,431 | $27,431 | $27,431 |
| 0950 | Conduit, 3 in., trench with tracer wire (9025300) | LF | 233 | $18.00 | $18.00 | $18.00 |
| 0960 | Conduit, 3 in., pushed with tracer wire (9027300) | LF | 183 | $22.00 | $22.00 | $22.00 |
| 0970 | Cable, 10 AWG 1 conductor, pole and bracket (9028100) | LF | 80 | $1.00 | $1.00 | $1.00 |
| 0980 | Cable, 8 AWG 1 conductor, power (9028208) | LF | 550 | $1.55 | $1.55 | $1.55 |
| 0990 | Cable, 12 AWG 2 conductor (9028302) | LF | 170 | $1.50 | $1.50 | $1.50 |
| 1000 | Cable, 16 AWG 2 conductor (9028308) | LF | 280 | $1.35 | $1.35 | $1.35 |
| 1010 | Cable, 16 AWG 5 conductor (9028310) | LF | 280 | $1.45 | $1.45 | $1.45 |
| 1020 | Cable, 16 AWG 7 conductor (9028311) | LF | 890 | $1.65 | $1.65 | $1.65 |
| 1030 | Power supply assembly, type 2 (9028620) | EACH | 1 | $11,000 | $11,000 | $11,000 |
| 1040 | Pull box, preformed class 1 (9028810) | EACH | 2 | $1,850.00 | $1,850.00 | $1,850.00 |
| 1050 | Pull box, preformed class 2 (9028811) | EACH | 1 | $2,458.00 | $2,458.00 | $2,458.00 |
| 1060 | Pull box, preformed class 3 (9028812) | EACH | 1 | $3,400.00 | $3,400.00 | $3,400.00 |
| 1070 | Base, concrete (9029100) | CY | 7.20 | $1,800.00 | $1,800.00 | $1,800.00 |
| 1080 | Misc.countdown pedestrian signal head, type 1S (9029902) | EACH | 2 | $887.00 | $887.00 | $887.00 |
| 1090 | 36 in. surface-mount delineator post (9031242) | EACH | 133 | $70.00 | $70.00 | $150.00 |
| 1100 | U-channel post, 3 LB (9031250A) | LF | 14 | $20.00 | $20.00 | $25.00 |
| 1110 | 2.5 in. PSST post - 12 GA. (9031280) | LF | 53 | $20.00 | $20.00 | $30.00 |
| 1120 | Driven post anchor for 2.5 in. PSST - 7 GA. (9031281A) | EACH | 5 | $250.00 | $250.00 | $250.00 |
| 1130 | SH-flat sheet (9035004A) | SF | 60 | $20.00 | $20.00 | $30.00 |
| 1140 | Conduit, 3 in., rigid, in trench (9105201) | LF | 327 | $18.00 | $18.00 | $18.00 |
| 1150 | Conduit, 3 in., rigid, pushed (9107201) | LF | 336 | $22.00 | $22.00 | $22.00 |
| 1160 | Fiber optic cable, 12-strand, single mode (9108353) | LF | 156 | $6.00 | $6.00 | $6.00 |
| 1170 | Fiber optic cable, 48-strand, single mode (9108354) | LF | 820 | $6.00 | $6.00 | $6.00 |
| 1180 | Pull box, preformed class 2 (9108811) | EACH | 3 | $2,450.00 | $2,450.00 | $2,450.00 |
| 1190 | Pull box, preformed class 5 (9108816) | EACH | 1 | $3,900.00 | $3,900.00 | $3,900.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from MoDOT's tabulation for this contract. MoDOT letting tabulation PDFs (vendor ranking and bid tabulation), January 2020 to October 2026. About one bid in eight did not match its published total and is left out. Item codes from before mid 2021 are written in the current MoDOT format so one item groups across years.
Every contract let that day: MoDOT letting of December 12, 2025. Compiled by Mirage Metrics.