MoDOT contract 260618-D05 bid tabulation
JCD0204 - ROUTE 63 - BOONE COUNTY. Let by Missouri DOT on June 18, 2026, Boone, Central. 4 bids received; low bid $1,510,984 by Capital Paving & Construction, LLC.
- Owner
- Missouri DOT
- Letting
- 18 JUN 2026
- Pay items
- 59
- Data through
- 16 OCT 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Capital Paving & Construction, LLC | $1,510,984 | Low |
| 2 | Emery Sapp & Sons, Inc. | $1,789,105 | +18% |
| 3 | Hardy Construction, LLC | $1,801,592 | +19% |
| 4 | Don Schnieders Excavating Company, Inc. | $2,374,322 | +57% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Capital Paving & Construction, LLC | 2. Emery Sapp & Sons, Inc. | 3. Hardy Construction, LLC | 4. Don Schnieders Excavating Company, Inc. |
|---|---|---|---|---|---|---|---|
| 0010 | Removal of improvements (2022010) | LS | 1 | $62,826 | $85,000 | $96,900 | $137,400 |
| 0020 | Class 3 excavation (2063000) | CY | 25 | $41.17 | $21.00 | $26.50 | $75.20 |
| 0030 | Linear grading class 2 (2072000) | STA | 85.60 | $1,246.58 | $2,200.00 | $1,900.00 | $2,715.00 |
| 0040 | Type 5 aggregate for base (6 in. thick) (3040506) | SY | 9,180 | $15.59 | $17.00 | $22.00 | $21.30 |
| 0050 | 8 inches, bituminous pavement (4010101) | SY | 1,308.30 | $65.00 | $72.00 | $65.00 | $65.00 |
| 0060 | Bituminous pavement mixture PG64-22, (BP-1) (4011209) | TON | 379.30 | $160.00 | $176.00 | $160.00 | $160.00 |
| 0070 | Misc.8 in. optional pavement (4019905) | SY | 7,872.30 | $65.00 | $72.00 | $65.00 | $110.00 |
| 0080 | Tack coat - non-tracking (4071007) | GAL | 350 | $3.60 | $4.00 | $3.60 | $3.60 |
| 0090 | Pipe collar, type A (6044011) | EACH | 1 | $735.42 | $3,100.00 | $3,900.00 | $2,500.00 |
| 0100 | Rock lining (6097000) | CY | 3 | $111.86 | $155.00 | $200.00 | $350.00 |
| 0110 | Changeable message sign with communication interface, contractor furnished retained (6161099) | EACH | 4 | $4,118.83 | $2,750.00 | $2,500.00 | $2,400.00 |
| 0120 | Misc.lump sum temporary traffic control (6169901) | LS | 1 | $16,000 | $20,000 | $16,000 | $20,072 |
| 0130 | Mobilization (6181000) | LS | 1 | $166,069 | $180,000 | $255,000 | $370,000 |
| 0140 | Additional mobilization for seeding (6181020) | EACH | 1 | $600.00 | $600.00 | $600.00 | $600.00 |
| 0150 | Pavement edge treatment (6191000) | LF | 5,012 | $1.00 | $2.50 | $6.75 | $8.80 |
| 0160 | 6 in. white class 2 pavement marking paint (25-mil, type L beads) (6205902B) | LF | 12,865 | $0.66 | $0.75 | $0.66 | $0.75 |
| 0170 | 6 in. yellow class 2 pavement marking paint (25-mil, type L beads) (6205903B) | LF | 1,541 | $0.66 | $0.75 | $0.66 | $1.50 |
| 0180 | 4 in. yellow class 1 pavement marking paint (18-mil, type P beads) (6206001D) | LF | 164 | $2.00 | $2.20 | $2.00 | $2.00 |
| 0190 | 8 in. white class 1 pavement marking paint (18-mil, type P beads) (6206108B) | LF | 74 | $5.00 | $5.50 | $5.00 | $4.00 |
| 0200 | Coldmilling bituminous pavement for removal of surfacing (3 in. thick or less) (6221001) | SY | 4,176 | $5.00 | $5.50 | $5.00 | $5.00 |
| 0210 | Bituminous shoulder rumble strip (6261000A) | STA | 15 | $650.00 | $220.00 | $200.00 | $900.00 |
| 0220 | Contractor furnished surveying and staking (6274000) | LS | 1 | $7,000.00 | $35,000 | $25,000 | $15,000 |
| 0230 | 18 in. pipe group C (7250418) | LF | 80 | $88.95 | $110.00 | $125.00 | $75.00 |
| 0240 | 24 in. pipe group A (7261024) | LF | 9 | $212.03 | $250.00 | $108.00 | $200.00 |
| 0250 | 24 in. or allowed substitute group A flared end section (7320624A) | EACH | 1 | $716.47 | $950.00 | $1,400.00 | $820.00 |
| 0260 | 18 in. or allowed substitute group C flared end section (7320818A) | EACH | 2 | $393.97 | $565.00 | $825.00 | $540.00 |
| 0270 | Mulching (8025006) | ACRE | 4.20 | $1,300.00 | $1,450.00 | $1,950.00 | $1,300.00 |
| 0280 | Seeding - cool season grasses (8051000A) | ACRE | 4.20 | $1,300.00 | $1,450.00 | $1,900.00 | $1,300.00 |
| 0290 | Sediment trap rock (8061004) | CY | 15 | $105.11 | $180.00 | $225.00 | $100.00 |
| 0300 | Rock ditch check (8061005) | LF | 198 | $30.00 | $33.00 | $25.00 | $30.00 |
| 0310 | Sediment removal (8061016) | CY | 118 | $51.05 | $42.50 | $75.00 | $20.00 |
| 0320 | Silt fence (8061019) | LF | 8,065 | $2.50 | $2.75 | $2.60 | $2.50 |
| 0330 | Lighting pole, 45 FT. or 13.5 M, type at design 2 (9011062) | EACH | 5 | $2,837.00 | $3,135.00 | $4,200.00 | $4,200.00 |
| 0340 | Bracket arm, 15 FT. or 4.6 M (9011115) | EACH | 5 | $1,220.00 | $1,350.00 | $1,200.00 | $1,250.00 |
| 0350 | Luminaire, LED-B (9011312) | EACH | 5 | $525.00 | $580.00 | $560.00 | $560.00 |
| 0360 | Base mounted control station 240 volt - 4 circuit (9012230) | EACH | 1 | $8,000.00 | $8,840.00 | $13,000 | $13,000 |
| 0370 | Conduit, 2 in. rigid, in trench (9013002) | LF | 23 | $1.00 | $5.00 | $25.00 | $25.00 |
| 0380 | Conduit, 4 in. rigid, in trench (9013004) | LF | 16 | $40.00 | $44.00 | $30.00 | $30.00 |
| 0390 | Conduit, 3 in. rigid, pushed (9014003) | LF | 270 | $50.00 | $55.00 | $25.00 | $25.00 |
| 0400 | Trenching type I (9015010) | LF | 4,287 | $10.00 | $11.00 | $10.00 | $10.00 |
| 0410 | Pull box, preformed class 1 (9016110) | EACH | 6 | $1,219.00 | $1,350.00 | $1,950.00 | $1,950.00 |
| 0420 | Pull box, preformed class 2 (9016111) | EACH | 7 | $1,843.00 | $2,035.00 | $2,700.00 | $2,700.00 |
| 0430 | Cable, 10 AWG 1 conductor, pole and bracket (9017110) | LF | 600 | $1.00 | $1.10 | $1.00 | $1.00 |
| 0440 | Cable-conduit, 1 in., 2 conductors and 1 bare neutral, 8 AWG (9017407) | LF | 5,000 | $9.50 | $10.50 | $5.50 | $5.50 |
| 0450 | Pole foundation (45 FT. or 13.5 M mounting height) (9018245) | EACH | 5 | $1,250.00 | $1,380.00 | $2,919.00 | $2,919.00 |
| 0460 | Power supply assembly, type 2, 240/120 volt service, lighting only (9018612) | EACH | 1 | $13,150 | $14,500 | $12,000 | $12,000 |
| 0470 | Cable, 2 AWG 1 conductor, power (9028202) | LF | 110 | $1.00 | $2.00 | $6.00 | $6.00 |
| 0480 | Concrete footings, embedded (9031010) | CY | 2 | $1,466.66 | $1,935.00 | $1,466.66 | $1,467.00 |
| 0490 | I-beam posts (9031210) | LB | 1,230 | $6.21 | $7.50 | $5.66 | $5.70 |
| 0500 | Pipe posts (9031220) | LB | 620 | $6.14 | $6.50 | $6.14 | $6.14 |
| 0510 | Breakaway assembly (perforated square steel tube) (9031241) | EACH | 4 | $720.00 | $500.00 | $720.00 | $720.00 |
| 0520 | 7 FT. channel post delineator, white (9031256) | EACH | 16 | $131.11 | $55.00 | $131.11 | $131.11 |
| 0530 | 2 in. PSST post - 12 GA. (9031270A) | LF | 384 | $14.18 | $24.00 | $14.18 | $14.18 |
| 0540 | Concrete post anchor for 2 in. PSST. - 7 GA. (9031274) | EACH | 24 | $147.84 | $276.00 | $147.84 | $147.84 |
| 0550 | 2.5 in. PSST post - 12 GA. (9031280) | LF | 144 | $23.09 | $28.00 | $23.09 | $23.09 |
| 0560 | Concrete post anchor for 2.5 in. PSST. - 7 GA. (9031285) | EACH | 9 | $275.55 | $300.00 | $275.55 | $275.55 |
| 0570 | SH-flat sheet (9035004A) | SF | 282 | $17.50 | $28.00 | $17.50 | $17.50 |
| 0580 | ST-structural (9035011A) | SF | 552 | $23.91 | $39.00 | $23.91 | $23.91 |
| 0590 | SHF-flat sheet fluorescent (9035069A) | SF | 50 | $46.96 | $33.00 | $46.96 | $46.96 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from MoDOT's tabulation for this contract. MoDOT letting tabulation PDFs (vendor ranking and bid tabulation), January 2020 to October 2026. About one bid in eight did not match its published total and is left out. Item codes from before mid 2021 are written in the current MoDOT format so one item groups across years.
Every contract let that day: MoDOT letting of June 18, 2026. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.