MoDOT contract 251212-B03 bid tabulation
JNE0051 - ROUTE J - LINCOLN COUNTY. Let by Missouri DOT on December 12, 2025, Lincoln, Northeast. 5 bids received; low bid $1,899,071 by Magruder Construction Co., Inc..
- Owner
- Missouri DOT
- Letting
- 12 DEC 2025
- Pay items
- 57
- Data through
- 16 OCT 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Magruder Construction Co., Inc. | $1,899,071 | Low |
| 2 | Bleigh Construction Company | $1,974,288 | +4.0% |
| 3 | E & C Bridge, LLC | $2,022,877 | +7.0% |
| 4 | Pace Construction Company, LLC | $2,075,000 | +9.0% |
| 5 | Capital Paving & Construction, LLC | $2,151,739 | +13% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Magruder Construction Co., Inc. | 2. Bleigh Construction Company | 3. E & C Bridge, LLC | 4. Pace Construction Company, LLC | 5. Capital Paving & Construction, LLC |
|---|---|---|---|---|---|---|---|---|
| 0010 | Clearing and grubbing (2013000) | ACRE | 1 | $2,175.00 | $24,400 | $35,000 | $18,000 | $25,000 |
| 0020 | Removal of improvements (2022010) | LS | 1 | $21,000 | $46,700 | $55,000 | $16,992 | $18,000 |
| 0030 | Class A excavation (2031000) | CY | 3,993 | $10.50 | $16.60 | $35.00 | $21.40 | $19.00 |
| 0040 | Compacting embankment (2036000) | CY | 804 | $4.50 | $6.00 | $25.00 | $9.00 | $8.00 |
| 0050 | Class 3 excavation (2063000) | CY | 36 | $50.00 | $69.00 | $65.00 | $65.00 | $45.00 |
| 0060 | Subgrade compaction (6-inch depth) (2101006A) | 100F | 4 | $970.00 | $1,530.00 | $1,800.00 | $850.00 | $1,450.00 |
| 0070 | Furnishing rock fill (2142000) | CY | 2,154 | $25.00 | $18.20 | $28.00 | $32.00 | $24.00 |
| 0080 | Placing rock fill (2143000) | CY | 2,154 | $10.00 | $23.40 | $18.00 | $15.00 | $6.00 |
| 0090 | Type 1 aggregate for base (4 in. thick) (3040143) | SY | 893 | $14.00 | $10.70 | $12.00 | $10.50 | $15.00 |
| 0100 | Gravel (A) or crushed stone (B) (3105002) | TON | 75 | $23.00 | $47.00 | $50.00 | $101.00 | $16.00 |
| 0110 | Misc.optional pavement (4019905) | SY | 892.20 | $80.32 | $80.32 | $80.32 | $62.00 | $83.00 |
| 0120 | Furnishing type 2 rock blanket (6113020) | CY | 588 | $52.00 | $50.20 | $48.00 | $50.00 | $60.00 |
| 0130 | Placing type 2 rock blanket (6113040) | CY | 588 | $26.00 | $28.00 | $25.00 | $38.00 | $35.00 |
| 0140 | Construction signs (6161005) | SF | 807 | $7.00 | $7.25 | $8.00 | $7.25 | $7.07 |
| 0150 | Type 3 moveable barricade (6161030) | EACH | 10 | $145.00 | $150.00 | $155.00 | $150.00 | $146.45 |
| 0160 | Changeable message sign without communication interface, contractor furnished retained (6161098A) | EACH | 2 | $3,300.00 | $2,400.00 | $2,500.00 | $2,400.00 | $3,332.97 |
| 0170 | Mobilization (6181000) | LS | 1 | $125,000 | $190,200 | $140,000 | $188,689 | $204,000 |
| 0180 | 4 in. white class 1 pavement marking paint (18-mil, type P beads) (6206000D) | LF | 1,760 | $0.53 | $0.70 | $0.70 | $0.70 | $0.54 |
| 0190 | 4 in. yellow class 1 pavement marking paint (18-mil, type P beads) (6206001D) | LF | 959 | $0.53 | $0.70 | $0.70 | $0.70 | $0.54 |
| 0200 | Permanent erosion control geotextile (6240103A) | SY | 881 | $4.00 | $3.74 | $3.50 | $2.00 | $1.15 |
| 0210 | Contractor furnished surveying and staking (6274000) | LS | 1 | $11,000 | $16,780 | $3,875.00 | $3,875.00 | $6,999.94 |
| 0220 | 18 in. pipe group A (7261018) | LF | 52 | $128.00 | $53.40 | $55.00 | $90.00 | $124.00 |
| 0230 | 18 in. or allowed substitute group A flared end section (7320618A) | EACH | 2 | $705.00 | $800.00 | $550.00 | $1,200.00 | $322.00 |
| 0240 | Misc.seeding and mulching (8059901) | LS | 1 | $3,650.00 | $3,650.00 | $3,650.00 | $3,650.00 | $3,649.97 |
| 0250 | Sediment trap rock (8061004) | CY | 0.50 | $102.00 | $650.00 | $800.00 | $1,170.00 | $2,399.98 |
| 0260 | Rock ditch check (8061005) | LF | 210 | $16.00 | $15.00 | $25.00 | $21.00 | $20.00 |
| 0270 | Sediment removal (8061016) | CY | 17 | $28.00 | $48.00 | $10.00 | $0.01 | $30.00 |
| 0280 | Silt fence (8061019) | LF | 271 | $4.00 | $4.00 | $4.00 | $4.00 | $4.00 |
| 0290 | Type C berm (8061050) | LF | 415 | $36.00 | $33.00 | $18.00 | $25.00 | $35.00 |
| 0300 | MGS guardrail (6061060) | LF | 425 | $27.87 | $32.00 | $27.87 | $27.87 | $28.15 |
| 0310 | MGS bridge approach transition section (regular/no curb) (6061069) | EACH | 4 | $3,500.00 | $4,000.00 | $3,500.00 | $3,500.00 | $3,534.97 |
| 0320 | Type A crashworthy end terminal (MASH) (6063014) | EACH | 4 | $3,290.68 | $3,800.00 | $3,290.68 | $3,290.68 | $3,323.56 |
| 0330 | 2 in. PSST post - 12 GA. (9031270A) | LF | 48 | $41.24 | $28.00 | $41.24 | $41.24 | $41.65 |
| 0340 | Driven post anchor for 2 in. PSST - 12 GA. (9031271A) | EACH | 3 | $375.60 | $325.00 | $375.60 | $375.60 | $379.35 |
| 0350 | SHF-flat sheet fluorescent (9035069A) | SF | 36 | $27.76 | $36.00 | $27.76 | $27.76 | $28.04 |
| 0360 | Removal of miscellaneous acm (non-friable) (2024043) | SF | 4 | $1,200.00 | $1,200.00 | $1,200.00 | $1,200.00 | $1,199.99 |
| 0370 | Class 1 excavation (2061000) | CY | 80 | $63.00 | $66.00 | $50.00 | $100.00 | $150.00 |
| 0380 | Removal of bridges (2160500) | LS | 1 | $124,000 | $91,300 | $97,000 | $100,000 | $80,000 |
| 0390 | Bridge approach slab (minor road) (5031011A) | SY | 117 | $135.00 | $120.00 | $80.32 | $120.00 | $151.00 |
| 0400 | Drilled shafts (4 FT. 0 in. dia.) (7011106) | LF | 63 | $1,010.00 | $940.00 | $950.00 | $1,250.00 | $1,200.00 |
| 0410 | Rock sockets (3 FT 6 in. dia.) (7011205) | LF | 44 | $735.00 | $1,220.00 | $1,200.00 | $550.00 | $625.00 |
| 0420 | Video camera inspection (7011300) | EACH | 4 | $380.00 | $1,100.00 | $1,100.00 | $750.00 | $1,100.00 |
| 0430 | Foundation inspection holes (7011400) | LF | 84 | $180.00 | $163.00 | $163.00 | $275.00 | $273.00 |
| 0440 | Sonic logging testing (7011600) | EACH | 4 | $1,400.00 | $4,580.00 | $3,000.00 | $4,000.00 | $3,800.00 |
| 0450 | Galvanized structural steel piles (14 in) (7021214) | LF | 246 | $180.00 | $157.00 | $125.00 | $220.00 | $185.00 |
| 0460 | Pre-bore for piling (7026000) | LF | 96 | $237.00 | $200.00 | $250.00 | $275.00 | $241.00 |
| 0470 | Pile point reinforcement (7027000) | EACH | 12 | $160.00 | $170.00 | $250.00 | $150.00 | $152.00 |
| 0480 | Class B concrete (substructure) (7032003) | CY | 26.80 | $1,660.00 | $1,430.00 | $1,200.00 | $2,000.00 | $2,145.00 |
| 0490 | Class B-1 concrete (substructure) (7034003) | CY | 48 | $1,580.00 | $1,576.00 | $1,100.00 | $1,550.00 | $2,300.00 |
| 0500 | Type D barrier (7034219A) | LF | 613 | $135.00 | $125.00 | $115.00 | $115.00 | $125.00 |
| 0510 | Slab on concrete NU-girder (7034221) | SY | 900 | $435.00 | $407.00 | $400.00 | $450.00 | $559.00 |
| 0520 | NU 53, prestressed concrete NU-girder (7056023) | LF | 840 | $426.00 | $392.00 | $475.00 | $475.00 | $369.00 |
| 0530 | Reinforcing steel (bridges) (7061060) | LB | 20,250 | $2.70 | $2.46 | $1.75 | $2.00 | $3.64 |
| 0540 | Steel intermediate diaphragm for P/S concrete girders (7123301) | EACH | 8 | $1,780.00 | $1,630.00 | $1,950.00 | $1,350.00 | $1,375.00 |
| 0550 | Slab drain (7123610) | EACH | 28 | $440.00 | $550.00 | $425.00 | $550.00 | $640.00 |
| 0560 | Vertical drain at end bents (7151001) | EACH | 2 | $2,625.00 | $3,000.00 | $1,800.00 | $1,500.00 | $2,600.00 |
| 0570 | Laminated neoprene bearing pad (tapered) (7161003) | EACH | 18 | $690.00 | $460.00 | $650.00 | $625.00 | $600.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from MoDOT's tabulation for this contract. MoDOT letting tabulation PDFs (vendor ranking and bid tabulation), January 2020 to October 2026. About one bid in eight did not match its published total and is left out. Item codes from before mid 2021 are written in the current MoDOT format so one item groups across years.
Every contract let that day: MoDOT letting of December 12, 2025. Compiled by Mirage Metrics.