Magruder Construction Co., Inc.: MoDOT bid record

Magruder Construction Co., Inc. submitted 17 bids on Missouri DOT contracts in the data, from 16 OCT 2020 to 20 MAR 2026, and was the low bidder on 3 of them (18%). When it was not low, its total sat a median +23% above the low bid.

Owner
Missouri DOT
Low bid volume
$7,620,467
Latest bid
20 MAR 2026
Data through
16 OCT 2026
17Bids
3Low bids
18Win rate, percent
+23%Median gap to the low bid when not low, 14 bids

By year

YearBidsLow bidsWin rate
2020100%
2021200%
2023100%
2024700%
20254125%
202622100%
Magruder Construction Co., Inc., MoDOT: bids and low bids by year of letting

By district

DistrictBidsLow bidsWin rate
Northeast9222%
St. Louis300%
Southeast200%
Central100%
Southwest100%
Kansas City11100%
Magruder Construction Co., Inc., MoDOT: bids and low bids by district

Pay items where it is most often lowest

Pay itemCodeUnitLines bidLowest on the lineIts median priceAll bidders' median
MGS guardrail6061060LF1212 (100%)$30.00$30.00
Construction signs6161005SF1611 (69%)$8.00$7.00
Type A crashworthy end terminal (MASH)6063014EACH1411 (79%)$3,550.00$3,300.00
Silt fence8061019LF179 (53%)$3.40$3.45
Advanced warning rail system6161008EACH138 (62%)$45.00$51.40
MGS bridge approach transition section (regular/no curb)6061069EACH118 (73%)$4,000.00$3,800.00
SHF-flat sheet fluorescent9035069ASF98 (89%)$28.00$32.00
Compacting embankment2036000CY127 (58%)$5.00$7.65
Type III moveable barricade6161030EACH117 (64%)$135.00$156.69
Placing type 2 rock blanket6113040CY166 (38%)$21.00$26.00
Class A excavation2031000CY146 (43%)$11.12$20.00
Rock ditch check8061005LF155 (33%)$17.00$20.00
Magruder Construction Co., Inc., MoDOT: pay items where its unit price was the lowest on the line

A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.

Who it meets most

Magruder Construction Co., Inc., MoDOT: the firms on the same contracts most often

Latest bids

LetContractDistrictProjectRankIts bidAgainst the low bid
20 MAR 2026260320-B03NortheastJNE0047 - ROUTE 24 - MONROE COUNTY1 of 1$3,124,717Low
16 JAN 2026260116-C04Kansas CityJKU0144 - ROUTE D - CASS COUNTY1 of 10$2,596,679Low, 4.0% under the second
12 DEC 2025251212-B03NortheastJNE0051 - ROUTE J - LINCOLN COUNTY1 of 5$1,899,071Low, 4.0% under the second
14 NOV 2025251114-H05SoutheastJSE0026-ROUTE N- ST GENEVIEVE COUNTY4 of 7$1,194,812+20%
16 MAY 2025250516-G06SouthwestJSR0184 - ROUTES 49, 13 - VERNON COUNTY2 of 3$1,987,145+26%
21 FEB 2025250221-B03NortheastJNE0053, JNE0154 - ROUTE K - MONTGOMERY10 of 10$5,690,218+45%
19 APR 2024240419-B01NortheastJNE0127-ROUTE K -SHELBY COUNTY6 of 6$1,169,470+24%
19 APR 2024240419-F07St. LouisJSLM0028 - ROUTE I-64, I-70, 370 - ST LOUIS COUNTY AND ST LOUIS CITY2 of 6$831,205+14%
15 MAR 2024240315-B01NortheastJ2P3395 - ROUTE 79,D,W - LINCOLN, PIKE5 of 5$640,415+66%
15 MAR 2024240315-F02St. LouisJ6S2319, J6S3563 - ROUTE Y - FRANKLIN County4 of 4$2,830,439+6.0%
16 FEB 2024240216-B02NortheastJNE0126 - ROUTE 161 - MONTGOMERY COUNTY5 of 9$1,293,393+15%
19 JAN 2024240119-B02NortheastJ2S3317 - ROUTE AA - MONTORE COUNTY8 of 10$1,145,973+23%
19 JAN 2024240119-H03SoutheastJ9P3849 - ROUTE 49 - IRON COUNTY5 of 5$1,518,586+38%
18 AUG 2023230818-F03St. LouisJSL0004 - ROUTE D - ST. CHARLES COUNTY4 of 9$1,031,767+22%
19 MAR 2021210319-B03NortheastJ2S3359 - ROUTE 2ND STREET - LINCOLN COUNTY4 of 4$203,418+143%
19 FEB 2021210219-B02NortheastJ2S3005,J2S3330 - ROUTE M,CC - LINCOLN COUNTY2 of 4$1,617,304+1.0%
16 OCT 2020201016-D02CentralJ5S3176 - ROUTE J - GASCONADE COUNTY5 of 10$743,156+20%
Magruder Construction Co., Inc.: latest MoDOT bids in the data

How this record was read

MoDOT letting tabulation PDFs (vendor ranking and bid tabulation), January 2020 to October 2026. About one bid in eight did not match its published total and is left out. Item codes from before mid 2021 are written in the current MoDOT format so one item groups across years.

  • Every bid counted here matched its published total to within one dollar; MoDOT's rank decides who was low.
  • The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
  • A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.

A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy