MoDOT contract 260515-D05 bid tabulation
JCD0228 - ROUTE A - WASHINGTON COUNTY. Let by Missouri DOT on May 15, 2026, Washington, Central. 6 bids received; low bid $2,283,758 by Robertson Contractors, Inc..
- Owner
- Missouri DOT
- Letting
- 15 MAY 2026
- Pay items
- 47
- Data through
- 16 OCT 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Robertson Contractors, Inc. | $2,283,758 | Low |
| 2 | E & C Bridge, LLC | $2,319,042 | +2.0% |
| 3 | Gershenson Construction Co., Inc. | $2,406,648 | +5.0% |
| 4 | Kozeny-Wagner, Inc. | $2,458,311 | +8.0% |
| 5 | N.B. West Contracting Company | $2,610,000 | +14% |
| 6 | Louis-Company, LLC | $7,514,757 | +229% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Robertson Contractors, Inc. | 2. E & C Bridge, LLC | 3. Gershenson Construction Co., Inc. | 4. Kozeny-Wagner, Inc. | 5. N.B. West Contracting Company | 6. Louis-Company, LLC |
|---|---|---|---|---|---|---|---|---|---|
| 0010 | Clearing and grubbing (2013000) | ACRE | 1 | $8,500.00 | $17,500 | $16,000 | $12,185 | $21,200 | $19,457 |
| 0020 | Removal of improvements (2022010) | LS | 1 | $12,000 | $75,000 | $36,000 | $138,085 | $85,562 | $18,967 |
| 0030 | Class A excavation (2031000) | CY | 1,991 | $18.00 | $40.00 | $34.00 | $24.00 | $41.00 | $19.22 |
| 0040 | Compacting embankment (2036000) | CY | 505 | $10.00 | $18.00 | $32.00 | $10.50 | $8.00 | $27.31 |
| 0050 | Compacting in cut (2037075) | STA | 5.60 | $1,250.00 | $2,500.00 | $100.00 | $4,795.00 | $2,840.00 | $7.22 |
| 0060 | Class 3 excavation (2063000) | CY | 83 | $35.00 | $50.00 | $34.00 | $38.00 | $94.00 | $1,841.56 |
| 0070 | Type 1 aggregate for base (6 in. thick) (3040163) | SY | 539 | $24.00 | $15.00 | $17.00 | $15.50 | $33.00 | $21.83 |
| 0080 | Gravel (A) or crushed stone (B) (3105002) | TON | 22 | $48.00 | $50.00 | $22.00 | $206.00 | $120.00 | $86.50 |
| 0090 | Misc.optional pavement (4019905) | SY | 539.40 | $75.00 | $100.00 | $115.00 | $108.00 | $108.00 | $80.43 |
| 0100 | Furnishing type 2 rock blanket (6113020) | CY | 1,200 | $65.50 | $55.00 | $74.00 | $84.50 | $63.00 | $94.67 |
| 0110 | Placing type 2 rock blanket (6113040) | CY | 1,200 | $20.00 | $25.00 | $36.00 | $20.00 | $32.00 | $20.52 |
| 0120 | Changeable message sign without communication interface, contractor furnished retained (6161098A) | EACH | 2 | $4,200.00 | $4,500.00 | $4,500.00 | $4,000.00 | $2,500.00 | $9.71 |
| 0130 | Misc.lump sum temporary traffic control (6169901) | LS | 1 | $4,500.00 | $4,243.00 | $6,000.00 | $8,000.00 | $5,600.00 | $33.99 |
| 0140 | Mobilization (6181000) | LS | 1 | $200,000 | $225,000 | $180,000 | $222,286 | $250,000 | $194.25 |
| 0150 | 4 in. white class 1 pavement marking paint (18-mil, type P beads) (6206000D) | LF | 1,200 | $1.00 | $1.50 | $1.00 | $1.00 | $1.00 | $109.27 |
| 0160 | 4 in. yellow class 1 pavement marking paint (18-mil, type P beads) (6206001D) | LF | 1,200 | $1.00 | $1.50 | $1.00 | $1.00 | $1.00 | $2,124.66 |
| 0170 | Permanent erosion control geotextile (6240103A) | SY | 1,801 | $3.50 | $3.00 | $3.00 | $8.00 | $4.00 | $97.13 |
| 0180 | Contractor furnished surveying and staking (6274000) | LS | 1 | $15,000 | $10,000 | $20,000 | $8,000.00 | $4,800.00 | $5,766.94 |
| 0190 | 24 in. pipe group C (7250424) | LF | 50 | $120.00 | $75.00 | $150.00 | $126.00 | $189.00 | $169.97 |
| 0200 | 24 in. or allowed substitute group C flared end section (7320824A) | EACH | 2 | $750.00 | $475.00 | $800.00 | $2,102.00 | $3,230.00 | $166,000 |
| 0210 | Misc.seeding and mulching - cool season grasses) (8059901) | LS | 1 | $5,000.00 | $3,850.00 | $9,000.00 | $9,500.00 | $21,900 | $728.46 |
| 0220 | Rock ditch check (8061005) | LF | 20 | $16.00 | $25.00 | $50.00 | $30.00 | $30.00 | $0.85 |
| 0230 | Sediment removal (8061016) | CY | 7 | $0.01 | $5.00 | $1.00 | $50.00 | $74.00 | $0.85 |
| 0240 | Silt fence (8061019) | LF | 148 | $3.20 | $4.00 | $5.00 | $8.50 | $9.00 | $0.61 |
| 0250 | Type C berm (8061050) | LF | 307 | $15.00 | $15.00 | $15.00 | $100.00 | $47.00 | $0.61 |
| 0260 | 2 in. PSST post - 12 GA. (9031270A) | LF | 145 | $20.00 | $29.00 | $20.00 | $30.00 | $28.00 | $3.84 |
| 0270 | Driven post anchor for 2 in. PSST - 12 GA. (9031271A) | EACH | 14 | $200.00 | $175.00 | $200.00 | $150.00 | $225.00 | $42,493 |
| 0280 | SHF-flat sheet fluorescent (9035069A) | SF | 54 | $20.00 | $32.00 | $30.00 | $40.00 | $38.00 | $1,699.73 |
| 0290 | Class 1 excavation (2061000) | CY | 70 | $34.00 | $50.00 | $220.00 | $49.50 | $156.00 | $3,399.46 |
| 0300 | Removal of bridges (2160500) | LS | 1 | $70,000 | $85,000 | $150,000 | $127,453 | $75,000 | $60.71 |
| 0310 | Bridge approach slab (minor road) (5031011A) | SY | 108 | $290.00 | $275.00 | $240.00 | $272.00 | $252.00 | $249.89 |
| 0320 | Drilled shafts (4 FT. 0 in. dia.) (7011106) | LF | 80 | $1,350.00 | $1,100.00 | $1,250.00 | $890.00 | $757.00 | $2,185.37 |
| 0330 | Rock sockets (3 FT 6 in. dia.) (7011205) | LF | 42 | $1,400.00 | $1,350.00 | $2,200.00 | $1,072.00 | $1,240.00 | $3.52 |
| 0340 | Video camera inspection (7011300) | EACH | 6 | $1,000.00 | $500.00 | $900.00 | $1,100.00 | $679.00 | $34.26 |
| 0350 | Foundation inspection holes (7011400) | LF | 102 | $300.00 | $128.00 | $220.00 | $128.00 | $185.00 | $4,759.29 |
| 0360 | Sonic logging testing (7011600) | EACH | 6 | $3,250.00 | $2,300.00 | $2,600.00 | $4,946.00 | $5,620.00 | $2,453.10 |
| 0370 | Galvanized structural steel piles (12 in) (7021212) | LF | 245 | $180.00 | $120.00 | $235.00 | $160.00 | $240.00 | $3,857.56 |
| 0380 | Pile point reinforcement (7027000) | EACH | 10 | $325.00 | $250.00 | $120.00 | $150.00 | $187.00 | $1,238.02 |
| 0390 | Class B concrete (substructure) (7032003) | CY | 77.90 | $1,400.00 | $1,400.00 | $1,900.00 | $2,057.00 | $2,260.00 | $5.90 |
| 0400 | Type D barrier (7034219A) | LF | 741 | $140.00 | $100.00 | $110.00 | $129.00 | $117.00 | $7.41 |
| 0410 | Slab on concrete NU-girder (7034221) | SY | 1,039 | $510.00 | $475.00 | $475.00 | $443.00 | $520.00 | $402.70 |
| 0420 | NU 35, prestressed concrete NU-girder (7056021) | LF | 1,387 | $425.00 | $415.00 | $365.00 | $368.00 | $425.00 | $167.86 |
| 0430 | Reinforcing steel (bridges) (7061060) | LB | 27,260 | $2.35 | $3.00 | $2.40 | $2.00 | $3.00 | $21.95 |
| 0440 | Slab drain (7123610) | EACH | 18 | $550.00 | $550.00 | $850.00 | $646.00 | $1,110.00 | $1,208.80 |
| 0450 | Vertical drain at end bents (7151001) | EACH | 2 | $2,250.00 | $2,200.00 | $2,000.00 | $15,113 | $5,780.00 | $25.63 |
| 0460 | Plain neoprene bearing pad (7161000) | EACH | 8 | $250.00 | $200.00 | $250.00 | $392.00 | $419.00 | $35.23 |
| 0470 | Laminated neoprene bearing pad (7161002) | EACH | 24 | $315.00 | $250.00 | $300.00 | $467.00 | $414.00 | $424.93 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from MoDOT's tabulation for this contract. MoDOT letting tabulation PDFs (vendor ranking and bid tabulation), January 2020 to October 2026. About one bid in eight did not match its published total and is left out. Item codes from before mid 2021 are written in the current MoDOT format so one item groups across years.
Every contract let that day: MoDOT letting of May 15, 2026. Compiled by Mirage Metrics.