Robertson Contractors, Inc.: MoDOT bid record
Robertson Contractors, Inc. submitted 83 bids on Missouri DOT contracts in the data, from 17 JAN 2020 to 18 JUN 2026, and was the low bidder on 24 of them (29%). When it was not low, its total sat a median +13% above the low bid.
- Owner
- Missouri DOT
- Low bid volume
- $66,171,952
- Latest bid
- 18 JUN 2026
- Data through
- 16 OCT 2026
By year
| Year | Bids | Low bids | Win rate |
|---|---|---|---|
| 2020 | 11 | 4 | 36% |
| 2021 | 10 | 2 | 20% |
| 2022 | 7 | 4 | 57% |
| 2023 | 6 | 1 | 17% |
| 2024 | 13 | 2 | 15% |
| 2025 | 21 | 5 | 24% |
| 2026 | 15 | 6 | 40% |
By district
| District | Bids | Low bids | Win rate |
|---|---|---|---|
| Southeast | 69 | 21 | 30% |
| Central | 8 | 2 | 25% |
| Southwest | 4 | 1 | 25% |
| Kansas City | 1 | 0 | 0% |
| Northeast | 1 | 0 | 0% |
Pay items where it is most often lowest
| Pay item | Code | Unit | Lines bid | Lowest on the line | Its median price | All bidders' median |
|---|---|---|---|---|---|---|
| Construction signs | 6161005 | SF | 107 | 84 (79%) | $7.50 | $7.00 |
| Silt fence | 8061019 | LF | 120 | 68 (57%) | $3.50 | $3.45 |
| Placing type 2 rock blanket | 6113040 | CY | 107 | 68 (64%) | $20.00 | $26.00 |
| 4 in. white standard waterborne pavement marking paint, type P beads | 6206000C | LF | 76 | 68 (89%) | $0.62 | $0.20 |
| Advanced warning rail system | 6161008 | EACH | 76 | 61 (80%) | $45.00 | $51.40 |
| Seeding - cool season grasses | 8051000A | ACRE | 64 | 52 (81%) | $2,750.00 | $3,600.47 |
| Type A crashworthy end terminal (MASH) | 6063014 | EACH | 64 | 51 (80%) | $3,553.99 | $3,300.00 |
| MGS bridge approach transition section (regular/no curb) | 6061069 | EACH | 59 | 47 (80%) | $4,000.00 | $3,800.00 |
| 4 in. yellow standard waterborne pavement marking paint, type P beads | 6206001C | LF | 55 | 47 (85%) | $0.55 | $0.25 |
| Slab drain | 7123610 | EACH | 90 | 46 (51%) | $450.00 | $492.09 |
| Type III moveable barricade | 6161030 | EACH | 67 | 44 (66%) | $145.00 | $156.69 |
| Changeable message sign without communication interface, contractor furnished, contractor retained | 6161098A | EACH | 49 | 42 (86%) | $3,000.00 | $3,078.23 |
A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.
Who it meets most
| Firm | Contracts in common | That firm ranked ahead |
|---|---|---|
| Joe's Bridge & Grading, Inc. | 48 | 29 of 48 |
| West Plains Bridge & Grading, LLC | 22 | 11 of 22 |
| Penzel Construction Company, Inc. | 20 | 7 of 20 |
| Louis-Company, LLC | 13 | 3 of 13 |
| Mera Excavating, LLC | 8 | 3 of 8 |
| Hartman and Company, Inc. | 8 | 5 of 8 |
| Putz Construction, LLC | 8 | 1 of 8 |
| Phillips Hardy, Inc. | 7 | 2 of 7 |
| Gene Haile Excavating, Inc. | 7 | 6 of 7 |
| RL Persons Construction, Inc. | 7 | 5 of 7 |
Latest bids
| Let | Contract | District | Project | Rank | Its bid | Against the low bid |
|---|---|---|---|---|---|---|
| 18 JUN 2026 | 260618-H01 | Southeast | J9S3725 - ROUTE 114 - STODDARD COUNTY | 1 of 4 | $2,490,038 | Low, 3.0% under the second |
| 18 JUN 2026 | 260618-H03 | Southeast | J9S3738 - ROUTE Z - CAPE GIRARDEAU ROUTE | 1 of 6 | $3,381,857 | Low, 5.0% under the second |
| 15 MAY 2026 | 260515-D03 | Central | JCD0135-ROUTE 47-WASHINGTON COUNTY | 3 of 4 | $8,187,367 | +29% |
| 15 MAY 2026 | 260515-D05 | Central | JCD0228 - ROUTE A - WASHINGTON COUNTY | 1 of 6 | $2,283,758 | Low, 2.0% under the second |
| 15 MAY 2026 | 260515-H03 | Southeast | J9S3671, JSE0056-ROUTES K, C-PERRY, CAPE GIRARDEAU COUNTIES | 2 of 4 | $3,370,282 | 0.0% |
| 15 MAY 2026 | 260515-H08 | Southeast | JSE0114 - ROUTE MM - BUTLER COUNTY | 1 of 2 | $469,203 | Low, 4.0% under the second |
| 17 APR 2026 | 260417-D05 | Central | J5S3559 - ROUTE B - DENT COUNTY | 3 of 5 | $1,127,643 | +13% |
| 17 APR 2026 | 260417-H03 | Southeast | JSE0030-ROUTE OO- CAPE GIRARDEAU COUNTY | 2 of 4 | $2,836,919 | 0.0% |
| 17 APR 2026 | 260417-H12 | Southeast | J9S3689-ROUTE 38-WRIGHT COUNTY | 4 of 4 | $2,403,774 | +18% |
| 20 MAR 2026 | 260320-D01 | Central | J5P3558, J5S3557, JCD0032 - VARIOUS ROUTES - WASHINGTON COUNTY | 3 of 4 | $4,347,986 | +7.0% |
| 20 FEB 2026 | 260220-G01 | Southwest | JSR0049, JSR0183 - ROUTE 13 - POLK COUNTY | 2 of 2 | $5,264,015 | +11% |
| 20 FEB 2026 | 260220-G04 | Southwest | JSR0366 - ROUTE Y - WEBESTER COUNTY | 2 of 3 | $3,219,211 | +38% |
| 16 JAN 2026 | 260116-G04 | Southwest | JSR0137, JSR0142 - ROUTE BB, H - JASPER COUNTY | 1 of 5 | $2,047,012 | Low, 7.0% under the second |
| 16 JAN 2026 | 260116-H02 | Southeast | J9P3772, J9S3810 - ROUTE 25, 61 - CAPE GIRARDEAU COUNTY | 1 of 5 | $1,363,621 | Low, 1.0% under the second |
| 16 JAN 2026 | 260116-H03 | Southeast | J9S3670, J9S3771 - ROUTE T, NN - PERRY COUNTY | 5 of 6 | $3,687,017 | +17% |
| 12 DEC 2025 | 251212-H01 | Southeast | J9P3816 - ROUTE 34 - WAYNE COUNTY | 2 of 5 | $1,064,743 | +2.0% |
| 12 DEC 2025 | 251212-H03 | Southeast | J9S3727, J9S3776-ROUTES C, BB-SCOTT, CAPE GIRARDEAU COUNTIES | 1 of 5 | $1,634,668 | Low, 5.0% under the second |
| 12 DEC 2025 | 251212-H04 | Southeast | J9S3770-ROUTE C-PEMISCOT COUNTY | 3 of 3 | $686,609 | +19% |
| 14 NOV 2025 | 251114-H01 | Southeast | J9S3685, J9S3817, J9S3848, JSE0031- ROUTE 142, W - RIPLEY COUNTY | 2 of 3 | $3,821,334 | +1.0% |
| 14 NOV 2025 | 251114-H05 | Southeast | JSE0026-ROUTE N- ST GENEVIEVE COUNTY | 6 of 7 | $1,262,640 | +27% |
| 17 OCT 2025 | 251017-H01 | Southeast | J9S3774 - ROUTE Z - DUNKLIN COUNTY | 2 of 2 | $957,638 | +25% |
| 19 SEP 2025 | 250919-H01 | Southeast | J9S3677 - ROUTE AA - BUTLER COUNTY | 1 of 3 | $1,878,593 | Low, 1.0% under the second |
| 19 SEP 2025 | 250919-H02 | Southeast | JSE0083 - ROUTE 67 - WAYNE COUNTY | 1 of 3 | $2,833,660 | Low, 0.0% under the second |
| 19 SEP 2025 | 250919-H03 | Southeast | J9S3691-ROUTE AF-WRIGHT COUNTY | 7 of 8 | $2,564,192 | +33% |
| 15 AUG 2025 | 250815-H04 | Southeast | JSE0155 - ROUTE 62 - DUNKLIN COUNTY | 3 of 4 | $13,553,822 | +18% |
How this record was read
MoDOT letting tabulation PDFs (vendor ranking and bid tabulation), January 2020 to October 2026. About one bid in eight did not match its published total and is left out. Item codes from before mid 2021 are written in the current MoDOT format so one item groups across years.
- Every bid counted here matched its published total to within one dollar; MoDOT's rank decides who was low.
- The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
- A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.
A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.