MoDOT contract 260618-H01 bid tabulation
J9S3725 - ROUTE 114 - STODDARD COUNTY. Let by Missouri DOT on June 18, 2026, Stoddard, Southeast. 4 bids received; low bid $2,490,038 by Robertson Contractors, Inc..
- Owner
- Missouri DOT
- Letting
- 18 JUN 2026
- Pay items
- 59
- Data through
- 16 OCT 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Robertson Contractors, Inc. | $2,490,038 | Low |
| 2 | Joe's Bridge & Grading, Inc. | $2,562,383 | +3.0% |
| 3 | Louis-Company, LLC | $2,756,183 | +11% |
| 4 | West Plains Bridge & Grading, LLC | $2,967,000 | +19% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Robertson Contractors, Inc. | 2. Joe's Bridge & Grading, Inc. | 3. Louis-Company, LLC | 4. West Plains Bridge & Grading, LLC |
|---|---|---|---|---|---|---|---|
| 0010 | Clearing and grubbing (2013000) | ACRE | 4 | $2,500.00 | $2,000.00 | $3,192.57 | $2,200.00 |
| 0020 | Removal of improvements (2022010) | LS | 1 | $12,500 | $28,000 | $5,441.04 | $30,000 |
| 0030 | Class A excavation (2031000) | CY | 11,557 | $12.00 | $12.00 | $12.09 | $20.00 |
| 0040 | Compacting embankment (2036000) | CY | 854 | $4.50 | $6.00 | $9.97 | $40.00 |
| 0050 | Class 3 excavation (2063000) | CY | 60 | $20.00 | $24.00 | $30.23 | $42.00 |
| 0060 | Porous backfill (2064000) | CY | 171 | $120.00 | $92.00 | $87.43 | $145.00 |
| 0070 | Subgrade compaction (6-inch depth) (2101006A) | 100F | 8 | $315.00 | $800.00 | $1,196.18 | $820.00 |
| 0080 | Type 5 aggregate for base (6 in. thick) (3040506) | SY | 2,982 | $18.05 | $20.00 | $14.63 | $17.00 |
| 0090 | Gravel (A) or crushed stone (B) (3105003) | SY | 2,582 | $1.00 | $12.00 | $10.73 | $11.50 |
| 0100 | Misc.optional pavement (4019905) | SY | 2,983 | $59.50 | $59.50 | $74.90 | $59.50 |
| 0110 | Furnishing type 2 rock blanket (6113020) | CY | 1,317 | $40.00 | $47.00 | $86.88 | $70.00 |
| 0120 | Placing type 2 rock blanket (6113040) | CY | 1,317 | $20.00 | $30.00 | $16.53 | $30.00 |
| 0130 | Misc.flap gate for 24 in pipe group C (6149902) | EACH | 2 | $2,000.00 | $1,200.00 | $2,493.20 | $1,750.00 |
| 0140 | Construction signs (6161005) | SF | 602 | $7.00 | $7.00 | $8.81 | $8.00 |
| 0150 | Type 3 moveable barricade (6161030) | EACH | 24 | $145.00 | $145.00 | $182.53 | $155.00 |
| 0160 | Changeable message sign without communication interface, contractor furnished retained (6161098A) | EACH | 3 | $2,400.00 | $2,400.00 | $3,021.15 | $2,500.00 |
| 0170 | Mobilization (6181000) | LS | 1 | $130,000 | $200,000 | $109,985 | $250,308 |
| 0180 | 4 in. white class 1 pavement marking paint (18-mil, type P beads) (6206000D) | LF | 2,634 | $1.50 | $1.50 | $1.89 | $1.00 |
| 0190 | 4 in. yellow class 1 pavement marking paint (18-mil, type P beads) (6206001D) | LF | 1,138 | $1.50 | $1.50 | $1.89 | $1.00 |
| 0200 | Permanent erosion control geotextile (6240103A) | SY | 1,976 | $2.90 | $3.25 | $3.15 | $3.50 |
| 0210 | Misc.optional rumble strips (6269909) | STA | 18.50 | $225.81 | $165.00 | $207.70 | $400.00 |
| 0220 | Contractor furnished surveying and staking (6274000) | LS | 1 | $15,000 | $8,000.00 | $18,882 | $50,000 |
| 0230 | 24 in. pipe group C (7250424) | LF | 170 | $120.00 | $65.00 | $87.02 | $110.00 |
| 0240 | Beveled pipe end treatment for 24 in. or allowed substitute pipe (7322024A) | EACH | 2 | $700.00 | $750.00 | $1,483.35 | $2,135.00 |
| 0250 | Misc.seeding and mulching - cool season grasses (8059901) | LS | 1 | $5,500.00 | $12,000 | $6,294.06 | $11,000 |
| 0260 | Sediment removal (8061016) | CY | 26 | $0.01 | $10.00 | $101.99 | $10.00 |
| 0270 | Silt fence (8061019) | LF | 2,600 | $2.20 | $2.00 | $3.78 | $3.20 |
| 0280 | Type C berm (8061050) | LF | 937 | $0.01 | $5.00 | $31.47 | $18.00 |
| 0290 | MGS guardrail (6061060) | LF | 50 | $53.37 | $55.00 | $67.18 | $53.37 |
| 0300 | MGS bridge approach transition section (regular/no curb) (6061069) | EACH | 1 | $4,471.29 | $4,500.00 | $5,628.52 | $4,471.29 |
| 0310 | Type A crashworthy end terminal (MASH) (6063014) | EACH | 1 | $3,818.08 | $3,818.08 | $4,806.24 | $3,818.08 |
| 0320 | Type C crashworthy end terminal (MASH) (6063020) | EACH | 7 | $27,000 | $26,000 | $30,123 | $23,930 |
| 0330 | Class 1 excavation (2061000) | CY | 70 | $45.00 | $21.00 | $25.91 | $55.00 |
| 0340 | Removal of bridges (2160500) | LS | 1 | $30,000 | $40,000 | $24,554 | $25,000 |
| 0350 | Bridge approach slab (minor road) (5031011A) | SY | 134 | $160.00 | $120.00 | $120.37 | $115.00 |
| 0360 | Galvanized cast-in-place concrete piles (16 in) (7021316) | LF | 900 | $185.00 | $172.00 | $212.42 | $210.00 |
| 0370 | Dynamic pile testing (7025001) | EACH | 2 | $4,900.00 | $4,000.00 | $5,664.65 | $3,500.00 |
| 0380 | Pile point reinforcement (7027000) | EACH | 12 | $505.00 | $1,500.00 | $944.11 | $1,500.00 |
| 0390 | Class B concrete (substructure) (7032003) | CY | 27.80 | $1,600.00 | $1,500.00 | $1,790.89 | $1,500.00 |
| 0400 | Type H barrier (7034216) | LF | 157 | $148.00 | $148.00 | $195.80 | $195.00 |
| 0410 | Slab on concrete beam (7034222) | SY | 228 | $585.00 | $575.00 | $527.05 | $820.00 |
| 0420 | 21 in., prestressed concrete spread box beam (7056049) | LF | 243 | $525.00 | $515.00 | $716.27 | $575.00 |
| 0430 | Vertical drain at end bents (7151001) | EACH | 2 | $2,600.00 | $2,000.00 | $4,809.65 | $2,000.00 |
| 0440 | Plain neoprene bearing pad (7161000) | EACH | 8 | $280.00 | $400.00 | $196.69 | $250.00 |
| 0450 | Removal of existing bridge deck (2162500) | SF | 8,288 | $13.50 | $15.00 | $8.99 | $14.50 |
| 0460 | Misc.removal of existing bearings (2169902) | EACH | 8 | $600.00 | $4,000.00 | $3,400.65 | $2,250.00 |
| 0470 | Bridge approach slab (minor road) (5031011A) | SY | 134 | $160.00 | $120.00 | $120.37 | $115.00 |
| 0480 | Slab on steel (7034212) | SY | 892 | $525.00 | $450.00 | $415.79 | $500.00 |
| 0490 | Type H barrier (7034216) | LF | 491 | $135.00 | $125.00 | $129.72 | $140.00 |
| 0500 | Substructure repair (unformed) (7040102) | SF | 190 | $225.00 | $65.00 | $309.81 | $60.00 |
| 0510 | Protective coating - concrete bents and piers (urethane) (7110100) | LS | 1 | $51,020 | $52,000 | $64,225 | $51,020 |
| 0520 | Fabricated structural carbon steel (misc) (7121000) | LB | 800 | $22.80 | $24.00 | $31.41 | $46.50 |
| 0530 | Shear connectors (7121159) | EACH | 2,232 | $7.00 | $8.00 | $8.38 | $6.00 |
| 0540 | Slab drain (7123610) | EACH | 48 | $480.00 | $600.00 | $485.98 | $550.00 |
| 0550 | Surface preparation for recoating structural steel (7125200) | SF | 600 | $108.00 | $178.00 | $342.40 | $85.00 |
| 0560 | Field application of inorganic zinc primer (7125210) | SF | 600 | $36.00 | $5.00 | $6.29 | $40.00 |
| 0570 | Finished field coat (system L) (7125397) | SF | 800 | $27.00 | $3.00 | $3.78 | $41.17 |
| 0580 | Laminated neoprene bearing pad assembly (7162000) | EACH | 8 | $3,600.00 | $3,500.00 | $3,613.28 | $4,000.00 |
| 0590 | Strip seal expansion joint system (7172001) | LF | 62 | $680.00 | $790.00 | $740.12 | $850.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from MoDOT's tabulation for this contract. MoDOT letting tabulation PDFs (vendor ranking and bid tabulation), January 2020 to October 2026. About one bid in eight did not match its published total and is left out. Item codes from before mid 2021 are written in the current MoDOT format so one item groups across years.
Every contract let that day: MoDOT letting of June 18, 2026. Compiled by Mirage Metrics.