Joe's Bridge & Grading, Inc.: MoDOT bid record
Joe's Bridge & Grading, Inc. submitted 56 bids on Missouri DOT contracts in the data, from 17 JAN 2020 to 18 JUN 2026, and was the low bidder on 23 of them (41%). When it was not low, its total sat a median +8.0% above the low bid.
- Owner
- Missouri DOT
- Low bid volume
- $34,789,640
- Latest bid
- 18 JUN 2026
- Data through
- 16 OCT 2026
By year
| Year | Bids | Low bids | Win rate |
|---|---|---|---|
| 2020 | 7 | 2 | 29% |
| 2021 | 7 | 2 | 29% |
| 2022 | 5 | 1 | 20% |
| 2023 | 6 | 4 | 67% |
| 2024 | 11 | 6 | 55% |
| 2025 | 14 | 7 | 50% |
| 2026 | 6 | 1 | 17% |
By district
| District | Bids | Low bids | Win rate |
|---|---|---|---|
| Southeast | 49 | 20 | 41% |
| Central | 5 | 2 | 40% |
| St. Louis | 1 | 0 | 0% |
| Southwest | 1 | 1 | 100% |
Pay items where it is most often lowest
| Pay item | Code | Unit | Lines bid | Lowest on the line | Its median price | All bidders' median |
|---|---|---|---|---|---|---|
| Furnishing type 2 rock blanket | 6113020 | CY | 71 | 62 (87%) | $40.00 | $52.00 |
| Sediment removal | 8061016 | CY | 71 | 50 (70%) | $10.00 | $25.69 |
| Construction signs | 6161005 | SF | 67 | 50 (75%) | $7.50 | $7.00 |
| Silt fence | 8061019 | LF | 76 | 47 (62%) | $3.15 | $3.45 |
| 4 in. white standard waterborne pavement marking paint, type P beads | 6206000C | LF | 52 | 46 (88%) | $0.62 | $0.20 |
| Class 1 excavation | 2061000 | CY | 56 | 42 (75%) | $25.00 | $50.00 |
| Type C berm | 8061050 | LF | 53 | 40 (75%) | $6.00 | $28.00 |
| Type III moveable barricade | 6161030 | EACH | 44 | 37 (84%) | $147.50 | $156.69 |
| Advanced warning rail system | 6161008 | EACH | 48 | 36 (75%) | $45.00 | $51.40 |
| 4 in. yellow standard waterborne pavement marking paint, type P beads | 6206001C | LF | 38 | 35 (92%) | $0.55 | $0.25 |
| Permanent erosion control geotextile | 6240103A | SY | 78 | 34 (44%) | $4.00 | $4.00 |
| Rock ditch check | 8061005 | LF | 56 | 33 (59%) | $15.25 | $20.00 |
A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.
Who it meets most
| Firm | Contracts in common | That firm ranked ahead |
|---|---|---|
| Robertson Contractors, Inc. | 48 | 19 of 48 |
| Penzel Construction Company, Inc. | 14 | 7 of 14 |
| West Plains Bridge & Grading, LLC | 13 | 2 of 13 |
| Putz Construction, LLC | 8 | 0 of 8 |
| Keith Simpson Contracting, LLC | 7 | 0 of 7 |
| Mera Excavating, LLC | 6 | 1 of 6 |
| RL Persons Construction, Inc. | 6 | 2 of 6 |
| Plattin Creek Excavating, LLC dba PCX Construction, LLC | 6 | 2 of 6 |
| Louis-Company, LLC | 6 | 1 of 6 |
| Capital Paving & Construction, LLC | 5 | 0 of 5 |
Latest bids
| Let | Contract | District | Project | Rank | Its bid | Against the low bid |
|---|---|---|---|---|---|---|
| 18 JUN 2026 | 260618-H01 | Southeast | J9S3725 - ROUTE 114 - STODDARD COUNTY | 2 of 4 | $2,562,383 | +3.0% |
| 15 MAY 2026 | 260515-H08 | Southeast | JSE0114 - ROUTE MM - BUTLER COUNTY | 2 of 2 | $487,129 | +4.0% |
| 17 APR 2026 | 260417-D05 | Central | J5S3559 - ROUTE B - DENT COUNTY | 1 of 5 | $996,610 | Low, 10% under the second |
| 17 APR 2026 | 260417-H12 | Southeast | J9S3689-ROUTE 38-WRIGHT COUNTY | 2 of 4 | $2,187,864 | +8.0% |
| 16 JAN 2026 | 260116-H02 | Southeast | J9P3772, J9S3810 - ROUTE 25, 61 - CAPE GIRARDEAU COUNTY | 3 of 5 | $1,430,364 | +5.0% |
| 16 JAN 2026 | 260116-H03 | Southeast | J9S3670, J9S3771 - ROUTE T, NN - PERRY COUNTY | 2 of 6 | $3,319,374 | +5.0% |
| 12 DEC 2025 | 251212-H01 | Southeast | J9P3816 - ROUTE 34 - WAYNE COUNTY | 1 of 5 | $1,041,263 | Low, 2.0% under the second |
| 12 DEC 2025 | 251212-H03 | Southeast | J9S3727, J9S3776-ROUTES C, BB-SCOTT, CAPE GIRARDEAU COUNTIES | 2 of 5 | $1,719,857 | +5.0% |
| 12 DEC 2025 | 251212-H04 | Southeast | J9S3770-ROUTE C-PEMISCOT COUNTY | 1 of 3 | $577,972 | Low, 18% under the second |
| 14 NOV 2025 | 251114-H01 | Southeast | J9S3685, J9S3817, J9S3848, JSE0031- ROUTE 142, W - RIPLEY COUNTY | 1 of 3 | $3,768,397 | Low, 1.0% under the second |
| 14 NOV 2025 | 251114-H05 | Southeast | JSE0026-ROUTE N- ST GENEVIEVE COUNTY | 1 of 7 | $994,394 | Low, 9.0% under the second |
| 17 OCT 2025 | 251017-H01 | Southeast | J9S3774 - ROUTE Z - DUNKLIN COUNTY | 1 of 2 | $769,022 | Low, 25% under the second |
| 19 SEP 2025 | 250919-H01 | Southeast | J9S3677 - ROUTE AA - BUTLER COUNTY | 2 of 3 | $1,890,210 | +1.0% |
| 19 SEP 2025 | 250919-H02 | Southeast | JSE0083 - ROUTE 67 - WAYNE COUNTY | 2 of 3 | $2,839,390 | 0.0% |
| 15 AUG 2025 | 250815-H05 | Southeast | JSEM0106-ROUTE KK-WAYNE COUNTY | 2 of 7 | $206,586 | +39% |
| 16 MAY 2025 | 250516-H10 | Southeast | JSE0248 - ROUTE AA - SCOTT COUNTY | 5 of 5 | $5,421,430 | +22% |
| 18 APR 2025 | 250418-H01 | Southeast | J9P3678, JSE0101, JSE0104 - ROUTES 164, N, B - DUNKLIN, PEMISCOT COUNTIES | 1 of 3 | $2,679,494 | Low, 6.0% under the second |
| 18 APR 2025 | 250418-H04 | Southeast | J9S3609-ROUTE A-CARTER COUNTY | 1 of 4 | $871,060 | Low, 2.0% under the second |
| 18 APR 2025 | 250418-H05 | Southeast | J9S3679, JSE0076, JSE0078 - ROUTE DD, D - MISSISSIPPI COUNTY | 3 of 5 | $3,073,467 | +9.0% |
| 14 MAR 2025 | 250314-H02 | Southeast | J9S3680, JSE0116, JSE0127 - ROUTE 102, O, E - MISSISSIPPI, NEW MADRID COUNTIESSTODDARD, | 4 of 6 | $2,648,476 | +16% |
| 15 NOV 2024 | 241115-H06 | Southeast | JSE0115 - ROUTE 158 - BUTLER COUNTY | 1 of 4 | $841,098 | Low, 5.0% under the second |
| 20 SEP 2024 | 240920-H01 | Southeast | J9P3687 - ROUTE 19 - SHANNON COUNTY | 1 of 7 | $1,971,479 | Low, 14% under the second |
| 20 SEP 2024 | 240920-H03 | Southwest | J9S3606-ROUTE B-BUTLER COUNTY | 1 of 3 | $841,424 | Low, 5.0% under the second |
| 17 MAY 2024 | 240517-D01 | Central | J5P3420 - ROUTE 19 - DENT COUNTY | 2 of 6 | $1,549,376 | +8.0% |
| 17 MAY 2024 | 240517-H03 | Southeast | J9S3593, J9S3595, J9S3669, J9S3676 - ROUTE HH, K, O, A - PEMISCOT, DUNKLIN COUNTIES | 1 of 3 | $4,178,375 | Low, 13% under the second |
How this record was read
MoDOT letting tabulation PDFs (vendor ranking and bid tabulation), January 2020 to October 2026. About one bid in eight did not match its published total and is left out. Item codes from before mid 2021 are written in the current MoDOT format so one item groups across years.
- Every bid counted here matched its published total to within one dollar; MoDOT's rank decides who was low.
- The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
- A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.
A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.