MoDOT contract 260116-H03 bid tabulation
J9S3670, J9S3771 - ROUTE T, NN - PERRY COUNTY. Let by Missouri DOT on January 16, 2026, Perry, Southeast. 6 bids received; low bid $3,159,089 by PCX Construction, LLC.
- Owner
- Missouri DOT
- Letting
- 16 JAN 2026
- Pay items
- 106
- Data through
- 16 OCT 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | PCX Construction, LLC | $3,159,089 | Low |
| 2 | Joe's Bridge & Grading, Inc. | $3,319,374 | +5.0% |
| 3 | Pace Construction Company, LLC | $3,345,000 | +6.0% |
| 4 | Penzel Construction Company, Inc. | $3,361,004 | +6.0% |
| 5 | Robertson Contractors, Inc. | $3,687,017 | +17% |
| 6 | N.B. West Contracting Company | $4,273,000 | +35% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. PCX Construction, LLC | 2. Joe's Bridge & Grading, Inc. | 3. Pace Construction Company, LLC | 4. Penzel Construction Company, Inc. | 5. Robertson Contractors, Inc. | 6. N.B. West Contracting Company |
|---|---|---|---|---|---|---|---|---|---|
| 0010 | Clearing and grubbing (2013000) | ACRE | 1 | $12,500 | $6,000.00 | $10,000 | $7,000.00 | $8,500.00 | $40,000 |
| 0020 | Removal of improvements (2022010) | LS | 1 | $25,500 | $15,000 | $21,000 | $23,000 | $18,500 | $40,000 |
| 0030 | Class A excavation (2031000) | CY | 663 | $49.50 | $12.00 | $25.00 | $19.00 | $8.00 | $38.00 |
| 0040 | Embankment in place (2035500) | CY | 4,904 | $30.00 | $24.00 | $33.00 | $24.00 | $31.00 | $40.00 |
| 0050 | Compacting embankment (2036000) | CY | 498 | $10.00 | $5.00 | $15.00 | $7.00 | $3.00 | $34.00 |
| 0060 | Porous backfill (2064000) | CY | 71 | $83.00 | $80.00 | $45.00 | $90.00 | $140.00 | $60.00 |
| 0070 | Type 1 aggregate for base (6 in. thick) (3040163) | SY | 2,323 | $38.00 | $16.00 | $22.00 | $15.00 | $18.15 | $18.00 |
| 0080 | Gravel (A) or crushed stone (B) (3105003) | SY | 479 | $7.00 | $14.00 | $10.00 | $18.00 | $18.00 | $25.00 |
| 0090 | Misc.optional pavement (4019905) | SY | 2,144.50 | $63.00 | $60.00 | $65.00 | $63.00 | $63.02 | $88.00 |
| 0100 | Misc.6 in. steel post (6079902) | EACH | 3 | $1,800.00 | $1,000.00 | $500.00 | $1,800.00 | $1,800.00 | $1,800.00 |
| 0110 | Furnishing type 2 rock blanket (6113020) | CY | 803 | $24.00 | $42.00 | $35.00 | $56.00 | $41.00 | $25.00 |
| 0120 | Placing type 2 rock blanket (6113040) | CY | 803 | $37.00 | $30.00 | $40.00 | $34.00 | $20.00 | $36.00 |
| 0130 | Work zone crash cushion (narrow) (6122040) | EACH | 2 | $6,230.00 | $6,230.00 | $6,230.00 | $6,230.00 | $6,500.00 | $6,230.00 |
| 0140 | Construction signs (6161005) | SF | 258 | $8.00 | $10.00 | $10.00 | $10.00 | $10.00 | $8.00 |
| 0150 | Channelizer (trim-line) (6161025) | EACH | 45 | $18.00 | $24.00 | $24.00 | $24.00 | $24.00 | $18.00 |
| 0160 | Type 3 moveable barricade (6161030) | EACH | 6 | $155.00 | $185.00 | $185.00 | $185.00 | $185.00 | $155.00 |
| 0170 | Changeable message sign without communication interface, contractor furnished retained (6161098A) | EACH | 2 | $2,800.00 | $3,000.00 | $3,000.00 | $3,000.00 | $3,000.00 | $2,800.00 |
| 0180 | Work zone traffic signal system (6162000A) | EACH | 1 | $22,000 | $30,000 | $18,500 | $22,000 | $23,000 | $22,000 |
| 0190 | Temporary traffic barrier, contractor furnished retained (6173600D) | LF | 108 | $65.25 | $65.25 | $65.25 | $45.00 | $45.00 | $65.25 |
| 0200 | Mobilization (6181000) | LS | 1 | $95,200 | $125,000 | $157,440 | $216,000 | $125,000 | $336,220 |
| 0210 | Temporary removable marking tape 4 in., white (6205301B) | LF | 3,137 | $2.95 | $1.85 | $1.85 | $1.85 | $1.85 | $1.85 |
| 0220 | Temporary removable marking tape 4 in., yellow (6205303B) | LF | 2,000 | $2.95 | $1.85 | $1.85 | $1.85 | $1.85 | $1.85 |
| 0230 | Temporary removable marking tape, 24 in., white (6205309) | LF | 24 | $16.00 | $11.10 | $11.10 | $11.10 | $11.10 | $11.10 |
| 0240 | 4 in. white class 1 pavement marking paint (18-mil, type P beads) (6206000D) | LF | 2,133 | $0.70 | $0.75 | $0.75 | $0.75 | $0.75 | $0.75 |
| 0250 | 4 in. yellow class 1 pavement marking paint (18-mil, type P beads) (6206001D) | LF | 2,133 | $0.70 | $0.75 | $0.75 | $0.75 | $0.75 | $0.75 |
| 0260 | Pavement marking removal (6207001) | LF | 5,161 | $1.45 | $0.75 | $0.75 | $0.75 | $0.75 | $0.75 |
| 0270 | Permanent erosion control geotextile (6240103A) | SY | 1,388 | $5.00 | $3.00 | $3.00 | $3.84 | $3.05 | $1.25 |
| 0280 | Contractor furnished surveying and staking (6274000) | LS | 1 | $9,450.00 | $10,000 | $9,960.00 | $11,500 | $20,000 | $40,000 |
| 0290 | 18 in. pipe group B (7250318A) | LF | 74 | $104.00 | $65.00 | $75.00 | $97.00 | $305.00 | $105.00 |
| 0300 | 18 in. or allowed substitute group B flared end section (7320018A) | EACH | 2 | $902.00 | $625.00 | $800.00 | $520.00 | $800.00 | $750.00 |
| 0310 | Mulching (8025006) | ACRE | 2 | $3,200.00 | $1,500.00 | $3,000.00 | $1,500.00 | $1,900.00 | $3,000.00 |
| 0320 | Seeding - cool season grasses (8051000A) | ACRE | 1 | $3,400.00 | $3,000.00 | $4,250.00 | $3,000.00 | $2,500.00 | $4,250.00 |
| 0330 | Sediment removal (8061016) | CY | 15 | $128.00 | $10.00 | $8.15 | $30.00 | $1.00 | $25.00 |
| 0340 | Temporary seeding (8061017) | ACRE | 1 | $1,200.00 | $1,300.00 | $2,250.00 | $1,300.00 | $1,200.00 | $2,250.00 |
| 0350 | Silt fence (8061019) | LF | 1,536 | $4.00 | $3.00 | $3.40 | $3.10 | $3.62 | $4.00 |
| 0360 | Type C berm (8061050) | LF | 365 | $32.00 | $6.00 | $15.50 | $24.00 | $12.00 | $26.00 |
| 0370 | Type 2D erosion control blanket (8064138) | SY | 1,676 | $2.25 | $1.80 | $2.30 | $2.00 | $2.90 | $2.50 |
| 0380 | MGS bridge approach transition section (regular/no curb) (6061069) | EACH | 2 | $4,100.00 | $4,100.00 | $4,284.93 | $4,100.00 | $4,100.00 | $4,100.00 |
| 0390 | Type A crashworthy end terminal (MASH) (6063014) | EACH | 2 | $3,900.00 | $3,900.00 | $3,876.93 | $3,900.00 | $3,900.00 | $3,900.00 |
| 0400 | Type C crashworthy end terminal (MASH) (6063020) | EACH | 2 | $28,000 | $32,000 | $31,012 | $33,000 | $31,000 | $28,000 |
| 0410 | 2 in. PSST post - 12 GA. (9031270A) | LF | 72 | $34.00 | $34.00 | $26.53 | $34.00 | $34.00 | $34.00 |
| 0420 | Driven post anchor for 2 in. PSST - 12 GA. (9031271A) | EACH | 6 | $300.00 | $300.00 | $233.87 | $300.00 | $300.00 | $300.00 |
| 0430 | SHF-flat sheet fluorescent (9035069A) | SF | 30 | $36.00 | $36.00 | $31.16 | $36.00 | $36.00 | $36.00 |
| 0440 | Class 1 excavation (2061000) | CY | 41 | $75.00 | $21.00 | $35.00 | $43.00 | $40.00 | $89.00 |
| 0450 | Temporary shoring (2065500) | LS | 1 | $24,500 | $15,000 | $3,500.00 | $3,000.00 | $10,000 | $37,000 |
| 0460 | Removal of bridges (2160500) | LS | 1 | $75,300 | $45,000 | $60,000 | $43,000 | $50,000 | $62,000 |
| 0470 | Bridge approach slab (minor road) (5031011A) | SY | 108 | $83.93 | $130.00 | $125.00 | $450.00 | $195.00 | $350.00 |
| 0480 | Galvanized structural steel piles (14 in) (7021214) | LF | 250 | $202.00 | $170.00 | $150.00 | $151.00 | $210.00 | $200.00 |
| 0490 | Pre-bore for piling (7026000) | LF | 203 | $237.00 | $225.00 | $250.00 | $240.00 | $245.00 | $210.00 |
| 0500 | Pile point reinforcement (7027000) | EACH | 14 | $180.00 | $210.00 | $150.00 | $207.00 | $200.00 | $165.00 |
| 0510 | Class B concrete (substructure) (7032003) | CY | 32.80 | $2,030.00 | $2,000.00 | $1,400.00 | $1,440.00 | $2,150.00 | $2,050.00 |
| 0520 | Type H barrier (7034216) | LF | 487 | $98.00 | $138.00 | $105.00 | $104.00 | $140.00 | $164.00 |
| 0530 | Slab on concrete NU-girder (7034221) | SY | 659 | $419.00 | $525.00 | $475.00 | $550.00 | $580.00 | $685.00 |
| 0540 | NU 53, prestressed concrete NU-girder (7056023) | LF | 661 | $365.00 | $420.00 | $485.00 | $374.00 | $450.00 | $390.00 |
| 0550 | Reinforcing steel (bridges) (7061060) | LB | 1,290 | $1.42 | $2.25 | $2.75 | $2.50 | $3.50 | $1.50 |
| 0560 | Steel intermediate diaphragm for P/S concrete girders (7123301) | EACH | 8 | $3,820.00 | $1,350.00 | $1,000.00 | $1,330.00 | $1,800.00 | $985.00 |
| 0570 | Slab drain (7123610) | EACH | 40 | $371.00 | $750.00 | $525.00 | $705.00 | $750.00 | $925.00 |
| 0580 | Vertical drain at end bents (7151001) | EACH | 2 | $6,640.00 | $2,000.00 | $1,400.00 | $3,250.00 | $2,500.00 | $3,500.00 |
| 0590 | Plain neoprene bearing pad (7161000) | EACH | 6 | $453.00 | $525.00 | $400.00 | $245.00 | $350.00 | $540.00 |
| 0600 | Laminated neoprene bearing pad (7161002) | EACH | 6 | $459.00 | $475.00 | $325.00 | $265.00 | $320.00 | $455.00 |
| 0610 | Removal of improvements (2022010) | LS | 1 | $4,360.00 | $8,000.00 | $10,500 | $5,000.00 | $5,400.00 | $35,000 |
| 0620 | Class A excavation (2031000) | CY | 771 | $42.00 | $12.00 | $25.00 | $17.00 | $14.00 | $25.00 |
| 0630 | Compacting embankment (2036000) | CY | 113 | $10.00 | $5.00 | $20.00 | $12.50 | $70.00 | $24.00 |
| 0640 | Compacting in cut (2037075) | STA | 3.80 | $2,490.00 | $750.00 | $600.00 | $900.00 | $450.00 | $0.10 |
| 0650 | Subgrade compaction (6-inch depth) (2101006A) | 100F | 4 | $2,360.00 | $600.00 | $600.00 | $1,050.00 | $450.00 | $675.00 |
| 0660 | Shaping slopes, class III (2153000) | 100F | 4 | $1,600.00 | $1,600.00 | $1,430.77 | $1,500.00 | $1,600.00 | $1,600.00 |
| 0670 | Type 1 aggregate for base (6 in. thick) (3040163) | SY | 881 | $38.00 | $16.00 | $22.00 | $17.00 | $19.00 | $15.00 |
| 0680 | Bituminous pavement mixture PG64-22, (BP-1) (4011209) | TON | 49.90 | $157.00 | $120.00 | $120.00 | $157.00 | $156.70 | $462.00 |
| 0690 | Misc.optional pavement (4019905) | SY | 880.70 | $68.33 | $66.00 | $65.00 | $68.33 | $68.33 | $91.00 |
| 0700 | Tack coat - non-tracking (4071007) | GAL | 60 | $3.67 | $20.00 | $7.00 | $3.67 | $3.67 | $4.20 |
| 0710 | Furnishing type 2 rock blanket (6113020) | CY | 319 | $24.00 | $42.00 | $35.00 | $50.00 | $41.00 | $35.00 |
| 0720 | Placing type 2 rock blanket (6113040) | CY | 319 | $93.00 | $30.00 | $45.00 | $28.00 | $25.00 | $37.00 |
| 0730 | Changeable message sign without communication interface, contractor furnished retained (6161098A) | EACH | 4 | $2,800.00 | $3,000.00 | $3,000.00 | $3,000.00 | $3,000.00 | $2,800.00 |
| 0740 | Misc.lump sum temporary traffic control (6169901) | LS | 1 | $8,876.00 | $7,384.00 | $7,384.00 | $7,400.00 | $7,384.00 | $8,876.00 |
| 0750 | Mobilization (6181000) | LS | 1 | $101,000 | $120,000 | $170,000 | $235,000 | $125,000 | $250,000 |
| 0760 | Additional mobilization for seeding (6181020) | EACH | 2 | $600.00 | $600.00 | $600.00 | $600.00 | $600.00 | $600.00 |
| 0770 | 4 in. white class 1 pavement marking paint (18-mil, type P beads) (6206000D) | LF | 2,200 | $0.70 | $0.75 | $0.75 | $0.75 | $0.75 | $0.75 |
| 0780 | 4 in. yellow class 1 pavement marking paint (18-mil, type P beads) (6206001D) | LF | 1,822 | $0.70 | $0.75 | $0.75 | $0.75 | $0.75 | $0.75 |
| 0790 | Modified coldmilling (depth transitions) (6224010) | SY | 459 | $14.90 | $24.00 | $16.00 | $14.85 | $14.85 | $16.50 |
| 0800 | Permanent erosion control geotextile (6240103A) | SY | 958 | $3.35 | $4.00 | $3.75 | $4.00 | $3.20 | $1.50 |
| 0810 | Contractor furnished surveying and staking (6274000) | LS | 1 | $6,300.00 | $6,000.00 | $6,640.00 | $12,000 | $20,000 | $35,000 |
| 0820 | Misc.seeding & mulching - cool season grasses (8059901) | LS | 1 | $7,650.00 | $4,250.00 | $5,500.00 | $4,250.00 | $6,000.00 | $5,500.00 |
| 0830 | Alternate ditch check (8061006) | LF | 556 | $15.00 | $10.75 | $10.00 | $12.00 | $15.00 | $16.50 |
| 0840 | Sediment removal (8061016) | CY | 36 | $107.00 | $10.00 | $7.00 | $30.00 | $0.01 | $25.00 |
| 0850 | Type C berm (8061050) | LF | 237 | $19.00 | $6.00 | $15.00 | $36.00 | $15.00 | $31.50 |
| 0860 | Type 2D erosion control blanket (8064138) | SY | 1,030 | $2.25 | $1.80 | $2.30 | $2.00 | $2.95 | $2.50 |
| 0870 | MGS guardrail, 8 FT. posts, 6 FT. - 3 in. spacing (6061061) | LF | 275 | $38.00 | $38.00 | $37.76 | $38.00 | $38.00 | $38.00 |
| 0880 | MGS bridge approach transition section (regular/no curb) (6061069) | EACH | 4 | $4,100.00 | $4,100.00 | $3,978.69 | $4,100.00 | $4,100.00 | $4,100.00 |
| 0890 | Type A crashworthy end terminal (MASH) (6063014) | EACH | 4 | $3,900.00 | $3,900.00 | $3,570.69 | $3,900.00 | $3,900.00 | $3,900.00 |
| 0900 | Class 1 excavation (2061000) | CY | 130 | $47.00 | $18.00 | $65.00 | $46.00 | $35.00 | $60.00 |
| 0910 | Removal of bridges (2160500) | LS | 1 | $80,300 | $35,000 | $75,000 | $45,000 | $50,000 | $70,000 |
| 0920 | Bridge approach slab (minor road) (5031011A) | SY | 118 | $116.00 | $130.00 | $122.00 | $105.12 | $190.00 | $335.00 |
| 0930 | Drilled shafts (4 FT. 0 in. dia.) (7011106) | LF | 113.60 | $272.00 | $1,400.00 | $1,000.00 | $641.00 | $1,450.00 | $550.00 |
| 0940 | Rock sockets (3 FT 6 in. dia.) (7011205) | LF | 48 | $582.00 | $1,400.00 | $650.00 | $765.00 | $1,950.00 | $1,500.00 |
| 0950 | Video camera inspection (7011300) | EACH | 4 | $780.00 | $500.00 | $850.00 | $375.00 | $1,200.00 | $375.00 |
| 0960 | Foundation inspection holes (7011400) | LF | 88 | $220.00 | $240.00 | $250.00 | $175.00 | $280.00 | $175.00 |
| 0970 | Sonic logging testing (7011600) | EACH | 4 | $1,830.00 | $4,800.00 | $4,000.00 | $6,100.00 | $2,200.00 | $6,400.00 |
| 0980 | Galvanized structural steel piles (12 in) (7021212) | LF | 304 | $158.00 | $135.00 | $130.00 | $128.00 | $175.00 | $150.00 |
| 0990 | Pile point reinforcement (7027000) | EACH | 8 | $130.00 | $200.00 | $125.00 | $151.00 | $200.00 | $140.00 |
| 1000 | Class B concrete (substructure) (7032003) | CY | 113.40 | $1,530.00 | $1,500.00 | $1,350.00 | $1,280.00 | $1,680.00 | $1,660.00 |
| 1010 | Type H barrier (7034216) | LF | 464 | $98.00 | $140.00 | $105.00 | $98.00 | $145.00 | $170.00 |
| 1020 | Slab on concrete NU-girder (7034221) | SY | 683 | $405.00 | $520.00 | $450.00 | $515.00 | $585.00 | $635.00 |
| 1030 | NU 35, prestressed concrete NU-girder (7056021) | LF | 630 | $341.00 | $385.00 | $390.00 | $350.00 | $435.00 | $375.00 |
| 1040 | Reinforcing steel (bridges) (7061060) | LB | 28,120 | $1.70 | $2.35 | $2.25 | $1.70 | $3.05 | $1.75 |
| 1050 | Vertical drain at end bents (7151001) | EACH | 2 | $4,910.00 | $2,000.00 | $1,400.00 | $2,800.00 | $1,950.00 | $3,300.00 |
| 1060 | Laminated neoprene bearing pad (7161002) | EACH | 18 | $553.00 | $600.00 | $500.00 | $645.00 | $450.00 | $615.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from MoDOT's tabulation for this contract. MoDOT letting tabulation PDFs (vendor ranking and bid tabulation), January 2020 to October 2026. About one bid in eight did not match its published total and is left out. Item codes from before mid 2021 are written in the current MoDOT format so one item groups across years.
Every contract let that day: MoDOT letting of January 16, 2026. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.