Penzel Construction Company, Inc.: MoDOT bid record
Penzel Construction Company, Inc. submitted 22 bids on Missouri DOT contracts in the data, from 15 MAY 2020 to 18 JUN 2026, and was the low bidder on 6 of them (27%). When it was not low, its total sat a median +8.0% above the low bid.
- Owner
- Missouri DOT
- Low bid volume
- $20,985,761
- Latest bid
- 18 JUN 2026
- Data through
- 16 OCT 2026
By year
| Year | Bids | Low bids | Win rate |
|---|---|---|---|
| 2020 | 1 | 0 | 0% |
| 2021 | 1 | 0 | 0% |
| 2022 | 2 | 0 | 0% |
| 2023 | 1 | 1 | 100% |
| 2024 | 5 | 1 | 20% |
| 2025 | 7 | 2 | 29% |
| 2026 | 5 | 2 | 40% |
Pay items where it is most often lowest
| Pay item | Code | Unit | Lines bid | Lowest on the line | Its median price | All bidders' median |
|---|---|---|---|---|---|---|
| Construction signs | 6161005 | SF | 33 | 27 (82%) | $7.00 | $7.00 |
| 4 in. white standard waterborne pavement marking paint, type P beads | 6206000C | LF | 26 | 23 (88%) | $0.50 | $0.20 |
| Changeable message sign without communication interface, contractor furnished, contractor retained | 6161098A | EACH | 23 | 20 (87%) | $3,000.00 | $3,078.23 |
| 4 in. yellow standard waterborne pavement marking paint, type P beads | 6206001C | LF | 24 | 19 (79%) | $0.50 | $0.25 |
| Class B concrete (substructure) | 7032003 | CY | 32 | 15 (47%) | $1,290.00 | $1,300.00 |
| Bridge approach slab (minor road) | 5031011A | SY | 30 | 15 (50%) | $152.78 | $195.00 |
| Type A crashworthy end terminal (MASH) | 6063014 | EACH | 20 | 15 (75%) | $3,800.00 | $3,300.00 |
| Type III moveable barricade | 6161030 | EACH | 19 | 15 (79%) | $145.00 | $156.69 |
| Advanced warning rail system | 6161008 | EACH | 18 | 15 (83%) | $45.00 | $51.40 |
| MGS bridge approach transition section (regular/no curb) | 6061069 | EACH | 17 | 13 (76%) | $4,000.00 | $3,800.00 |
| Type D barrier | 7034219A | LF | 15 | 13 (87%) | $115.96 | $135.80 |
| Silt fence | 8061019 | LF | 39 | 12 (31%) | $3.50 | $3.45 |
A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.
Who it meets most
| Firm | Contracts in common | That firm ranked ahead |
|---|---|---|
| Robertson Contractors, Inc. | 20 | 13 of 20 |
| Joe's Bridge & Grading, Inc. | 14 | 7 of 14 |
| Putz Construction, LLC | 6 | 0 of 6 |
| Louis-Company, LLC | 5 | 0 of 5 |
| Plattin Creek Excavating, LLC dba PCX Construction, LLC | 4 | 0 of 4 |
| PCX Construction, LLC | 4 | 1 of 4 |
| N.B. West Contracting Company | 4 | 0 of 4 |
| Pace Construction Company, LLC | 3 | 1 of 3 |
| Keith Simpson Contracting, LLC | 2 | 0 of 2 |
| Lehman Construction, LLC | 1 | 0 of 1 |
Latest bids
| Let | Contract | District | Project | Rank | Its bid | Against the low bid |
|---|---|---|---|---|---|---|
| 18 JUN 2026 | 260618-H03 | Southeast | J9S3738 - ROUTE Z - CAPE GIRARDEAU ROUTE | 2 of 6 | $3,554,898 | +5.0% |
| 15 MAY 2026 | 260515-H03 | Southeast | J9S3671, JSE0056-ROUTES K, C-PERRY, CAPE GIRARDEAU COUNTIES | 1 of 4 | $3,366,393 | Low, 0.0% under the second |
| 17 APR 2026 | 260417-H03 | Southeast | JSE0030-ROUTE OO- CAPE GIRARDEAU COUNTY | 1 of 4 | $2,834,749 | Low, 0.0% under the second |
| 16 JAN 2026 | 260116-H02 | Southeast | J9P3772, J9S3810 - ROUTE 25, 61 - CAPE GIRARDEAU COUNTY | 2 of 5 | $1,375,308 | +1.0% |
| 16 JAN 2026 | 260116-H03 | Southeast | J9S3670, J9S3771 - ROUTE T, NN - PERRY COUNTY | 4 of 6 | $3,361,004 | +6.0% |
| 12 DEC 2025 | 251212-H03 | Southeast | J9S3727, J9S3776-ROUTES C, BB-SCOTT, CAPE GIRARDEAU COUNTIES | 3 of 5 | $1,789,355 | +9.0% |
| 19 SEP 2025 | 250919-H01 | Southeast | J9S3677 - ROUTE AA - BUTLER COUNTY | 3 of 3 | $2,157,777 | +15% |
| 19 SEP 2025 | 250919-H02 | Southeast | JSE0083 - ROUTE 67 - WAYNE COUNTY | 3 of 3 | $3,238,196 | +14% |
| 15 AUG 2025 | 250815-H04 | Southeast | JSE0155 - ROUTE 62 - DUNKLIN COUNTY | 2 of 4 | $12,487,177 | +8.0% |
| 16 MAY 2025 | 250516-H10 | Southeast | JSE0248 - ROUTE AA - SCOTT COUNTY | 1 of 5 | $4,428,373 | Low, 1.0% under the second |
| 18 APR 2025 | 250418-H05 | Southeast | J9S3679, JSE0076, JSE0078 - ROUTE DD, D - MISSISSIPPI COUNTY | 2 of 5 | $2,949,988 | +4.0% |
| 14 MAR 2025 | 250314-H02 | Southeast | J9S3680, JSE0116, JSE0127 - ROUTE 102, O, E - MISSISSIPPI, NEW MADRID COUNTIESSTODDARD, | 1 of 6 | $2,288,286 | Low, 9.0% under the second |
| 17 MAY 2024 | 240517-H03 | Southeast | J9S3593, J9S3595, J9S3669, J9S3676 - ROUTE HH, K, O, A - PEMISCOT, DUNKLIN COUNTIES | 3 of 3 | $4,992,633 | +19% |
| 19 APR 2024 | 240419-H08 | Southeast | J9S3589 - ROUTE Y - CAPE GIRARDEAU COUNTY | 1 of 5 | $981,021 | Low, 2.0% under the second |
| 15 MAR 2024 | 240315-H03 | Southeast | J9P3768, J9S3608, JSE0086, JSE0088 - ROUTE 53, U, J, H - DUNKLIN, BUTLER COUNTIES | 2 of 3 | $4,663,238 | +7.0% |
| 19 JAN 2024 | 240119-H07 | Southeast | J9S3640, J9S3642, J9S3645, J9S3646 - ROUTES Z, P , D, ZZ - SCOTT, STODDARD, CAPE GIRARDEAU, | 3 of 4 | $3,542,181 | +1.0% |
| 19 JAN 2024 | 240119-H08 | Southeast | J9S3641, J9S3723, J9S3724, J9S3769 - ROUTE D, E, 75- MISSISSIPPI, NEW MADRID COUNTIES | 3 of 3 | $3,910,781 | +1.0% |
| 19 MAY 2023 | 230519-H01 | Southeast | J9P3735 - ROUTE 61 - CAPE GIRARDEAU | 1 of 1 | $7,086,940 | Low |
| 18 FEB 2022 | 220218-H05 | Southeast | J9P3218 - ROUTE 34 - WAYNE COUNTY | 2 of 2 | $6,692,985 | +15% |
| 21 JAN 2022 | 220121-H01 | Southeast | J9I3643 - I-55 - SCOTT COUNTY | 2 of 2 | $3,757,680 | +3.0% |
| 21 MAY 2021 | 210521-H07 | Southeast | J9M0282- ROUTE 72- CAPE GIRARDEAU COUNTY | 3 of 10 | $45,420 | +8.0% |
| 15 MAY 2020 | 200515-H06 | Southeast | J9S3063 - ROUTE BUS 61 - SCOTT COUNTY | 2 of 5 | $2,516,040 | +13% |
How this record was read
MoDOT letting tabulation PDFs (vendor ranking and bid tabulation), January 2020 to October 2026. About one bid in eight did not match its published total and is left out. Item codes from before mid 2021 are written in the current MoDOT format so one item groups across years.
- Every bid counted here matched its published total to within one dollar; MoDOT's rank decides who was low.
- The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
- A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.
A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.