MoDOT contract 250516-H10 bid tabulation
JSE0248 - ROUTE AA - SCOTT COUNTY. Let by Missouri DOT on May 16, 2025, Scott, Southeast. 5 bids received; low bid $4,428,373 by Penzel Construction Company, Inc..
- Owner
- Missouri DOT
- Letting
- 16 MAY 2025
- Pay items
- 76
- Data through
- 16 OCT 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Penzel Construction Company, Inc. | $4,428,373 | Low |
| 2 | Robertson Contractors, Inc. | $4,493,389 | +1.0% |
| 3 | Louis-Company, LLC | $4,809,408 | +9.0% |
| 4 | Plattin Creek Excavating, LLC dba PCX Construction, LLC | $4,999,224 | +13% |
| 5 | Joe's Bridge & Grading, Inc. | $5,421,430 | +22% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Penzel Construction Company, Inc. | 2. Robertson Contractors, Inc. | 3. Louis-Company, LLC | 4. Plattin Creek Excavating, LLC dba PCX Construction, LLC | 5. Joe's Bridge & Grading, Inc. |
|---|---|---|---|---|---|---|---|---|
| 0010 | Signet dbe reporting (1081000) | LS | 1 | $1,000.00 | $1,000.00 | $1,000.00 | $1,000.00 | $1,000.00 |
| 0020 | Clearing and grubbing (2013000) | ACRE | 1 | $5,500.00 | $4,000.00 | $25,000 | $9,000.00 | $5,000.00 |
| 0030 | Removal of improvements (2022010) | LS | 1 | $100,000 | $22,500 | $27,053 | $56,000 | $60,000 |
| 0040 | Class A excavation (2031000) | CY | 3,864 | $9.00 | $15.80 | $11.38 | $20.00 | $18.00 |
| 0050 | Embankment in place (2035500) | CY | 21,709 | $23.00 | $21.30 | $49.30 | $25.00 | $30.00 |
| 0060 | Class 3 excavation (2063000) | CY | 294 | $20.00 | $19.00 | $29.51 | $10.00 | $24.00 |
| 0070 | Type 5 aggregate for base (6 in. thick) (3040506) | SY | 7,240 | $11.30 | $15.75 | $11.80 | $11.00 | $19.00 |
| 0080 | Gravel (A) or crushed stone (B) (3105002) | TON | 28 | $84.00 | $45.00 | $35.41 | $65.00 | $35.00 |
| 0090 | Misc.optional pavement (4019905) | SY | 7,239.70 | $55.00 | $56.29 | $66.45 | $57.00 | $56.29 |
| 0100 | Misc.temporary pavement (4019905) | SY | 35 | $94.00 | $135.00 | $81.45 | $113.00 | $150.00 |
| 0110 | Furnishing type 2 rock blanket (6113020) | CY | 1,569 | $55.00 | $50.00 | $70.83 | $56.00 | $40.00 |
| 0120 | Placing type 2 rock blanket (6113040) | CY | 1,569 | $35.00 | $15.00 | $25.39 | $100.00 | $35.00 |
| 0130 | Work zone crash cushion (narrow) (6122040) | EACH | 1 | $5,000.00 | $5,850.00 | $10,034 | $5,000.00 | $5,000.00 |
| 0140 | Truck mounted attenuator (TMA) (6123001) | LS | 1 | $21,000 | $11,500 | $21,248 | $126,000 | $4,500.00 |
| 0150 | Construction signs (6161005) | SF | 1,668 | $7.00 | $8.00 | $8.26 | $10.00 | $7.00 |
| 0160 | Advanced warning rail system (6161008) | EACH | 8 | $45.00 | $45.00 | $53.12 | $45.00 | $45.00 |
| 0170 | Relocated signs (6161010) | SF | 792 | $7.00 | $8.00 | $8.26 | $9.00 | $7.00 |
| 0180 | Channelizer (trim-line) (6161025) | EACH | 150 | $26.00 | $22.00 | $30.69 | $22.00 | $26.00 |
| 0190 | Type 3 moveable barricade (6161030) | EACH | 35 | $200.00 | $165.00 | $236.09 | $175.00 | $200.00 |
| 0200 | Flashing arrow panel (6161040) | EACH | 2 | $3,000.00 | $2,000.00 | $3,541.41 | $1,200.00 | $3,000.00 |
| 0210 | Changeable message sign without communication interface, contractor furnished retained (6161098A) | EACH | 4 | $7,000.00 | $4,500.00 | $8,263.29 | $3,800.00 | $7,000.00 |
| 0220 | Work zone traffic signal system (6162000A) | EACH | 2 | $22,000 | $12,000 | $16,999 | $12,000 | $28,000 |
| 0230 | Temporary traffic barrier, contractor furnished retained (6173600D) | LF | 700 | $46.80 | $42.00 | $41.32 | $46.80 | $46.80 |
| 0240 | Mobilization (6181000) | LS | 1 | $344,000 | $200,000 | $86,216 | $370,000 | $499,000 |
| 0250 | Temporary removable marking tape 4 in., yellow (6205303B) | LF | 2,000 | $2.00 | $3.00 | $2.36 | $5.00 | $2.00 |
| 0260 | Temporary removable marking tape, 24 in., white (6205309) | LF | 77 | $12.00 | $18.00 | $14.17 | $10.00 | $12.00 |
| 0270 | 4 in. white standard waterborne pavement marking paint, type P beads (6206000C) | LF | 4,093 | $1.00 | $0.60 | $1.18 | $1.00 | $1.00 |
| 0280 | 4 in. yellow standard waterborne pavement marking paint, type P beads (6206001C) | LF | 4,343 | $1.00 | $0.60 | $1.18 | $1.00 | $1.00 |
| 0290 | Pavement marking removal (6207001) | LF | 992 | $3.00 | $2.00 | $3.54 | $5.00 | $3.00 |
| 0300 | Permanent erosion control geotextile (6240103A) | SY | 2,352 | $3.50 | $3.55 | $3.09 | $2.50 | $4.00 |
| 0310 | Misc.optional shoulder rumble strip (6269909) | STA | 24.70 | $102.00 | $102.00 | $322.27 | $938.00 | $400.00 |
| 0320 | Contractor furnished surveying and staking (6274000) | LS | 1 | $25,000 | $20,000 | $41,316 | $32,000 | $21,000 |
| 0330 | 24 in. pipe group B (7250324A) | LF | 49 | $90.00 | $120.00 | $113.33 | $151.00 | $68.00 |
| 0340 | 48 in. pipe group B (7250348A) | LF | 80 | $230.00 | $225.00 | $224.29 | $141.00 | $118.00 |
| 0350 | 18 in. pipe group C (7250418) | LF | 11 | $90.00 | $120.00 | $182.44 | $466.00 | $65.00 |
| 0360 | 24 in. pipe group C (7250424) | LF | 74 | $100.00 | $110.00 | $103.69 | $115.00 | $80.00 |
| 0370 | 24 in. or allowed substitute group B flared end section (7320024A) | EACH | 2 | $1,100.00 | $825.00 | $1,180.47 | $1,050.00 | $675.00 |
| 0380 | 48 in. or allowed substitute group B flared end section (7320048A) | EACH | 2 | $1,500.00 | $2,950.00 | $3,541.41 | $2,290.00 | $2,500.00 |
| 0390 | 18 in. or allowed substitute group C flared end section (7320818A) | EACH | 2 | $1,000.00 | $650.00 | $1,180.47 | $952.00 | $500.00 |
| 0400 | 24 in. or allowed substitute group C flared end section (7320824A) | EACH | 2 | $1,200.00 | $800.00 | $2,360.94 | $1,050.00 | $700.00 |
| 0410 | Mulching (8025006) | ACRE | 4 | $1,850.00 | $1,850.00 | $2,065.82 | $1,850.00 | $1,850.00 |
| 0420 | Seeding - cool season grasses (8051000A) | ACRE | 4 | $2,350.00 | $2,350.00 | $2,478.99 | $2,350.00 | $2,350.00 |
| 0430 | Sediment trap excavation (8061003) | CY | 58.90 | $45.00 | $45.00 | $71.73 | $45.00 | $45.00 |
| 0440 | Sediment trap rock (8061004) | CY | 58.90 | $76.00 | $65.00 | $137.87 | $85.00 | $65.00 |
| 0450 | Rock ditch check (8061005) | LF | 48 | $26.00 | $15.50 | $37.78 | $15.50 | $15.50 |
| 0460 | Sediment removal (8061016) | CY | 126 | $30.00 | $1.00 | $25.10 | $86.10 | $12.00 |
| 0470 | Silt fence (8061019) | LF | 2,704 | $3.20 | $3.20 | $4.72 | $3.20 | $3.20 |
| 0480 | Type 2C erosion control blanket (8064137) | SY | 13,152 | $1.95 | $1.95 | $3.07 | $1.95 | $1.95 |
| 0490 | MGS guardrail (6061060) | LF | 400 | $28.00 | $28.00 | $44.87 | $28.00 | $28.00 |
| 0500 | MGS bridge approach transition section (regular/no curb) (6061069) | EACH | 4 | $4,200.00 | $4,200.00 | $5,940.11 | $4,200.00 | $4,200.00 |
| 0510 | MGS end anchor (6061080) | EACH | 2 | $1,800.00 | $1,800.00 | $2,487.09 | $1,800.00 | $1,800.00 |
| 0520 | Type A crashworthy end terminal (MASH) (6063014) | EACH | 5 | $3,900.00 | $3,900.00 | $4,754.58 | $3,900.00 | $3,900.00 |
| 0530 | Trenching type I (9015010) | LF | 650 | $8.65 | $8.65 | $10.21 | $8.65 | $8.65 |
| 0540 | Cable-conduit, 1 in., 2 conductors and 1 bare neutral, 4 AWG (9017402) | LF | 710 | $15.00 | $15.00 | $17.71 | $15.00 | $15.00 |
| 0550 | Concrete footings, embedded (9031010) | CY | 0.20 | $3,600.00 | $3,600.00 | $25,964 | $3,600.00 | $3,600.00 |
| 0560 | Pipe posts (9031220) | LB | 90 | $10.00 | $10.00 | $29.90 | $10.00 | $10.00 |
| 0570 | 2 in. PSST post - 12 GA. (9031270A) | LF | 9 | $35.00 | $35.00 | $138.33 | $35.00 | $35.00 |
| 0580 | Driven post anchor for 2 in. PSST - 12 GA. (9031271A) | EACH | 1 | $300.00 | $300.00 | $1,191.62 | $300.00 | $300.00 |
| 0590 | SH-flat sheet (9035004A) | SF | 15 | $28.00 | $28.00 | $92.97 | $28.00 | $28.00 |
| 0600 | Class 1 excavation (2061000) | CY | 315 | $35.00 | $85.00 | $25.10 | $96.50 | $30.00 |
| 0610 | Removal of bridges (2160500) | LS | 1 | $117,000 | $110,000 | $100,000 | $172,000 | $240,000 |
| 0620 | Bridge approach slab (minor road) (5031011A) | SY | 162 | $96.50 | $215.00 | $130.50 | $150.00 | $180.00 |
| 0630 | Galvanized cast-in-place concrete piles (14 in) (7021314) | LF | 700 | $160.00 | $240.00 | $158.78 | $185.00 | $180.00 |
| 0640 | Galvanized cast-in-place concrete piles (24 in) (7021324) | LF | 1,502 | $270.00 | $350.00 | $259.00 | $236.00 | $289.00 |
| 0650 | Dynamic pile testing (7025001) | EACH | 5 | $6,000.00 | $8,750.00 | $5,902.35 | $3,050.00 | $6,400.00 |
| 0660 | Class B concrete (substructure) (7032003) | CY | 218.90 | $1,260.00 | $1,285.00 | $1,000.79 | $1,820.00 | $1,650.00 |
| 0670 | Slab on steel (7034212) | SY | 1,292 | $465.00 | $455.00 | $403.90 | $638.00 | $595.00 |
| 0680 | Type D barrier (7034219A) | LF | 656 | $110.00 | $135.00 | $128.60 | $118.00 | $138.00 |
| 0690 | Reinforcing steel (bridges) (7061060) | LB | 29,440 | $1.73 | $2.25 | $0.77 | $1.35 | $2.00 |
| 0700 | Reinforcing steel (epoxy coated) (7101000) | LB | 14,900 | $1.94 | $2.55 | $0.77 | $1.45 | $2.45 |
| 0710 | Temporary coating - concrete bents and piers (weathering steel) (7110500) | LS | 1 | $12,500 | $10,000 | $14,543 | $12,300 | $12,500 |
| 0720 | Fabricated structural low alloy steel (plate girder) A709, grade 50W (7121122) | LB | 245,340 | $2.60 | $3.00 | $3.10 | $2.20 | $3.40 |
| 0730 | Slab drain (7123610) | EACH | 16 | $800.00 | $570.00 | $469.83 | $403.00 | $650.00 |
| 0740 | Vertical drain at end bents (7151001) | EACH | 2 | $3,800.00 | $2,700.00 | $2,997.89 | $9,030.00 | $2,400.00 |
| 0750 | Plain neoprene bearing pad (7161000) | EACH | 8 | $260.00 | $270.00 | $64.93 | $351.00 | $275.00 |
| 0760 | Laminated neoprene bearing pad assembly (7162000) | EACH | 12 | $2,250.00 | $2,850.00 | $2,929.25 | $1,930.00 | $2,800.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from MoDOT's tabulation for this contract. MoDOT letting tabulation PDFs (vendor ranking and bid tabulation), January 2020 to October 2026. About one bid in eight did not match its published total and is left out. Item codes from before mid 2021 are written in the current MoDOT format so one item groups across years.
Every contract let that day: MoDOT letting of May 16, 2025. Compiled by Mirage Metrics.