Plattin Creek Excavating, LLC dba PCX Construction, LLC: MoDOT bid record
Plattin Creek Excavating, LLC dba PCX Construction, LLC submitted 30 bids on Missouri DOT contracts in the data, from 18 AUG 2023 to 12 DEC 2025, and was the low bidder on 3 of them (10%). When it was not low, its total sat a median +20% above the low bid.
- Owner
- Missouri DOT
- Low bid volume
- $5,531,040
- Latest bid
- 12 DEC 2025
- Data through
- 16 OCT 2026
By year
| Year | Bids | Low bids | Win rate |
|---|---|---|---|
| 2023 | 4 | 0 | 0% |
| 2024 | 7 | 1 | 14% |
| 2025 | 19 | 2 | 11% |
By district
| District | Bids | Low bids | Win rate |
|---|---|---|---|
| St. Louis | 18 | 2 | 11% |
| Southeast | 8 | 1 | 13% |
| Central | 4 | 0 | 0% |
Pay items where it is most often lowest
| Pay item | Code | Unit | Lines bid | Lowest on the line | Its median price | All bidders' median |
|---|---|---|---|---|---|---|
| Type A crashworthy end terminal (MASH) | 6063014 | EACH | 15 | 15 (100%) | $3,800.00 | $3,300.00 |
| MGS bridge approach transition section (regular/no curb) | 6061069 | EACH | 14 | 13 (93%) | $4,200.00 | $3,800.00 |
| 4 in. white standard waterborne pavement marking paint, type P beads | 6206000C | LF | 15 | 12 (80%) | $0.55 | $0.20 |
| MGS guardrail | 6061060 | LF | 12 | 11 (92%) | $30.00 | $30.00 |
| SHF-flat sheet fluorescent | 9035069A | SF | 11 | 11 (100%) | $32.00 | $32.00 |
| Class 3 excavation | 2063000 | CY | 15 | 9 (60%) | $10.00 | $30.00 |
| Pile point reinforcement | 7027000 | EACH | 11 | 9 (82%) | $125.00 | $155.00 |
| 4 in. yellow standard waterborne pavement marking paint, type P beads | 6206001C | LF | 14 | 8 (57%) | $1.00 | $0.25 |
| Advanced warning rail system | 6161008 | EACH | 9 | 8 (89%) | $45.00 | $51.40 |
| Mulching | 8025006 | ACRE | 20 | 7 (35%) | $3,400.00 | $2,500.00 |
| Compacting embankment | 2036000 | CY | 12 | 7 (58%) | $6.00 | $7.65 |
| Pavement marking removal | 6207001 | LF | 10 | 7 (70%) | $1.43 | $1.04 |
A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.
Who it meets most
| Firm | Contracts in common | That firm ranked ahead |
|---|---|---|
| Gershenson Construction Co., Inc. | 10 | 5 of 10 |
| Pace Construction Company, LLC | 9 | 3 of 9 |
| R. V. Wagner, Inc. | 7 | 5 of 7 |
| Robertson Contractors, Inc. | 7 | 5 of 7 |
| Widel, Inc. | 6 | 5 of 6 |
| Concrete Strategies, LLC | 6 | 4 of 6 |
| Kozeny-Wagner, Inc. | 6 | 3 of 6 |
| Joe's Bridge & Grading, Inc. | 6 | 4 of 6 |
| K.J.U., Inc. dba K.J. Unnerstall Construction Co. | 5 | 5 of 5 |
| Millstone Weber, LLC | 4 | 3 of 4 |
Latest bids
| Let | Contract | District | Project | Rank | Its bid | Against the low bid |
|---|---|---|---|---|---|---|
| 12 DEC 2025 | 251212-F01 | St. Louis | J6I3618-ROUTE I-270-ST LOUIS COUNTY | 4 of 5 | $976,932 | +50% |
| 12 DEC 2025 | 251212-H01 | Southeast | J9P3816 - ROUTE 34 - WAYNE COUNTY | 4 of 5 | $1,234,889 | +19% |
| 12 DEC 2025 | 251212-H03 | Southeast | J9S3727, J9S3776-ROUTES C, BB-SCOTT, CAPE GIRARDEAU COUNTIES | 4 of 5 | $1,967,229 | +20% |
| 14 NOV 2025 | 251114-F06 | St. Louis | JSLM0079 - ROUTE 100 - FRANKLIN COUNTY | 9 of 10 | $195,999 | +71% |
| 14 NOV 2025 | 251114-F07 | St. Louis | JSLM0087 - ROUTE D - FRANKLIN COUNTY | 1 of 4 | $414,687 | Low, 3.0% under the second |
| 14 NOV 2025 | 251114-H05 | Southeast | JSE0026-ROUTE N- ST GENEVIEVE COUNTY | 3 of 7 | $1,143,808 | +15% |
| 16 MAY 2025 | 250516-F01 | St. Louis | J6P3274, J6P3274B - ROUTE 100 - ST LOUIS COUNTY | 4 of 4 | $24,236,153 | +27% |
| 16 MAY 2025 | 250516-F15 | St. Louis | JSLM0066 - ROUTE I-64 EB - ST LOUIS CITY | 2 of 3 | $469,710 | +9.0% |
| 16 MAY 2025 | 250516-H10 | Southeast | JSE0248 - ROUTE AA - SCOTT COUNTY | 4 of 5 | $4,999,224 | +13% |
| 18 APR 2025 | 250418-F04 | St. Louis | JSLM0051 - ROUTE CLAYTON RD - ST. LOUIS COUNTY | 2 of 2 | $273,420 | +10% |
| 18 APR 2025 | 250418-H05 | Southeast | J9S3679, JSE0076, JSE0078 - ROUTE DD, D - MISSISSIPPI COUNTY | 5 of 5 | $3,456,457 | +22% |
| 14 MAR 2025 | 250314-D04 | Central | J5S3540 - ROUTE 47 - WASHINGTON COUNTY | 3 of 3 | $902,971 | +53% |
| 14 MAR 2025 | 250314-F03 | St. Louis | J6S3626 - ROUTE D - ST. LOUIS COUNTY | 2 of 5 | $11,845,782 | +5.0% |
| 14 MAR 2025 | 250314-H01 | Southeast | J9P3448 - ROUTE 8 - ST FRANCIS COUNTY | 1 of 2 | $3,440,171 | Low, 3.0% under the second |
| 14 MAR 2025 | 250314-H02 | Southeast | J9S3680, JSE0116, JSE0127 - ROUTE 102, O, E - MISSISSIPPI, NEW MADRID COUNTIESSTODDARD, | 2 of 6 | $2,499,382 | +9.0% |
| 21 FEB 2025 | 250221-D01 | Central | J5S3506 - ROUTE C - WASHINGTON COUNTY | 3 of 3 | $2,272,538 | +9.0% |
| 21 FEB 2025 | 250221-D02 | Central | J5S3533 - ROUTES OR I-44 - CRAWFORD COUNTY | 5 of 5 | $1,129,359 | +95% |
| 17 JAN 2025 | 250117-F07 | St. Louis | J6I3624B - ROUTE I-170 - ST LOUIS COUNTY | 3 of 4 | $3,844,982 | +33% |
| 17 JAN 2025 | 250117-F08 | St. Louis | JSLM0045- ROUTE I-270 - ST LOUIS COUNTY | 3 of 8 | $585,961 | +36% |
| 15 NOV 2024 | 241115-F03 | St. Louis | J6S3283-ROUTE 21-ST LOUIS COUNTY | 5 of 6 | $24,988,546 | +14% |
| 18 OCT 2024 | 241018-F03 | St. Louis | J6S3582 - ROUTE 366 - ST. LOUIS COUNTY | 3 of 4 | $24,400,818 | +5.0% |
| 18 OCT 2024 | 241018-H04 | Southeast | J9S3706 - ROUTE 25 - CAPE GIRARDEAU COUNTY | 7 of 7 | $647,131 | +38% |
| 18 OCT 2024 | 241018-S01 | St. Louis | JST0071 - ROUTE I-64, I-55, I-70 - ST. LOUIS CITY, ST. LOUIS, ST. CHARLES AND PEMISCOT COUNTIES | 1 of 1 | $1,676,182 | Low |
| 16 AUG 2024 | 240816-D03 | Central | JCDM0060-ROUTE 17-MILLER COUNTY | 7 of 7 | $312,070 | +196% |
| 17 MAY 2024 | 240517-F01 | St. Louis | J6I2339 - ROUTE I-170 - ST LOUIS COUNTY | 4 of 6 | $207,931 | +22% |
How this record was read
MoDOT letting tabulation PDFs (vendor ranking and bid tabulation), January 2020 to October 2026. About one bid in eight did not match its published total and is left out. Item codes from before mid 2021 are written in the current MoDOT format so one item groups across years.
- Every bid counted here matched its published total to within one dollar; MoDOT's rank decides who was low.
- The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
- A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.
A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.