MoDOT contract 251212-F01 bid tabulation
J6I3618-ROUTE I-270-ST LOUIS COUNTY. Let by Missouri DOT on December 12, 2025, St Louis, St. Louis. 5 bids received; low bid $652,999 by Concrete Strategies, LLC.
- Owner
- Missouri DOT
- Letting
- 12 DEC 2025
- Pay items
- 28
- Data through
- 16 OCT 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Concrete Strategies, LLC | $652,999 | Low |
| 2 | Above And Below Contracting, LLC | $759,177 | +16% |
| 3 | Millstone Weber, LLC | $848,525 | +30% |
| 4 | Plattin Creek Excavating, LLC dba PCX Construction, LLC | $976,932 | +50% |
| 5 | Kozeny-Wagner, Inc. | $1,025,000 | +57% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Concrete Strategies, LLC | 2. Above And Below Contracting, LLC | 3. Millstone Weber, LLC | 4. Plattin Creek Excavating, LLC dba PCX Construction, LLC | 5. Kozeny-Wagner, Inc. |
|---|---|---|---|---|---|---|---|---|
| 0010 | Misc.tree and brush clearing (2019901) | LS | 1 | $25,500 | $21,823 | $83,642 | $18,400 | $60,000 |
| 0020 | Removal of improvements (2022010) | LS | 1 | $8,900.00 | $15,727 | $8,900.00 | $22,000 | $26,890 |
| 0030 | Misc.stream sediment removal (2069901) | LS | 1 | $3,800.00 | $12,113 | $7,400.00 | $30,000 | $16,500 |
| 0040 | Linear grading class 1 (2071000) | STA | 1 | $2,750.00 | $2,250.00 | $8,300.00 | $2,250.00 | $3,500.00 |
| 0050 | Gravel (A) (3101003) | SY | 153 | $11.00 | $38.48 | $24.00 | $20.00 | $70.00 |
| 0060 | Chain-link fence (48 in.) (6071011A) | LF | 55 | $86.00 | $120.00 | $120.00 | $80.00 | $80.00 |
| 0070 | Misc.lump sum temporary traffic control (6169901) | LS | 1 | $1,650.00 | $2,250.00 | $2,100.00 | $2,620.00 | $2,500.00 |
| 0080 | Mobilization (6181000) | LS | 1 | $137,821 | $57,556 | $84,500 | $95,000 | $100,000 |
| 0090 | Contractor furnished surveying and staking (6274000) | LS | 1 | $2,600.00 | $3,636.00 | $11,000 | $2,000.00 | $750.00 |
| 0100 | Misc.MSD submittals (6279901) | LS | 1 | $2,100.00 | $7,500.00 | $650.00 | $5,000.00 | $1,000.00 |
| 0110 | Mulching (8025006) | ACRE | 1.30 | $3,790.00 | $1,500.00 | $5,000.00 | $3,500.00 | $3,500.00 |
| 0120 | Seeding - cool season grasses (8051000A) | ACRE | 1.30 | $5,400.00 | $1,500.00 | $3,500.00 | $5,000.00 | $3,250.00 |
| 0130 | Sediment removal (8061016) | CY | 22 | $81.00 | $75.00 | $1.00 | $120.00 | $50.00 |
| 0140 | Silt fence (8061019) | LF | 216 | $4.00 | $7.50 | $6.00 | $6.00 | $4.90 |
| 0150 | Misc.culvert cleanout (2069901) | LS | 1 | $16,250 | $62,550 | $50,200 | $150,000 | $45,000 |
| 0160 | Misc.dewatering (2069901) | LS | 1 | $52,500 | $11,250 | $64,000 | $70,000 | $46,500 |
| 0170 | Total surface hydro demolition (2161001) | SY | 296 | $155.00 | $98.31 | $190.00 | $150.00 | $375.00 |
| 0180 | Supplementary wearing surface material (5050004) | CY | 15 | $1,000.00 | $1,000.00 | $1,000.00 | $1,000.00 | $1,000.00 |
| 0190 | Latex modified concrete wearing surface (5052000) | SY | 296 | $244.00 | $262.50 | $220.00 | $173.00 | $419.00 |
| 0200 | Class B-1 concrete (culverts-bridge) (7034040) | CY | 10.30 | $2,950.00 | $2,250.00 | $7,500.00 | $5,340.00 | $6,600.00 |
| 0210 | Substructure repair (unformed) (7040102) | SF | 576 | $123.00 | $225.00 | $125.00 | $145.00 | $231.00 |
| 0220 | Superstructure repair (unformed) (7040103) | SF | 455 | $131.00 | $225.00 | $145.00 | $343.00 | $231.00 |
| 0230 | Epoxy pressure injecting (7040110) | LF | 40 | $43.00 | $127.50 | $120.00 | $156.00 | $100.00 |
| 0240 | Misc.clean out and seal transverse joints (7049903) | LF | 806 | $9.50 | $60.00 | $68.00 | $37.00 | $22.00 |
| 0250 | Reinforcing steel (culverts-bridge) (7061020) | LB | 1,460 | $10.00 | $3.00 | $19.75 | $2.00 | $4.25 |
| 0260 | Substructure repair (unformed) (7040102) | SF | 262 | $123.00 | $225.00 | $125.00 | $128.00 | $235.00 |
| 0270 | Superstructure repair (unformed) (7040103) | SF | 207 | $131.00 | $225.00 | $145.00 | $369.00 | $235.00 |
| 0280 | Epoxy pressure injecting (7040110) | LF | 20 | $43.00 | $127.50 | $120.00 | $156.00 | $100.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from MoDOT's tabulation for this contract. MoDOT letting tabulation PDFs (vendor ranking and bid tabulation), January 2020 to October 2026. About one bid in eight did not match its published total and is left out. Item codes from before mid 2021 are written in the current MoDOT format so one item groups across years.
Every contract let that day: MoDOT letting of December 12, 2025. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.