Concrete Strategies, LLC: MoDOT bid record
Concrete Strategies, LLC submitted 74 bids on Missouri DOT contracts in the data, from 17 JAN 2020 to 18 SEP 2026, and was the low bidder on 24 of them (32%). When it was not low, its total sat a median +28% above the low bid.
- Owner
- Missouri DOT
- Low bid volume
- $62,610,675
- Latest bid
- 18 SEP 2026
- Data through
- 16 OCT 2026
By year
| Year | Bids | Low bids | Win rate |
|---|---|---|---|
| 2020 | 11 | 0 | 0% |
| 2021 | 11 | 4 | 36% |
| 2022 | 7 | 2 | 29% |
| 2023 | 2 | 2 | 100% |
| 2024 | 17 | 4 | 24% |
| 2025 | 19 | 10 | 53% |
| 2026 | 7 | 2 | 29% |
By district
| District | Bids | Low bids | Win rate |
|---|---|---|---|
| St. Louis | 30 | 10 | 33% |
| Central | 21 | 6 | 29% |
| Southwest | 9 | 0 | 0% |
| Kansas City | 7 | 5 | 71% |
| Southeast | 3 | 2 | 67% |
| Northwest | 2 | 0 | 0% |
| Northeast | 2 | 1 | 50% |
Pay items where it is most often lowest
| Pay item | Code | Unit | Lines bid | Lowest on the line | Its median price | All bidders' median |
|---|---|---|---|---|---|---|
| Supplementary wearing surface material | 5050004 | CY | 51 | 50 (98%) | $1,000.00 | $700.00 |
| Total surface hydro demolition | 2161001 | SY | 51 | 39 (76%) | $49.00 | $59.54 |
| Latex modified concrete wearing surface | 5052000 | SY | 51 | 27 (53%) | $160.00 | $148.00 |
| Removal of existing deck repair | 2161503 | SF | 49 | 23 (47%) | $36.50 | $36.00 |
| Reinforcing steel (epoxy coated) | 7101000 | LB | 32 | 19 (59%) | $3.43 | $3.00 |
| Open cell foam joint seal | 7172054 | LF | 30 | 19 (63%) | $62.50 | $85.50 |
| Substructure repair (unformed) | 7040102 | SF | 42 | 17 (40%) | $160.00 | $198.91 |
| Removal of existing expansion joint & adjacent concrete | 2164500 | LF | 31 | 12 (39%) | $425.00 | $390.00 |
| Strip seal expansion joint system | 7172001 | LF | 21 | 12 (57%) | $595.00 | $530.00 |
| Superstructure repair (unformed) | 7040103 | SF | 17 | 12 (71%) | $214.00 | $253.00 |
| Half-sole repair | 7040104 | SF | 50 | 10 (20%) | $127.58 | $108.00 |
| Construction signs | 6161005 | SF | 46 | 10 (22%) | $8.50 | $7.00 |
A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.
Who it meets most
| Firm | Contracts in common | That firm ranked ahead |
|---|---|---|
| Capital Paving & Construction, LLC | 25 | 16 of 25 |
| Kozeny-Wagner, Inc. | 17 | 8 of 17 |
| Emery Sapp & Sons, Inc. | 11 | 9 of 11 |
| KCI Construction Company | 11 | 7 of 11 |
| Louis-Company, LLC | 11 | 6 of 11 |
| Lehman Construction, LLC | 10 | 8 of 10 |
| Comanche Construction, Inc. | 10 | 8 of 10 |
| R. V. Wagner, Inc. | 8 | 6 of 8 |
| Phillips Hardy, Inc. | 7 | 3 of 7 |
| Pace Construction Company, LLC | 6 | 2 of 6 |
Latest bids
| Let | Contract | District | Project | Rank | Its bid | Against the low bid |
|---|---|---|---|---|---|---|
| 18 SEP 2026 | 260918-F03 | St. Louis | JSL0305 - I-70 - ST. CHARLES COUNTY | 1 of 2 | $2,347,998 | Low, 32% under the second |
| 18 JUN 2026 | 260618-C02 | Kansas City | JKU0140 - ROUTE 150 - JACKSON COUNTY | 2 of 4 | $5,156,536 | +23% |
| 17 APR 2026 | 260417-C01 | Kansas City | J4P3093-VARIOUS ROUTES-JACKSON, CLAY, PLATTE COUNTIES | 3 of 4 | $3,660,547 | +13% |
| 20 FEB 2026 | 260220-G03 | Southwest | JSR0274-ROUTE I-49-VERNON COUNTY | 3 of 4 | $4,793,706 | +25% |
| 16 JAN 2026 | 260116-D02 | Central | J5S3556 - ROUTE T - WASHINGTON COUNTY | 5 of 5 | $294,654 | +98% |
| 16 JAN 2026 | 260116-D05 | Central | JCD0089 - ROUTE BB - PHELPS COUNTY | 1 of 3 | $1,676,851 | Low, 2.0% under the second |
| 16 JAN 2026 | 260116-F07 | St. Louis | JSLM0071 - ROUTE 141, 21 - ST. LOUIS, JEFFERSON COUNTIES | 6 of 9 | $348,560 | +68% |
| 12 DEC 2025 | 251212-F01 | St. Louis | J6I3618-ROUTE I-270-ST LOUIS COUNTY | 1 of 5 | $652,999 | Low, 16% under the second |
| 14 NOV 2025 | 251114-F07 | St. Louis | JSLM0087 - ROUTE D - FRANKLIN COUNTY | 2 of 4 | $428,816 | +3.0% |
| 14 NOV 2025 | 251114-F08 | St. Louis | J6I3290 - ROUTE I-55 - ST LOUIS, JEFFERSON COUNTIES | 2 of 4 | $17,736,469 | +7.0% |
| 19 SEP 2025 | 250919-F02 | St. Louis | J6P3554, JSL0248 - ROUTE 370 - ST CHARLES COUNTY | 3 of 6 | $42,239,439 | +3.0% |
| 16 MAY 2025 | 250516-C15 | Kansas City | JKU0310 - VARIOUS ROUTES - VARIOUS COUNTIES | 1 of 2 | $3,400,000 | Low |
| 16 MAY 2025 | 250516-F02 | St. Louis | J6P3447 - VARIOUS ROUTES - VARIOUS COUNTIES | 1 of 1 | $2,552,000 | Low |
| 16 MAY 2025 | 250516-F15 | St. Louis | JSLM0066 - ROUTE I-64 EB - ST LOUIS CITY | 1 of 3 | $429,931 | Low, 9.0% under the second |
| 16 MAY 2025 | 250516-G08 | Southwest | JSRM0088 - David Dr, - NEWTON COUNTY | 3 of 3 | $772,956 | +122% |
| 14 MAR 2025 | 250314-C05 | Kansas City | JKR0412 - VARIOUS ROUTES - JOHNSON, LAFAYETTE, PETTIS, SALINE COUNTIES | 1 of 1 | $1,750,000 | Low |
| 14 MAR 2025 | 250314-C07 | Kansas City | JKU0040 - ROUTE 24 - JACKSON COUNTY | 1 of 1 | $1,492,497 | Low |
| 14 MAR 2025 | 250314-D03 | Central | J5S3480B, J5S3541, J5S3547, J5S3548, J5S3549, J5S3563 - ROUTE I-44 - PULASKI, PHELPS COUNTIES | 1 of 2 | $3,948,367 | Low, 4.0% under the second |
| 14 MAR 2025 | 250314-F01 | St. Louis | J6I3573B - ROUTE AC - ST LOUIS COUNTY | 2 of 2 | $1,951,234 | +2.0% |
| 14 MAR 2025 | 250314-H13 | Southeast | JSE0198 - ROUTE 67 - WAYNE COUNTY | 1 of 3 | $376,051 | Low, 9.0% under the second |
| 21 FEB 2025 | 250221-D02 | Central | J5S3533 - ROUTES OR I-44 - CRAWFORD COUNTY | 3 of 5 | $883,775 | +53% |
| 17 JAN 2025 | 250117-B03 | Northeast | JNE0123 - ROUTE RA - MONTGOMERY COUNTY | 1 of 3 | $291,672 | Low, 10% under the second |
| 17 JAN 2025 | 250117-D01 | Central | J5I3561 - ROUTE I-44 - PHELPS COUNTY | 2 of 3 | $977,941 | +15% |
| 17 JAN 2025 | 250117-F06 | St. Louis | JSL0210 - ROUTES I-44, C, VV, Y, I-70, I-270, 47 - FRANKLIN, ST. CHARLES, ST. LOUIS, ST. LOUIS CITY | 3 of 4 | $1,767,356 | +170% |
| 17 JAN 2025 | 250117-F07 | St. Louis | J6I3624B - ROUTE I-170 - ST LOUIS COUNTY | 4 of 4 | $3,979,554 | +38% |
How this record was read
MoDOT letting tabulation PDFs (vendor ranking and bid tabulation), January 2020 to October 2026. About one bid in eight did not match its published total and is left out. Item codes from before mid 2021 are written in the current MoDOT format so one item groups across years.
- Every bid counted here matched its published total to within one dollar; MoDOT's rank decides who was low.
- The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
- A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.
A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.