R. V. Wagner, Inc.: MoDOT bid record

R. V. Wagner, Inc. submitted 54 bids on Missouri DOT contracts in the data, from 17 JAN 2020 to 15 MAY 2026, and was the low bidder on 18 of them (33%). When it was not low, its total sat a median +14% above the low bid.

Owner
Missouri DOT
Low bid volume
$45,160,554
Latest bid
15 MAY 2026
Data through
16 OCT 2026
54Bids
18Low bids
33Win rate, percent
+14%Median gap to the low bid when not low, 36 bids

By year

YearBidsLow bidsWin rate
202012542%
202110660%
20226117%
20235120%
202410330%
2025500%
20266233%
R. V. Wagner, Inc., MoDOT: bids and low bids by year of letting

By district

DistrictBidsLow bidsWin rate
St. Louis481735%
Southeast300%
Central2150%
Southwest100%
R. V. Wagner, Inc., MoDOT: bids and low bids by district

Pay items where it is most often lowest

Pay itemCodeUnitLines bidLowest on the lineIts median priceAll bidders' median
Misc. epoxy urethane polymer wearing surface W ith healer/sealer prime6239905SY1514 (93%)$37.65$44.25
Sediment removal8061016CY2211 (50%)$43.50$25.69
Epoxy polymer wearing surface6233000SY118 (73%)$34.00$44.36
Full depth pavement repair saw cut (for perimeter and internal saw cuts)6131014LF96 (67%)$7.00$6.47
Misc. remove and replace barrier curb2169903LF66 (100%)$744.50$987.50
Type 5 aggregate for base (4 in. thick)3040504SY125 (42%)$14.22$14.30
Additional mobilization for seeding6181020EACH55 (100%)$600.00$600.00
Truck or trailer mounted attenuator (TMA)6123000AEACH154 (27%)$1,700.00$1,000.00
Class 3 excavation2063000CY154 (27%)$107.00$30.00
Silicone expansion joint sealant7173002LF154 (27%)$33.80$42.00
Furnishing and placing concrete material for full depth pavement repair6131010SY74 (57%)$224.00$300.00
Silt fence8061019LF223 (14%)$6.88$3.45
R. V. Wagner, Inc., MoDOT: pay items where its unit price was the lowest on the line

A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.

Who it meets most

Latest bids

LetContractDistrictProjectRankIts bidAgainst the low bid
15 MAY 2026260515-F01St. LouisADA improvements, 2 MSE walls, and bridge rehabilitation1 of 3$7,897,561Low, 15% under the second
17 APR 2026260417-F04St. LouisJSL0099 - VARIOUS ROUTES - VARIOUS COUNTIES3 of 3$2+37%
17 APR 2026260417-F05St. LouisJSLM0105 - ROUTE 30 - ST LOUIS, JEFFERSON COUNTIES7 of 7$1,956,244+104%
17 APR 2026260417-F06St. LouisJSL0285 - ROUTE I-44 - ST. LOUIS CITY COUNTY1 of 3$342,249Low, 13% under the second
16 JAN 2026260116-F03St. LouisJSL0208 - VARIOUS ROUTES - VARIOUS COUNTIES3 of 7$1,473,685+7.0%
16 JAN 2026260116-F07St. LouisJSLM0071 - ROUTE 141, 21 - ST. LOUIS, JEFFERSON COUNTIES3 of 9$225,363+9.0%
14 NOV 2025251114-F06St. LouisJSLM0079 - ROUTE 100 - FRANKLIN COUNTY4 of 10$138,296+21%
17 OCT 2025251017-F02SoutheastJ6P3510C - VARIOUS ROUTES - VARIOUS COUNTIES4 of 5$8,327,509+12%
15 AUG 2025250815-F03St. LouisRank vendor id vendor name total bid percent of low bid3 of 7$1,862,561+6.0%
18 APR 2025250418-F03St. LouisJSL0074 - ROUTE I-255 - ST LOUIS COUNTY2 of 2$3,420,512+39%
17 JAN 2025250117-F08St. LouisJSLM0045- ROUTE I-270 - ST LOUIS COUNTY2 of 8$468,109+8.0%
15 NOV 2024241115-F03St. LouisJ6S3283-ROUTE 21-ST LOUIS COUNTY4 of 6$23,728,311+9.0%
15 NOV 2024241115-F07St. LouisJSL0143 - VARIOUS ROUTES - VARIOUS COUNTIES2 of 6$1,837,271+1.0%
18 OCT 2024241018-H04SoutheastJ9S3706 - ROUTE 25 - CAPE GIRARDEAU COUNTY3 of 7$537,994+15%
16 AUG 2024240816-F03St. LouisJSLM0047-ROUTES I-64, I-44, 364-ST LOUIS, ST LOUIS CITY, ST CHARLES COUNTIES2 of 3$1,155,327+2.0%
17 MAY 2024240517-F01St. LouisJ6I2339 - ROUTE I-170 - ST LOUIS COUNTY1 of 6$170,472Low, 1.0% under the second
17 MAY 2024240517-F04St. LouisJ6P3454-VARIOUS ROUTES-FRANKLIN, ST LOUIS, ST CHARLES, JEFFERSON, ST LOUIS CITY2 of 2$6,208,000+2.0%
17 MAY 2024240517-F07St. LouisJ6S3278 - ROUTE H - ST. LOUIS CITY1 of 4$6,760,534Low, 2.0% under the second
17 MAY 2024240517-F11St. LouisJSL0093 - ROUTE 364 - ST LOUIS COUNTY5 of 6$592,831+26%
19 APR 2024240419-F05St. LouisJ6S3599 - ROUTE N - ST. LOUIS COUNTY5 of 5$7,629,734+24%
19 JAN 2024240119-F03St. LouisJSL0005 - VARIOUS ROUTES - VARIOUS COUNTIES1 of 5$1,449,233Low, 4.0% under the second
17 NOV 2023231117-F02St. LouisJ6S3351-ROUTE 109, CC-ST. LOUIS COUNTY4 of 5$5,310,078+14%
18 AUG 2023230818-F03St. LouisJSL0004 - ROUTE D - ST. CHARLES COUNTY5 of 9$1,057,274+25%
19 MAY 2023230519-F03St. LouisJ6I3540, J6I3550 -VARIOUS ROUTES - ST. LOUIS CITY, ST. LOUIS, ST. CHARLES AND FRANKLIN1 of 1$12,643,875Low
17 FEB 2023230217-F07St. LouisJ6S3281 - ROUTES 61,67,50 - ST. LOUIS COUNTY2 of 3$17,673,589+1.0%
R. V. Wagner, Inc.: latest MoDOT bids in the data

How this record was read

MoDOT letting tabulation PDFs (vendor ranking and bid tabulation), January 2020 to October 2026. About one bid in eight did not match its published total and is left out. Item codes from before mid 2021 are written in the current MoDOT format so one item groups across years.

  • Every bid counted here matched its published total to within one dollar; MoDOT's rank decides who was low.
  • The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
  • A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.

A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy