R. V. Wagner, Inc.: MoDOT bid record
R. V. Wagner, Inc. submitted 54 bids on Missouri DOT contracts in the data, from 17 JAN 2020 to 15 MAY 2026, and was the low bidder on 18 of them (33%). When it was not low, its total sat a median +14% above the low bid.
- Owner
- Missouri DOT
- Low bid volume
- $45,160,554
- Latest bid
- 15 MAY 2026
- Data through
- 16 OCT 2026
By year
| Year | Bids | Low bids | Win rate |
|---|---|---|---|
| 2020 | 12 | 5 | 42% |
| 2021 | 10 | 6 | 60% |
| 2022 | 6 | 1 | 17% |
| 2023 | 5 | 1 | 20% |
| 2024 | 10 | 3 | 30% |
| 2025 | 5 | 0 | 0% |
| 2026 | 6 | 2 | 33% |
By district
| District | Bids | Low bids | Win rate |
|---|---|---|---|
| St. Louis | 48 | 17 | 35% |
| Southeast | 3 | 0 | 0% |
| Central | 2 | 1 | 50% |
| Southwest | 1 | 0 | 0% |
Pay items where it is most often lowest
| Pay item | Code | Unit | Lines bid | Lowest on the line | Its median price | All bidders' median |
|---|---|---|---|---|---|---|
| Misc. epoxy urethane polymer wearing surface W ith healer/sealer prime | 6239905 | SY | 15 | 14 (93%) | $37.65 | $44.25 |
| Sediment removal | 8061016 | CY | 22 | 11 (50%) | $43.50 | $25.69 |
| Epoxy polymer wearing surface | 6233000 | SY | 11 | 8 (73%) | $34.00 | $44.36 |
| Full depth pavement repair saw cut (for perimeter and internal saw cuts) | 6131014 | LF | 9 | 6 (67%) | $7.00 | $6.47 |
| Misc. remove and replace barrier curb | 2169903 | LF | 6 | 6 (100%) | $744.50 | $987.50 |
| Type 5 aggregate for base (4 in. thick) | 3040504 | SY | 12 | 5 (42%) | $14.22 | $14.30 |
| Additional mobilization for seeding | 6181020 | EACH | 5 | 5 (100%) | $600.00 | $600.00 |
| Truck or trailer mounted attenuator (TMA) | 6123000A | EACH | 15 | 4 (27%) | $1,700.00 | $1,000.00 |
| Class 3 excavation | 2063000 | CY | 15 | 4 (27%) | $107.00 | $30.00 |
| Silicone expansion joint sealant | 7173002 | LF | 15 | 4 (27%) | $33.80 | $42.00 |
| Furnishing and placing concrete material for full depth pavement repair | 6131010 | SY | 7 | 4 (57%) | $224.00 | $300.00 |
| Silt fence | 8061019 | LF | 22 | 3 (14%) | $6.88 | $3.45 |
A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.
Who it meets most
| Firm | Contracts in common | That firm ranked ahead |
|---|---|---|
| Gershenson Construction Co., Inc. | 12 | 4 of 12 |
| Lamke Trenching & Excavating, Inc. | 11 | 6 of 11 |
| Kozeny-Wagner, Inc. | 11 | 4 of 11 |
| Pace Construction Company, LLC | 10 | 2 of 10 |
| N.B. West Contracting Company | 9 | 5 of 9 |
| Concrete Strategies, LLC | 8 | 2 of 8 |
| Louis-Company, LLC | 8 | 4 of 8 |
| Above And Below Contracting, LLC | 7 | 4 of 7 |
| Pavement Solutions, LLC | 7 | 2 of 7 |
| K.J.U., Inc. dba K.J. Unnerstall Construction Co. | 7 | 6 of 7 |
Latest bids
| Let | Contract | District | Project | Rank | Its bid | Against the low bid |
|---|---|---|---|---|---|---|
| 15 MAY 2026 | 260515-F01 | St. Louis | ADA improvements, 2 MSE walls, and bridge rehabilitation | 1 of 3 | $7,897,561 | Low, 15% under the second |
| 17 APR 2026 | 260417-F04 | St. Louis | JSL0099 - VARIOUS ROUTES - VARIOUS COUNTIES | 3 of 3 | $2 | +37% |
| 17 APR 2026 | 260417-F05 | St. Louis | JSLM0105 - ROUTE 30 - ST LOUIS, JEFFERSON COUNTIES | 7 of 7 | $1,956,244 | +104% |
| 17 APR 2026 | 260417-F06 | St. Louis | JSL0285 - ROUTE I-44 - ST. LOUIS CITY COUNTY | 1 of 3 | $342,249 | Low, 13% under the second |
| 16 JAN 2026 | 260116-F03 | St. Louis | JSL0208 - VARIOUS ROUTES - VARIOUS COUNTIES | 3 of 7 | $1,473,685 | +7.0% |
| 16 JAN 2026 | 260116-F07 | St. Louis | JSLM0071 - ROUTE 141, 21 - ST. LOUIS, JEFFERSON COUNTIES | 3 of 9 | $225,363 | +9.0% |
| 14 NOV 2025 | 251114-F06 | St. Louis | JSLM0079 - ROUTE 100 - FRANKLIN COUNTY | 4 of 10 | $138,296 | +21% |
| 17 OCT 2025 | 251017-F02 | Southeast | J6P3510C - VARIOUS ROUTES - VARIOUS COUNTIES | 4 of 5 | $8,327,509 | +12% |
| 15 AUG 2025 | 250815-F03 | St. Louis | Rank vendor id vendor name total bid percent of low bid | 3 of 7 | $1,862,561 | +6.0% |
| 18 APR 2025 | 250418-F03 | St. Louis | JSL0074 - ROUTE I-255 - ST LOUIS COUNTY | 2 of 2 | $3,420,512 | +39% |
| 17 JAN 2025 | 250117-F08 | St. Louis | JSLM0045- ROUTE I-270 - ST LOUIS COUNTY | 2 of 8 | $468,109 | +8.0% |
| 15 NOV 2024 | 241115-F03 | St. Louis | J6S3283-ROUTE 21-ST LOUIS COUNTY | 4 of 6 | $23,728,311 | +9.0% |
| 15 NOV 2024 | 241115-F07 | St. Louis | JSL0143 - VARIOUS ROUTES - VARIOUS COUNTIES | 2 of 6 | $1,837,271 | +1.0% |
| 18 OCT 2024 | 241018-H04 | Southeast | J9S3706 - ROUTE 25 - CAPE GIRARDEAU COUNTY | 3 of 7 | $537,994 | +15% |
| 16 AUG 2024 | 240816-F03 | St. Louis | JSLM0047-ROUTES I-64, I-44, 364-ST LOUIS, ST LOUIS CITY, ST CHARLES COUNTIES | 2 of 3 | $1,155,327 | +2.0% |
| 17 MAY 2024 | 240517-F01 | St. Louis | J6I2339 - ROUTE I-170 - ST LOUIS COUNTY | 1 of 6 | $170,472 | Low, 1.0% under the second |
| 17 MAY 2024 | 240517-F04 | St. Louis | J6P3454-VARIOUS ROUTES-FRANKLIN, ST LOUIS, ST CHARLES, JEFFERSON, ST LOUIS CITY | 2 of 2 | $6,208,000 | +2.0% |
| 17 MAY 2024 | 240517-F07 | St. Louis | J6S3278 - ROUTE H - ST. LOUIS CITY | 1 of 4 | $6,760,534 | Low, 2.0% under the second |
| 17 MAY 2024 | 240517-F11 | St. Louis | JSL0093 - ROUTE 364 - ST LOUIS COUNTY | 5 of 6 | $592,831 | +26% |
| 19 APR 2024 | 240419-F05 | St. Louis | J6S3599 - ROUTE N - ST. LOUIS COUNTY | 5 of 5 | $7,629,734 | +24% |
| 19 JAN 2024 | 240119-F03 | St. Louis | JSL0005 - VARIOUS ROUTES - VARIOUS COUNTIES | 1 of 5 | $1,449,233 | Low, 4.0% under the second |
| 17 NOV 2023 | 231117-F02 | St. Louis | J6S3351-ROUTE 109, CC-ST. LOUIS COUNTY | 4 of 5 | $5,310,078 | +14% |
| 18 AUG 2023 | 230818-F03 | St. Louis | JSL0004 - ROUTE D - ST. CHARLES COUNTY | 5 of 9 | $1,057,274 | +25% |
| 19 MAY 2023 | 230519-F03 | St. Louis | J6I3540, J6I3550 -VARIOUS ROUTES - ST. LOUIS CITY, ST. LOUIS, ST. CHARLES AND FRANKLIN | 1 of 1 | $12,643,875 | Low |
| 17 FEB 2023 | 230217-F07 | St. Louis | J6S3281 - ROUTES 61,67,50 - ST. LOUIS COUNTY | 2 of 3 | $17,673,589 | +1.0% |
How this record was read
MoDOT letting tabulation PDFs (vendor ranking and bid tabulation), January 2020 to October 2026. About one bid in eight did not match its published total and is left out. Item codes from before mid 2021 are written in the current MoDOT format so one item groups across years.
- Every bid counted here matched its published total to within one dollar; MoDOT's rank decides who was low.
- The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
- A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.
A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.