Pavement Solutions, LLC: MoDOT bid record

Pavement Solutions, LLC submitted 14 bids on Missouri DOT contracts in the data, from 18 DEC 2020 to 17 APR 2026, and was the low bidder on 2 of them (14%). When it was not low, its total sat a median +31% above the low bid.

Owner
Missouri DOT
Low bid volume
$6,405,026
Latest bid
17 APR 2026
Data through
16 OCT 2026
14Bids
2Low bids
14Win rate, percent
+31%Median gap to the low bid when not low, 12 bids

By year

YearBidsLow bidsWin rate
2020100%
2021300%
2022200%
20244125%
20252150%
2026200%
Pavement Solutions, LLC, MoDOT: bids and low bids by year of letting

Pay items where it is most often lowest

Pay itemCodeUnitLines bidLowest on the lineIts median priceAll bidders' median
Substructure repair (unformed)7040102SF74 (57%)$115.52$198.91
Type 5 aggregate for base (4 in. thick)3040504SY54 (80%)$5.00$14.30
Cleaning and epoxy coating7040113SF54 (80%)$95.00$10.00
Bituminous pavement mixture PG64-22 (base)4013000TON53 (60%)$135.24$150.96
18 in. pipe group A7261018LF53 (60%)$113.06$104.63
Sediment removal8061016CY72 (29%)$107.00$25.69
Preformed thermoplastic pavement marking, 24 in. white6200015LF72 (29%)$21.00$23.50
Silt fence8061019LF62 (33%)$4.62$3.45
Class A excavation2031000CY62 (33%)$36.47$20.00
MGS guardrail6061060LF52 (40%)$48.00$30.00
Preformed thermoplastic pavement marking, left/right arrow6200021EACH52 (40%)$294.00$300.00
Clearing and grubbing2013000ACRE52 (40%)$20,295$6,304.47
Pavement Solutions, LLC, MoDOT: pay items where its unit price was the lowest on the line

A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.

Who it meets most

FirmContracts in commonThat firm ranked ahead
R. V. Wagner, Inc.75 of 7
Gershenson Construction Co., Inc.76 of 7
N.B. West Contracting Company65 of 6
Pace Construction Company, LLC54 of 5
Raineri Construction, LLC31 of 3
Kozeny-Wagner, Inc.32 of 3
K.J.U., Inc. dba K.J. Unnerstall Construction Co.31 of 3
Above And Below Contracting, LLC32 of 3
T. Hill Construction, Inc.22 of 2
CSD Environmental Services, Inc.22 of 2
Pavement Solutions, LLC, MoDOT: the firms on the same contracts most often

Latest bids

LetContractDistrictProjectRankIts bidAgainst the low bid
17 APR 2026260417-F05St. LouisJSLM0105 - ROUTE 30 - ST LOUIS, JEFFERSON COUNTIES4 of 7$1,497,574+56%
16 JAN 2026260116-F07St. LouisJSLM0071 - ROUTE 141, 21 - ST. LOUIS, JEFFERSON COUNTIES4 of 9$298,990+44%
14 NOV 2025251114-F04St. LouisJ6S3625 - ROUTE 67 - ST. LOUIS COUNTY4 of 4$6,260,570+34%
18 APR 2025250418-F04St. LouisJSLM0051 - ROUTE CLAYTON RD - ST. LOUIS COUNTY1 of 2$249,243Low, 10% under the second
18 OCT 2024241018-F07St. LouisJSL0011 - ROUTE 94 - ST.CHARLES COUNTY5 of 5$2,120,882+25%
21 JUN 2024240621-F02St. LouisJSLP0005 - ROUTE STATE PARK - FRANKLIN COUNTY4 of 5$1,392,828+27%
17 MAY 2024240517-F11St. LouisJSL0093 - ROUTE 364 - ST LOUIS COUNTY6 of 6$871,335+85%
19 APR 2024240419-F05St. LouisJ6S3599 - ROUTE N - ST. LOUIS COUNTY1 of 5$6,155,783Low, 3.0% under the second
18 FEB 2022220218-F05St. LouisJ6I3029B - ROUTE I-44 - ST LOUIS COUNTY2 of 3$1,396,006+1.0%
21 JAN 2022220121-F08St. LouisJ6S3293, J6S3628 - ROUTE BB, F - JEFFERSON COUNTIES3 of 3$3,578,250+20%
17 DEC 2021211217-F01St. LouisJ6P3242B - ROUTE 21 - JEFFERSON COUNTY2 of 3$1,565,076+29%
15 OCT 2021211015-F10St. LouisJ6S3429, J6S3429B - ROUTE I-70 - ST. LOUIS CITY2 of 5$3,102,549+14%
17 SEP 2021210917-F06St. LouisJ6S3090C - ROUTE E - JEFFERSON COUNTY6 of 6$475,945+107%
18 DEC 2020201218-F01St. LouisJ6M0282 - ROUTES B/21 - JEFFERSON COUNTY8 of 8$174,444+37%
Pavement Solutions, LLC: latest MoDOT bids in the data

How this record was read

MoDOT letting tabulation PDFs (vendor ranking and bid tabulation), January 2020 to October 2026. About one bid in eight did not match its published total and is left out. Item codes from before mid 2021 are written in the current MoDOT format so one item groups across years.

  • Every bid counted here matched its published total to within one dollar; MoDOT's rank decides who was low.
  • The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
  • A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.

A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.

Your own bid history, read the same way