MoDOT contract 251114-F04 bid tabulation
J6S3625 - ROUTE 67 - ST. LOUIS COUNTY. Let by Missouri DOT on November 14, 2025, St Louis, St. Louis. 4 bids received; low bid $4,685,927 by Gershenson Construction Co., Inc..
- Owner
- Missouri DOT
- Letting
- 14 NOV 2025
- Pay items
- 160
- Data through
- 16 OCT 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Gershenson Construction Co., Inc. | $4,685,927 | Low |
| 2 | Byrne & Jones Enterprises, Inc. dba Byrne & Jones Construction | $5,434,069 | +16% |
| 3 | N.B. West Contracting Company | $5,647,212 | +21% |
| 4 | Pavement Solutions, LLC | $6,260,570 | +34% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Gershenson Construction Co., Inc. | 2. Byrne & Jones Enterprises, Inc. dba Byrne & Jones Construction | 3. N.B. West Contracting Company | 4. Pavement Solutions, LLC |
|---|---|---|---|---|---|---|---|
| 0010 | Clearing and grubbing (2013000) | ACRE | 0.10 | $800,000 | $10,000 | $41,600 | $500,000 |
| 0020 | Removal of improvements (2022010) | LS | 1 | $385,000 | $650,000 | $385,000 | $300,000 |
| 0030 | Class A excavation (2031000) | CY | 1,107 | $35.00 | $50.00 | $37.00 | $51.66 |
| 0040 | Compacting embankment (2036000) | CY | 57 | $36.00 | $100.00 | $19.00 | $72.00 |
| 0050 | Compacting in cut (2037075) | STA | 9.10 | $100.00 | $500.00 | $1,980.00 | $849.00 |
| 0060 | Class 3 excavation (2063000) | CY | 611 | $13.00 | $280.00 | $35.00 | $14.12 |
| 0070 | Culvert cleanout (2063500) | EACH | 35 | $1,900.00 | $1,127.32 | $865.00 | $3,450.00 |
| 0080 | Linear grading class 1 (2071000) | STA | 3.70 | $4,600.00 | $3,000.00 | $3,610.00 | $2,706.00 |
| 0090 | Type 5 aggregate for base (4 in. thick) (3040504) | SY | 2,919 | $15.00 | $12.00 | $28.00 | $3.66 |
| 0100 | Type 5 aggregate for base (6 in. thick) (3040506) | SY | 2,003 | $16.00 | $15.00 | $11.00 | $5.49 |
| 0110 | Misc.optional pavement (4019905) | SY | 1,793.10 | $83.00 | $80.00 | $110.00 | $148.90 |
| 0120 | Misc.high tensile strength synthetic fiber asphaltic concrete pavement PG 76-22 (SP125CLP) (4039910) | TON | 7,940.70 | $125.00 | $130.00 | $155.00 | $202.00 |
| 0130 | Tack coat - non-tracking (4071007) | GAL | 7,273 | $1.00 | $4.50 | $3.25 | $5.74 |
| 0140 | Adjusting basin or inlet (6042020) | EACH | 1 | $1,560.00 | $1,000.00 | $1,260.00 | $1,191.00 |
| 0150 | Misc.adjusting manholes, valves, meters & pull boxes (6049902) | EACH | 50 | $250.00 | $475.00 | $883.18 | $764.00 |
| 0160 | Misc.concrete manhole apron (6049902) | EACH | 40 | $750.00 | $2,000.00 | $1,920.00 | $1,794.00 |
| 0170 | Concrete median (6081000) | SY | 476.60 | $158.00 | $183.00 | $240.00 | $243.00 |
| 0180 | Truncated domes (6081012) | SF | 348 | $27.00 | $30.00 | $34.00 | $24.98 |
| 0190 | Paved approach, 8 in. (6085008) | SY | 1,486.30 | $105.00 | $120.00 | $186.00 | $150.00 |
| 0200 | Concrete sidewalk, 4 in. (6086004) | SY | 1,103.10 | $89.00 | $60.00 | $181.00 | $161.00 |
| 0210 | Concrete sidewalk, 7 in. (6086007) | SY | 259.70 | $117.00 | $175.00 | $100.00 | $253.00 |
| 0220 | Misc.ADA curb ramp (6089902) | EACH | 79 | $4,025.00 | $3,400.00 | $7,000.00 | $4,668.00 |
| 0225 | Misc.concrete sidewalk, 6 in (6089905) | SY | 59.70 | $105.00 | $175.00 | $140.00 | $217.00 |
| 0230 | Concrete curb (6 in. height and under) type S (6091010) | LF | 387 | $86.00 | $53.00 | $90.00 | $80.00 |
| 0240 | Concrete curb (over 6 in. height) type S (6091011) | LF | 30 | $189.00 | $70.00 | $123.00 | $83.00 |
| 0250 | Curb and gutter type A (6091051) | LF | 116 | $60.00 | $100.00 | $80.00 | $91.00 |
| 0260 | Paved ditch (6091060) | SY | 71.50 | $111.00 | $150.00 | $360.00 | $177.00 |
| 0270 | Integral curb (6 in. height and under) type A (6092011) | LF | 15 | $107.00 | $65.00 | $120.00 | $74.00 |
| 0280 | Impact attenuator 40 MPH (sand barrel array) (6122008) | EACH | 1 | $2,500.00 | $2,500.00 | $2,500.00 | $6,095.00 |
| 0290 | Truck mounted attenuator (TMA) (6123001) | LS | 1 | $1,000.00 | $20,000 | $1.00 | $11,500 |
| 0300 | Furnishing and placing concrete material for full depth pavement repair (6131010) | SY | 56.70 | $565.00 | $190.00 | $392.00 | $226.20 |
| 0310 | Subgrade compaction (6 in. depth) (pavement repair) (6131012) | SY | 6 | $1.00 | $1.00 | $1.00 | $170.00 |
| 0320 | Type 1 or 5 aggregate for base (4 in. thick) (pavement repair) (6131013) | SY | 6 | $1.00 | $20.00 | $1.00 | $82.00 |
| 0330 | Full depth pavement repair saw cut (for perimeter and internal saw cuts) (6131014) | LF | 148 | $10.00 | $15.00 | $28.00 | $3.45 |
| 0340 | Dowel bar (drilling, furnishing and installation) for full depth pavement repair (6131015) | EACH | 60 | $5.00 | $7.00 | $25.00 | $33.62 |
| 0350 | Dowel bar (furnishing and installation with baskets) for full depth pavement repair (6131017) | EACH | 10 | $5.00 | $10.00 | $10.00 | $38.77 |
| 0360 | Curved vane grate and frame (2 FT. X 2 FT. or 600MM X 600MM) (6141120) | EACH | 1 | $1,550.00 | $1,200.00 | $700.00 | $1,320.40 |
| 0370 | Curved vane grate and frame (4 FT. X 2 FT. or 1200MM X 600MM) (6141121) | EACH | 1 | $2,030.00 | $1,850.00 | $1,100.00 | $1,891.45 |
| 0380 | Manhole frame and cover, type 1-B (6143011) | EACH | 1 | $535.00 | $1,485.00 | $600.00 | $1,375.00 |
| 0390 | Manhole frame and cover, type 2 (6143012) | EACH | 1 | $590.00 | $1,150.00 | $500.00 | $1,418.00 |
| 0400 | Manhole frame and cover, type 3 (6143013) | EACH | 6 | $350.00 | $785.00 | $1,600.00 | $1,130.00 |
| 0410 | Manhole frame and cover, type 4 (6143014) | EACH | 1 | $455.00 | $1,100.00 | $450.00 | $1,244.00 |
| 0420 | Changeable message sign without communication interface, contractor furnished retained (6161098A) | EACH | 2 | $2,800.00 | $2,800.00 | $2,800.00 | $5,750.00 |
| 0430 | Misc.lump sum traffic control (6169901) | LS | 1 | $25,000 | $24,760 | $50,000 | $34,971 |
| 0440 | Temporary traffic barrier, contractor furnished retained (6173600D) | LF | 725 | $10.00 | $26.50 | $26.50 | $40.25 |
| 0450 | Mobilization (6181000) | LS | 1 | $450,000 | $750,000 | $550,000 | $540,871 |
| 0460 | Preformed thermoplastic pavement marking, 24 in. white (6200015) | LF | 2,059 | $18.00 | $18.00 | $18.00 | $24.15 |
| 0470 | Preformed thermoplastic pavement marking, left/right arrow (6200021) | EACH | 66 | $280.00 | $280.00 | $280.00 | $356.50 |
| 0480 | Preformed thermoplastic pavement marking, straight arrow (6200024) | EACH | 3 | $250.00 | $250.00 | $250.00 | $333.00 |
| 0490 | Preformed thermoplastic pavement marking, combination STR/LT/RT (6200027) | EACH | 9 | $450.00 | $450.00 | $450.00 | $690.00 |
| 0500 | Preformed thermoplastic pavement marking, word (only) (6200030) | EACH | 1 | $450.00 | $450.00 | $450.00 | $759.00 |
| 0510 | Preformed thermoplastic pavement marking, 24 in. X 36 in., yield line triangle (6200042A) | EACH | 44 | $75.00 | $75.00 | $75.00 | $51.75 |
| 0520 | 4 in. yellow class 2 pavement marking paint (25-mil, type L beads) (6205901B) | LF | 20,240 | $0.23 | $0.23 | $0.23 | $0.46 |
| 0530 | 6 in. white class 2 pavement marking paint (25-mil, type L beads) (6205902B) | LF | 30,040 | $0.31 | $0.31 | $0.31 | $0.52 |
| 0540 | 6 in. yellow class 2 pavement marking paint (25-mil, type L beads) (6205903B) | LF | 208 | $5.00 | $5.00 | $5.00 | $0.52 |
| 0550 | 12 in. white class 2 pavement marking paint (25-mil, type L beads) (6205906B) | LF | 273 | $8.00 | $8.00 | $8.00 | $1.15 |
| 0560 | Misc.temporary pavement marking paint (6209901) | LS | 1 | $5,000.00 | $10,000 | $0.10 | $11,500 |
| 0570 | Misc.18 in. island tubular marker (6209902) | EACH | 33 | $120.00 | $120.00 | $120.10 | $195.50 |
| 0580 | Misc.curb reflector (6209902) | EACH | 363 | $60.00 | $60.00 | $60.10 | $34.50 |
| 0590 | Coldmilling bituminous pavement for removal of surfacing (3 in. thick or less) (6221001) | SY | 72,740 | $4.12 | $3.84 | $3.65 | $7.08 |
| 0600 | Contractor furnished surveying and staking (6274000) | LS | 1 | $30,000 | $18,500 | $30,000 | $24,150 |
| 0610 | 12 in. pipe group B (7250312A) | LF | 263 | $120.00 | $155.00 | $135.00 | $98.50 |
| 0620 | 18 in. pipe group B (7250318A) | LF | 129 | $115.00 | $220.00 | $150.00 | $139.34 |
| 0630 | 12 in. pipe group A (7261012) | LF | 14 | $155.00 | $500.00 | $260.00 | $136.19 |
| 0640 | 18 in. pipe group A (7261018) | LF | 132 | $140.00 | $235.00 | $135.00 | $128.11 |
| 0650 | Misc.4 in. PVC (7269903) | LF | 12 | $80.00 | $60.00 | $69.00 | $155.47 |
| 0660 | Precast concrete manhole - 48 in. (7310048) | FT | 19 | $590.00 | $1,110.00 | $465.00 | $587.79 |
| 0670 | Precast concrete drop inlet 3 FT X 2 FT-6 in. (7311030) | FT | 25 | $650.00 | $1,050.00 | $928.00 | $910.00 |
| 0680 | Precast concrete drop inlet 4 FT X 2 FT (7311042) | FT | 3 | $895.00 | $1,525.00 | $1,318.00 | $1,286.00 |
| 0690 | Precast concrete drop inlet 5 FT X 3 FT (7311053) | FT | 9 | $590.00 | $1,510.00 | $683.00 | $915.00 |
| 0700 | Misc.inlet top replacement (in kind) (7319902) | EACH | 1 | $2,015.00 | $2,850.00 | $7,000.00 | $2,457.00 |
| 0710 | Misc.modified type A gutter W/ steel plates (7319902) | EACH | 6 | $7,350.00 | $5,000.00 | $6,000.00 | $105.00 |
| 0720 | Misc.channel drain (7319903) | LF | 49 | $233.00 | $500.00 | $600.00 | $146.00 |
| 0730 | Misc.modified 2'X2' precast type 'A' drop inlet (7319903) | LF | 3 | $706.00 | $1,350.00 | $1,317.00 | $1,076.00 |
| 0740 | Misc.MSD area inlet (7319903) | LF | 4 | $2,500.00 | $1,480.00 | $996.00 | $1,101.00 |
| 0750 | Mulching (8025006) | ACRE | 0.10 | $10,000 | $10,000 | $10,000 | $11,500 |
| 0760 | Turf type tall fescue sodding (8031000A) | SY | 557 | $22.00 | $22.00 | $22.00 | $25.30 |
| 0770 | Seeding - cool season grasses (8051000A) | ACRE | 0.10 | $10,000 | $10,000 | $10,000 | $11,500 |
| 0780 | Sediment trap rock (8061004) | CY | 3.40 | $1.00 | $1,000.00 | $0.10 | $307.62 |
| 0790 | Rock ditch check (8061005) | LF | 16 | $50.00 | $125.00 | $20.00 | $23.00 |
| 0800 | Curb inlet check (8061007A) | EACH | 12 | $135.00 | $100.00 | $125.00 | $144.00 |
| 0810 | Sediment removal (8061016) | CY | 7 | $1.00 | $150.00 | $1.00 | $107.00 |
| 0820 | Silt fence (8061019) | LF | 482 | $5.00 | $5.00 | $0.10 | $5.75 |
| 0830 | Misc.eastern wahoo (8089902) | EACH | 32 | $140.00 | $140.00 | $140.00 | $161.00 |
| 0840 | MGS guardrail (6061060) | LF | 25 | $100.00 | $100.00 | $100.00 | $104.00 |
| 0850 | MGS end anchor (6061080) | EACH | 1 | $2,400.00 | $2,400.00 | $2,400.00 | $4,590.75 |
| 0860 | Type A crashworthy end terminal (MASH) (6063014) | EACH | 1 | $4,100.00 | $4,100.00 | $4,100.00 | $8,386.00 |
| 0870 | Relocated pole (9011010) | EACH | 4 | $797.00 | $1,100.00 | $797.00 | $916.00 |
| 0880 | Lighting pole, 45 FT. or 13.5 M, type at design 2 (9011062) | EACH | 2 | $3,721.00 | $3,495.00 | $3,721.00 | $4,279.00 |
| 0890 | Luminaire, LED-C (9011313) | EACH | 2 | $533.00 | $805.00 | $533.00 | $612.00 |
| 0900 | Conduit, 2 in. rigid, in trench (9013002) | LF | 410 | $15.50 | $15.00 | $15.50 | $18.00 |
| 0910 | Conduit, 4 in. rigid, pushed (9014004) | LF | 60 | $45.50 | $28.00 | $45.50 | $52.00 |
| 0920 | Trenching type I (9015010) | LF | 310 | $7.00 | $10.00 | $7.00 | $8.00 |
| 0930 | Pull box, preformed class 1 (9016110) | EACH | 5 | $1,675.00 | $1,560.00 | $1,675.00 | $1,926.00 |
| 0940 | Cable, 4 AWG 1 conductor (9017004) | LF | 1,130 | $2.60 | $3.10 | $2.60 | $3.00 |
| 0950 | Cable, 6 AWG 1 conductor (9017006) | LF | 1,130 | $2.00 | $1.90 | $2.00 | $2.30 |
| 0960 | Cable, 10 AWG 1 conductor, pole and bracket (9017110) | LF | 590 | $1.00 | $1.00 | $1.00 | $1.15 |
| 0970 | Wire, 4 AWG, bare neutral (9017204) | LF | 570 | $3.30 | $3.10 | $3.30 | $3.80 |
| 0980 | Wire, 6 AWG, bare neutral (9017206) | LF | 570 | $2.55 | $1.90 | $2.55 | $2.93 |
| 0990 | Cable-conduit, 1 in., 2 conductors and 1 bare neutral, 6 AWG (9017404) | LF | 350 | $6.50 | $5.80 | $6.50 | $7.48 |
| 1000 | Pole foundation (45 FT. or 13.5 M mounting height) (9018245) | EACH | 2 | $2,132.00 | $2,222.00 | $2,132.00 | $2,451.00 |
| 1010 | Misc.pedestrian lighting foundation (9019902) | EACH | 4 | $1,797.00 | $1,400.00 | $1,797.00 | $2,066.00 |
| 1020 | Signal head, type 3B (9020513) | EACH | 21 | $1,250.00 | $1,336.00 | $1,250.00 | $1,437.00 |
| 1030 | Signal head, type 4B (9020514) | EACH | 6 | $1,482.00 | $1,490.00 | $1,482.00 | $1,704.00 |
| 1040 | SH-flat sheet - signal sign (9020833) | SF | 202 | $47.00 | $38.00 | $47.00 | $54.00 |
| 1050 | Signal sign, mounting hardware (9020834) | EACH | 52 | $310.00 | $295.00 | $310.00 | $356.00 |
| 1060 | Luminaire LED-A, 120 volt compatible (9022651) | EACH | 2 | $344.00 | $583.00 | $344.00 | $395.00 |
| 1070 | Post, signal 8 FT. (9022708) | EACH | 16 | $1,254.00 | $1,222.00 | $1,254.00 | $1,442.00 |
| 1080 | Post, type CL, 25 FT. arm or 7.6 M arm (9023125) | EACH | 1 | $11,775 | $11,992 | $11,775 | $13,541 |
| 1090 | Post, type CL, 30 FT. arm or 9.1 M arm (9023130) | EACH | 1 | $13,600 | $13,643 | $13,600 | $15,640 |
| 1100 | Post, type C, 35 FT. arm or 10.7 M arm (9023235) | EACH | 2 | $12,230 | $10,150 | $12,230 | $14,064 |
| 1110 | Post, type C, 45 FT. arm or 13.7 M arm (9023245) | EACH | 3 | $13,886 | $14,337 | $13,886 | $16,000 |
| 1120 | Post, type C, 55 FT. arm (9023255) | EACH | 1 | $16,208 | $16,918 | $16,208 | $18,600 |
| 1130 | Controller assembly housing, NEMA TS2 controller (9024283) | EACH | 2 | $19,928 | $22,735 | $19,928 | $22,917 |
| 1150 | Conduit, 2 in., trench with tracer wire (9025200) | LF | 1,056 | $16.75 | $15.00 | $16.75 | $19.26 |
| 1160 | Conduit, 3 in., trench with tracer wire (9025300) | LF | 185 | $17.25 | $22.00 | $17.25 | $19.84 |
| 1170 | Conduit, 3 in., median with tracer wire (9026300) | LF | 136 | $17.25 | $22.00 | $17.25 | $19.84 |
| 1180 | Conduit, 2 in., pushed with tracer wire (9027200) | LF | 543 | $19.00 | $24.00 | $19.00 | $21.85 |
| 1190 | Conduit, 3 in., pushed with tracer wire (9027300) | LF | 770 | $52.00 | $25.00 | $52.00 | $59.80 |
| 1200 | Cable, 8 AWG 1 conductor, power (9028208) | LF | 650 | $1.55 | $1.80 | $1.55 | $1.78 |
| 1210 | Cable, 16 AWG 2 conductor (9028308) | LF | 4,010 | $1.10 | $1.30 | $1.10 | $1.27 |
| 1220 | Cable, 16 AWG 3 conductor (9028309) | LF | 480 | $1.15 | $1.45 | $1.15 | $1.32 |
| 1230 | Cable, 16 AWG 5 conductor (9028310) | LF | 4,020 | $1.80 | $1.60 | $1.80 | $2.07 |
| 1240 | Cable, 16 AWG 7 conductor (9028311) | LF | 4,430 | $2.15 | $1.70 | $2.15 | $2.47 |
| 1250 | Power supply assembly, type 1 (9028610) | EACH | 2 | $1.00 | $3,900.00 | $1.00 | $1.15 |
| 1260 | Pull box, preformed class 2 (9028811) | EACH | 4 | $2,518.00 | $2,360.00 | $2,518.00 | $2,895.00 |
| 1270 | Pull box, preformed class 3 (9028812) | EACH | 4 | $3,584.00 | $3,000.00 | $3,584.00 | $4,121.00 |
| 1280 | Pull box, concrete, double, type A (9028821) | EACH | 2 | $8,342.00 | $6,400.00 | $8,342.00 | $9,593.00 |
| 1290 | Base, concrete (9029100) | CY | 34.30 | $2,681.00 | $1,700.00 | $2,681.00 | $3,083.00 |
| 1300 | Misc.green powder coating, signal equipment (9029901) | LS | 1 | $5,649.00 | $9,000.00 | $5,649.00 | $6,496.00 |
| 1310 | Misc.traffic signal maintenance & programming (9029901) | LS | 1 | $16,090 | $15,640 | $16,090 | $18,503 |
| 1320 | Misc.accessible pedestrian pushbutton and signing (9029902) | EACH | 28 | $1,108.00 | $1,345.00 | $1,108.00 | $1,274.00 |
| 1330 | Misc.atc traffic signal controller (9029902) | EACH | 2 | $3,862.00 | $5,800.00 | $3,862.00 | $4,441.00 |
| 1340 | Misc.combination pad mounted 120V/240V power supply and lighting controller with UPS (9029902) | EACH | 2 | $24,348 | $27,374 | $24,348 | $28,000 |
| 1350 | Misc.countdown pedestrian signal head, type 1S (9029902) | EACH | 20 | $636.00 | $750.00 | $636.00 | $731.00 |
| 1360 | Misc.network connected signal monitor (9029902) | EACH | 2 | $1,490.00 | $2,600.00 | $1,490.00 | $1,713.00 |
| 1370 | Misc.push button extender (9029902) | EACH | 4 | $341.00 | $240.00 | $341.00 | $392.00 |
| 1380 | Misc.reflective backplate modification (9029902) | EACH | 42 | $242.00 | $330.00 | $242.00 | $278.00 |
| 1390 | Misc.SL district traffic signal detection system (9029902) | EACH | 2 | $36,268 | $38,636 | $36,268 | $41,708 |
| 1400 | Misc.temporary generator for signal power (9029902) | EACH | 2 | $463.00 | $2,300.00 | $463.00 | $532.00 |
| 1410 | 2 in. PSST post - 12 GA. (9031270A) | LF | 661 | $32.00 | $32.00 | $32.00 | $39.00 |
| 1420 | Driven post anchor for 2 in. PSST - 12 GA. (9031271A) | EACH | 35 | $380.00 | $380.00 | $380.00 | $310.00 |
| 1430 | Concrete post anchor for 2 in. PSST. - 7 GA. (9031274) | EACH | 30 | $450.00 | $450.00 | $450.00 | $722.00 |
| 1440 | 2.5 in. PSST post - 12 GA. (9031280) | LF | 128 | $38.00 | $38.00 | $38.00 | $193.00 |
| 1450 | Driven post anchor for 2.5 in. PSST - 7 GA. (9031281A) | EACH | 10 | $425.00 | $425.00 | $425.00 | $361.00 |
| 1460 | SH-flat sheet (9035004A) | SF | 454 | $38.00 | $38.00 | $38.00 | $117.00 |
| 1470 | SHF-flat sheet fluorescent (9035069A) | SF | 374 | $42.00 | $42.00 | $42.00 | $135.00 |
| 1480 | Cable, 12 AWG, 2 conductor (9108302) | LF | 410 | $1.20 | $2.00 | $1.20 | $1.38 |
| 1490 | Misc.ITS asset management tool (9109901) | LS | 1 | $3,381.00 | $12,000 | $3,381.00 | $3,888.00 |
| 1500 | Misc.CCTV camera assembly (9109902) | EACH | 2 | $4,700.00 | $6,000.00 | $4,700.00 | $5,405.00 |
| 1510 | Misc.CCTV extension pole, 20' metallic finish (9109902) | EACH | 2 | $2,650.00 | $2,600.00 | $2,650.00 | $3,047.00 |
| 1520 | Misc.fiber optic fusion splice (9109902) | EACH | 100 | $134.00 | $70.00 | $134.00 | $154.00 |
| 1530 | Misc.install CCTV camera assembly (9109902) | EACH | 2 | $1,387.00 | $1,400.00 | $1,387.00 | $1,595.00 |
| 1540 | Misc.install modot furnished IP-addressable power strip (9109902) | EACH | 2 | $174.00 | $600.00 | $174.00 | $200.00 |
| 1550 | Misc.relocate existing communications equipment (9109902) | EACH | 2 | $232.00 | $1,500.00 | $232.00 | $266.00 |
| 1560 | Misc.SM fiber optic jumper (9109902) | EACH | 12 | $48.00 | $72.00 | $48.00 | $55.00 |
| 1570 | Misc.SM fiber optic pigtail (9109902) | EACH | 12 | $29.00 | $72.00 | $29.00 | $33.00 |
| 1580 | Misc.wall-mounted interconnect center (9109902) | EACH | 2 | $976.00 | $1,400.00 | $976.00 | $1,122.00 |
| 1590 | Misc.CCTV camera cable (9109903) | LF | 410 | $3.10 | $3.25 | $3.10 | $3.57 |
| 1600 | Misc.fiber optic cable, 24 strand, single mode (9109903) | LF | 4,350 | $8.75 | $4.00 | $8.75 | $10.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from MoDOT's tabulation for this contract. MoDOT letting tabulation PDFs (vendor ranking and bid tabulation), January 2020 to October 2026. About one bid in eight did not match its published total and is left out. Item codes from before mid 2021 are written in the current MoDOT format so one item groups across years.
Every contract let that day: MoDOT letting of November 14, 2025. Compiled by Mirage Metrics.