Gershenson Construction Co., Inc.: MoDOT bid record
Gershenson Construction Co., Inc. submitted 73 bids on Missouri DOT contracts in the data, from 17 JAN 2020 to 16 OCT 2026, and was the low bidder on 14 of them (19%). When it was not low, its total sat a median +15% above the low bid.
- Owner
- Missouri DOT
- Low bid volume
- $113,069,824
- Latest bid
- 16 OCT 2026
- Data through
- 16 OCT 2026
By year
| Year | Bids | Low bids | Win rate |
|---|---|---|---|
| 2020 | 3 | 0 | 0% |
| 2021 | 3 | 1 | 33% |
| 2022 | 6 | 3 | 50% |
| 2023 | 6 | 2 | 33% |
| 2024 | 19 | 2 | 11% |
| 2025 | 24 | 5 | 21% |
| 2026 | 12 | 1 | 8% |
By district
| District | Bids | Low bids | Win rate |
|---|---|---|---|
| St. Louis | 64 | 13 | 20% |
| Northeast | 4 | 0 | 0% |
| Southeast | 3 | 0 | 0% |
| Central | 2 | 1 | 50% |
Pay items where it is most often lowest
| Pay item | Code | Unit | Lines bid | Lowest on the line | Its median price | All bidders' median |
|---|---|---|---|---|---|---|
| Type A crashworthy end terminal (MASH) | 6063014 | EACH | 45 | 31 (69%) | $3,800.00 | $3,300.00 |
| MGS guardrail | 6061060 | LF | 39 | 25 (64%) | $32.00 | $30.00 |
| Class 3 excavation | 2063000 | CY | 35 | 25 (71%) | $13.00 | $30.00 |
| SH-flat sheet | 9035004A | SF | 44 | 24 (55%) | $32.00 | $28.00 |
| Silt fence | 8061019 | LF | 50 | 23 (46%) | $3.50 | $3.45 |
| SHF-flat sheet fluorescent | 9035069A | SF | 40 | 23 (57%) | $36.00 | $32.00 |
| Preformed thermoplastic pavement marking, 24 in. white | 6200015 | LF | 48 | 22 (46%) | $20.84 | $23.50 |
| Preformed thermoplastic pavement marking, left/right arrow | 6200021 | EACH | 45 | 22 (49%) | $297.36 | $300.00 |
| Concrete sidewalk, 4 in. | 6086004 | SY | 31 | 20 (65%) | $60.00 | $79.31 |
| Conduit, 3 in., trench with tracer wire | 9025300 | LF | 28 | 20 (71%) | $17.81 | $25.00 |
| Curb inlet check | 8061007A | EACH | 27 | 20 (74%) | $50.00 | $145.38 |
| Subgrade compaction (6 in. depth) (pavement repair) | 6131012 | SY | 26 | 20 (77%) | $1.00 | $3.00 |
A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.
Who it meets most
| Firm | Contracts in common | That firm ranked ahead |
|---|---|---|
| Pace Construction Company, LLC | 39 | 21 of 39 |
| N.B. West Contracting Company | 39 | 25 of 39 |
| Byrne & Jones Enterprises, Inc. dba Byrne & Jones Construction | 18 | 10 of 18 |
| R. V. Wagner, Inc. | 12 | 8 of 12 |
| Kozeny-Wagner, Inc. | 11 | 6 of 11 |
| Plattin Creek Excavating, LLC dba PCX Construction, LLC | 10 | 5 of 10 |
| Lamke Trenching & Excavating, Inc. | 9 | 2 of 9 |
| KCI Construction Company | 7 | 3 of 7 |
| Pavement Solutions, LLC | 7 | 1 of 7 |
| K.J.U., Inc. dba K.J. Unnerstall Construction Co. | 7 | 4 of 7 |
Latest bids
| Let | Contract | District | Project | Rank | Its bid | Against the low bid |
|---|---|---|---|---|---|---|
| 16 OCT 2026 | 261016-F03 | St. Louis | JSL0172, JSL0249-ROUTES 115, I-70 SOR-ST LOUIS COUNTY | 2 of 4 | $3,518,540 | +8.0% |
| 16 OCT 2026 | 261016-F05 | St. Louis | JSLM0077 - ROUTE 141 OR - JEFFERSON COUNTY | 3 of 5 | $432,419 | +9.0% |
| 18 SEP 2026 | 260918-F05 | St. Louis | JSLM0078 - ROUTE BB - JEFDFERSON COUNTY | 1 of 1 | $348,836 | Low |
| 18 JUN 2026 | 260618-F01 | St. Louis | J6I3020D, J6I350B, JSL0021 - I-270 - ST. LOUIS COUNTY | 3 of 4 | $45,440,249 | +11% |
| 15 MAY 2026 | 260515-D05 | Central | JCD0228 - ROUTE A - WASHINGTON COUNTY | 3 of 6 | $2,406,648 | +5.0% |
| 15 MAY 2026 | 260515-F03 | St. Louis | JSL0029-ROUTE 67-ST LOUIS COUNTY | 3 of 4 | $7,381,632 | +4.0% |
| 15 MAY 2026 | 260515-F04 | St. Louis | JSL0033-ROUTE 47-FRANKLIN COUNTY | 3 of 3 | $1,815,611 | +30% |
| 17 APR 2026 | 260417-B02 | Northeast | Faf 47-1(95) | 2 of 3 | $23,708,771 | +26% |
| 17 APR 2026 | 260417-F02 | St. Louis | J6S3625C - ROUTE 67 - ST LOUIS COUNTY | 3 of 3 | $5,674,547 | +15% |
| 20 MAR 2026 | 260320-F01 | St. Louis | J6P3510D - ROUTE 100 - ST. LOUIS COUNTY | 3 of 5 | $5,670,581 | +1.0% |
| 20 FEB 2026 | 260220-F02 | St. Louis | JSL0186-ROUTE D-ST LOUIS | 2 of 2 | $4,357,058 | +7.0% |
| 16 JAN 2026 | 260116-F08 | St. Louis | J6P3636 - ROUTE 67 - ST. CHARLES COUNTY | 2 of 3 | $19,172,318 | +4.0% |
| 14 NOV 2025 | 251114-F02 | St. Louis | J6S3557 - ROUTE 67 - ST. LOUIS COUNTY | 1 of 4 | $13,515,221 | Low, 7.0% under the second |
| 14 NOV 2025 | 251114-F03 | St. Louis | J6S3611 - ROUTE T - FRANKLIN, ST. LOUIS COUNTIES | 4 of 4 | $5,360,219 | +31% |
| 14 NOV 2025 | 251114-F04 | St. Louis | J6S3625 - ROUTE 67 - ST. LOUIS COUNTY | 1 of 4 | $4,685,927 | Low, 16% under the second |
| 14 NOV 2025 | 251114-F05 | St. Louis | JSL0081 - ROUTE 30 - ST. LOUIS COUNTY | 4 of 4 | $10,735,799 | +26% |
| 14 NOV 2025 | 251114-F06 | St. Louis | JSLM0079 - ROUTE 100 - FRANKLIN COUNTY | 5 of 10 | $149,694 | +31% |
| 17 OCT 2025 | 251017-F02 | Southeast | J6P3510C - VARIOUS ROUTES - VARIOUS COUNTIES | 5 of 5 | $8,710,945 | +17% |
| 17 OCT 2025 | 251017-F05 | St. Louis | J6S3578 - ROUTE 61/67 - ST LOUIS COUNTY | 2 of 5 | $10,135,964 | +7.0% |
| 17 OCT 2025 | 251017-F06 | St. Louis | JSL0041 - ROUTE CC - JEFFERSON COUNTY | 5 of 6 | $1,767,326 | +46% |
| 19 SEP 2025 | 250919-F03 | St. Louis | JSL0014 - ROUTE 61 OR - ST. CHARLES COUNTY | 3 of 7 | $155,378 | +25% |
| 19 SEP 2025 | 250919-F05 | St. Louis | J6S3631-ROUTE 231-ST LOUIS COUNTY | 3 of 4 | $14,551,427 | +7.0% |
| 16 MAY 2025 | 250516-B05 | St. Louis | JNE0167B - ROUTE I-70 SOR - WARREN AND ST CHARLES COUNTY | 5 of 5 | $951,134 | +21% |
| 16 MAY 2025 | 250516-F01 | St. Louis | J6P3274, J6P3274B - ROUTE 100 - ST LOUIS COUNTY | 1 of 4 | $19,043,651 | Low, 2.0% under the second |
| 16 MAY 2025 | 250516-F07 | St. Louis | J6S3397 - ROUTE 267 - ST LOUIS COUNTY | 2 of 2 | $15,041,102 | +2.0% |
How this record was read
MoDOT letting tabulation PDFs (vendor ranking and bid tabulation), January 2020 to October 2026. About one bid in eight did not match its published total and is left out. Item codes from before mid 2021 are written in the current MoDOT format so one item groups across years.
- Every bid counted here matched its published total to within one dollar; MoDOT's rank decides who was low.
- The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
- A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.
A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.