Gershenson Construction Co., Inc.: MoDOT bid record

Gershenson Construction Co., Inc. submitted 73 bids on Missouri DOT contracts in the data, from 17 JAN 2020 to 16 OCT 2026, and was the low bidder on 14 of them (19%). When it was not low, its total sat a median +15% above the low bid.

Owner
Missouri DOT
Low bid volume
$113,069,824
Latest bid
16 OCT 2026
Data through
16 OCT 2026
73Bids
14Low bids
19Win rate, percent
+15%Median gap to the low bid when not low, 59 bids

By year

YearBidsLow bidsWin rate
2020300%
20213133%
20226350%
20236233%
202419211%
202524521%
20261218%
Gershenson Construction Co., Inc., MoDOT: bids and low bids by year of letting

By district

DistrictBidsLow bidsWin rate
St. Louis641320%
Northeast400%
Southeast300%
Central2150%
Gershenson Construction Co., Inc., MoDOT: bids and low bids by district

Pay items where it is most often lowest

Pay itemCodeUnitLines bidLowest on the lineIts median priceAll bidders' median
Type A crashworthy end terminal (MASH)6063014EACH4531 (69%)$3,800.00$3,300.00
MGS guardrail6061060LF3925 (64%)$32.00$30.00
Class 3 excavation2063000CY3525 (71%)$13.00$30.00
SH-flat sheet9035004ASF4424 (55%)$32.00$28.00
Silt fence8061019LF5023 (46%)$3.50$3.45
SHF-flat sheet fluorescent9035069ASF4023 (57%)$36.00$32.00
Preformed thermoplastic pavement marking, 24 in. white6200015LF4822 (46%)$20.84$23.50
Preformed thermoplastic pavement marking, left/right arrow6200021EACH4522 (49%)$297.36$300.00
Concrete sidewalk, 4 in.6086004SY3120 (65%)$60.00$79.31
Conduit, 3 in., trench with tracer wire9025300LF2820 (71%)$17.81$25.00
Curb inlet check8061007AEACH2720 (74%)$50.00$145.38
Subgrade compaction (6 in. depth) (pavement repair)6131012SY2620 (77%)$1.00$3.00
Gershenson Construction Co., Inc., MoDOT: pay items where its unit price was the lowest on the line

A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.

Who it meets most

Latest bids

LetContractDistrictProjectRankIts bidAgainst the low bid
16 OCT 2026261016-F03St. LouisJSL0172, JSL0249-ROUTES 115, I-70 SOR-ST LOUIS COUNTY2 of 4$3,518,540+8.0%
16 OCT 2026261016-F05St. LouisJSLM0077 - ROUTE 141 OR - JEFFERSON COUNTY3 of 5$432,419+9.0%
18 SEP 2026260918-F05St. LouisJSLM0078 - ROUTE BB - JEFDFERSON COUNTY1 of 1$348,836Low
18 JUN 2026260618-F01St. LouisJ6I3020D, J6I350B, JSL0021 - I-270 - ST. LOUIS COUNTY3 of 4$45,440,249+11%
15 MAY 2026260515-D05CentralJCD0228 - ROUTE A - WASHINGTON COUNTY3 of 6$2,406,648+5.0%
15 MAY 2026260515-F03St. LouisJSL0029-ROUTE 67-ST LOUIS COUNTY3 of 4$7,381,632+4.0%
15 MAY 2026260515-F04St. LouisJSL0033-ROUTE 47-FRANKLIN COUNTY3 of 3$1,815,611+30%
17 APR 2026260417-B02NortheastFaf 47-1(95)2 of 3$23,708,771+26%
17 APR 2026260417-F02St. LouisJ6S3625C - ROUTE 67 - ST LOUIS COUNTY3 of 3$5,674,547+15%
20 MAR 2026260320-F01St. LouisJ6P3510D - ROUTE 100 - ST. LOUIS COUNTY3 of 5$5,670,581+1.0%
20 FEB 2026260220-F02St. LouisJSL0186-ROUTE D-ST LOUIS2 of 2$4,357,058+7.0%
16 JAN 2026260116-F08St. LouisJ6P3636 - ROUTE 67 - ST. CHARLES COUNTY2 of 3$19,172,318+4.0%
14 NOV 2025251114-F02St. LouisJ6S3557 - ROUTE 67 - ST. LOUIS COUNTY1 of 4$13,515,221Low, 7.0% under the second
14 NOV 2025251114-F03St. LouisJ6S3611 - ROUTE T - FRANKLIN, ST. LOUIS COUNTIES4 of 4$5,360,219+31%
14 NOV 2025251114-F04St. LouisJ6S3625 - ROUTE 67 - ST. LOUIS COUNTY1 of 4$4,685,927Low, 16% under the second
14 NOV 2025251114-F05St. LouisJSL0081 - ROUTE 30 - ST. LOUIS COUNTY4 of 4$10,735,799+26%
14 NOV 2025251114-F06St. LouisJSLM0079 - ROUTE 100 - FRANKLIN COUNTY5 of 10$149,694+31%
17 OCT 2025251017-F02SoutheastJ6P3510C - VARIOUS ROUTES - VARIOUS COUNTIES5 of 5$8,710,945+17%
17 OCT 2025251017-F05St. LouisJ6S3578 - ROUTE 61/67 - ST LOUIS COUNTY2 of 5$10,135,964+7.0%
17 OCT 2025251017-F06St. LouisJSL0041 - ROUTE CC - JEFFERSON COUNTY5 of 6$1,767,326+46%
19 SEP 2025250919-F03St. LouisJSL0014 - ROUTE 61 OR - ST. CHARLES COUNTY3 of 7$155,378+25%
19 SEP 2025250919-F05St. LouisJ6S3631-ROUTE 231-ST LOUIS COUNTY3 of 4$14,551,427+7.0%
16 MAY 2025250516-B05St. LouisJNE0167B - ROUTE I-70 SOR - WARREN AND ST CHARLES COUNTY5 of 5$951,134+21%
16 MAY 2025250516-F01St. LouisJ6P3274, J6P3274B - ROUTE 100 - ST LOUIS COUNTY1 of 4$19,043,651Low, 2.0% under the second
16 MAY 2025250516-F07St. LouisJ6S3397 - ROUTE 267 - ST LOUIS COUNTY2 of 2$15,041,102+2.0%
Gershenson Construction Co., Inc.: latest MoDOT bids in the data

How this record was read

MoDOT letting tabulation PDFs (vendor ranking and bid tabulation), January 2020 to October 2026. About one bid in eight did not match its published total and is left out. Item codes from before mid 2021 are written in the current MoDOT format so one item groups across years.

  • Every bid counted here matched its published total to within one dollar; MoDOT's rank decides who was low.
  • The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
  • A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.

A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy