J6S3578 - ROUTE 61/67 - ST LOUIS COUNTY. Let by Missouri DOT on October 17, 2025, St Louis, St. Louis. 5 bids received; low bid $9,472,497 by N.B. West Contracting Company.
- Owner
- Missouri DOT
- Letting
- 17 OCT 2025
- Pay items
- 165
- Data through
- 16 OCT 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | N.B. West Contracting Company | $9,472,497 | Low |
| 2 | Gershenson Construction Co., Inc. | $10,135,964 | +7.0% |
| 3 | Pace Construction Company, LLC | $10,203,777 | +8.0% |
| 4 | Lamke Trenching & Excavating, Inc. | $10,359,930 | +9.0% |
| 5 | Byrne & Jones Enterprises, Inc. dba Byrne & Jones Construction | $11,027,745 | +16% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. N.B. West Contracting Company | 2. Gershenson Construction Co., Inc. | 3. Pace Construction Company, LLC | 4. Lamke Trenching & Excavating, Inc. | 5. Byrne & Jones Enterprises, Inc. dba Byrne & Jones Construction |
|---|---|---|---|---|---|---|---|---|
| 0010 | Signet dbe reporting (1081000) | LS | 1 | $1,000.00 | $1,000.00 | $1,000.00 | $1,000.00 | $1,000.00 |
| 0020 | Removal of improvements (2022010) | LS | 1 | $804,582 | $1,000,000 | $1,349,742 | $1,294,840 | $1,000,000 |
| 0030 | Class 3 excavation (2063000) | CY | 84 | $0.01 | $15.00 | $245.00 | $245.00 | $165.00 |
| 0040 | Culvert cleanout (2063500) | EACH | 1 | $500.00 | $6,800.00 | $2,000.00 | $2,000.00 | $10,000 |
| 0050 | Linear grading class 1 (2071000) | STA | 12.60 | $1,200.00 | $500.00 | $3,100.00 | $3,100.00 | $2,500.00 |
| 0060 | Misc.linear grading class 2, modified (2079909) | STA | 142.80 | $1,600.00 | $2,300.00 | $1,115.00 | $1,115.37 | $2,000.00 |
| 0070 | Misc.shaping slopes, class III (modified) (2159910) | 100F | 31 | $1,400.00 | $1,400.00 | $1,400.00 | $1,400.00 | $1,400.00 |
| 0080 | Type 5 aggregate for base (4 in. thick) (3040504) | SY | 12,207 | $12.00 | $13.65 | $15.00 | $15.40 | $12.00 |
| 0090 | Type 5 aggregate for base (6 in. thick) (3040506) | SY | 1,891 | $20.00 | $15.00 | $22.90 | $21.93 | $20.00 |
| 0100 | Type A2 shoulder (4010150) | SY | 38.20 | $150.00 | $215.00 | $288.00 | $288.00 | $1,000.00 |
| 0110 | Asphaltic concrete mixture PG 76-22 (SP125C mix) (4030105) | TON | 202.50 | $204.00 | $159.00 | $140.00 | $140.00 | $280.00 |
| 0120 | Asphaltic concrete mixture PG 76-22 (SP125CLP mix) (4030111) | TON | 18,269.20 | $112.00 | $110.00 | $99.25 | $99.25 | $120.00 |
| 0130 | Asphaltic concrete mixture PG 64-22 (SP190C mix) (4030206) | TON | 815.30 | $160.00 | $108.00 | $127.00 | $127.00 | $190.00 |
| 0140 | Tack coat (4071005) | GAL | 17,065 | $2.35 | $6.00 | $2.50 | $2.50 | $4.50 |
| 0150 | Concrete pavement (10 1/2 in. non-reinforced, 15 FT. joints) (5021334) | SY | 22.70 | $320.00 | $372.00 | $276.55 | $276.55 | $325.00 |
| 0160 | Wateradjust to grade water valve (6039902) | EACH | 10 | $200.00 | $350.00 | $1,250.00 | $1,250.00 | $500.00 |
| 0170 | Adjusting manhole (6042010) | EACH | 12 | $750.00 | $700.00 | $1,650.00 | $1,650.00 | $750.00 |
| 0180 | Adjusting basin or inlet (6042020) | EACH | 3 | $2,500.00 | $1,265.00 | $2,840.00 | $2,840.00 | $1,000.00 |
| 0190 | Truncated domes (6081012) | SF | 829 | $35.00 | $26.00 | $61.80 | $61.80 | $23.00 |
| 0200 | 6 in. concrete median strip (6083006) | SY | 242.30 | $190.00 | $177.00 | $119.30 | $119.38 | $150.00 |
| 0210 | Paved approach, 8 in. (6085008) | SY | 5,212.70 | $126.00 | $105.00 | $153.00 | $160.00 | $100.00 |
| 0220 | Concrete sidewalk, 4 in. (6086004) | SY | 5,231.30 | $58.00 | $54.00 | $66.20 | $69.30 | $58.00 |
| 0230 | Concrete sidewalk, 7 in. (6086007) | SY | 190.50 | $215.00 | $133.00 | $135.40 | $141.30 | $125.00 |
| 0240 | Misc.ADA curb ramp (6089902) | EACH | 119 | $3,467.00 | $2,625.00 | $4,600.00 | $5,308.00 | $2,800.00 |
| 0250 | Concrete curb (6 in. height and under) type S (6091010) | LF | 976 | $52.00 | $53.00 | $42.70 | $45.00 | $38.00 |
| 0260 | Concrete gutter type B (6091042) | LF | 565 | $58.00 | $35.00 | $64.50 | $70.40 | $84.00 |
| 0270 | Curb and gutter type B (6091052) | LF | 538 | $55.00 | $65.00 | $63.75 | $69.75 | $42.00 |
| 0280 | Concrete curb and gutter (4 inch) (6091055) | LF | 356 | $64.00 | $65.00 | $62.30 | $68.60 | $35.00 |
| 0290 | Integral curb (6 in. height and under) type A (6092011) | LF | 138 | $40.00 | $25.00 | $76.80 | $85.00 | $27.00 |
| 0300 | Furnishing type 2 rock ditch liner (6096020) | CY | 211 | $58.00 | $55.00 | $64.10 | $64.10 | $100.00 |
| 0310 | Placing type 2 rock ditch liner (6096042) | CY | 211 | $44.00 | $74.00 | $85.00 | $84.85 | $100.00 |
| 0320 | Truck mounted attenuator (TMA) (6123001) | LS | 1 | $26,000 | $5,000.00 | $17,500 | $25,000 | $50,000 |
| 0330 | Furnishing and placing concrete material for full depth pavement repair (6131010) | SY | 190 | $460.00 | $320.00 | $402.00 | $402.00 | $350.00 |
| 0340 | Subgrade compaction (6 in. depth) (pavement repair) (6131012) | SY | 190 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0350 | Type 1 or 5 aggregate for base (4 in. thick) (pavement repair) (6131013) | SY | 190 | $5.00 | $5.00 | $2.00 | $2.00 | $1.00 |
| 0360 | Full depth pavement repair saw cut (for perimeter and internal saw cuts) (6131014) | LF | 855 | $12.00 | $10.00 | $6.50 | $6.50 | $10.00 |
| 0370 | Dowel bar (drilling, furnishing and installation) for full depth pavement repair (6131015) | EACH | 570 | $7.00 | $12.00 | $7.00 | $7.00 | $7.00 |
| 0380 | Furnishing and placing bituminous material for class B partial depth pavement repair (6133018) | TON | 2,251.70 | $100.00 | $90.00 | $0.01 | $0.01 | $180.00 |
| 0390 | Removal for class B partial depth pavement repair (6133019) | SY | 3,925.80 | $40.00 | $13.50 | $51.00 | $51.00 | $12.95 |
| 0400 | Changeable message sign with communication interface, contractor furnished retained (6161099) | EACH | 2 | $2,200.00 | $2,200.00 | $2,200.00 | $2,200.00 | $2,900.00 |
| 0410 | Misc.lump sum temporary traffic control (6169901) | LS | 1 | $30,000 | $65,000 | $22,050 | $22,050 | $40,000 |
| 0420 | Concrete traffic barrier, type B (6172000) | LF | 70 | $352.00 | $210.00 | $300.00 | $300.00 | $250.00 |
| 0430 | Mobilization (6181000) | LS | 1 | $445,389 | $1,100,000 | $747,000 | $698,000 | $1,200,000 |
| 0440 | Preformed thermoplastic pavement marking, 24 in. white (6200015) | LF | 2,925 | $18.00 | $18.00 | $18.00 | $18.00 | $18.00 |
| 0450 | Preformed thermoplastic pavement marking, left/right arrow (6200021) | EACH | 108 | $280.00 | $280.00 | $280.00 | $280.00 | $285.00 |
| 0460 | Preformed thermoplastic pavement marking, straight arrow (6200024) | EACH | 2 | $250.00 | $250.00 | $250.00 | $250.00 | $225.00 |
| 0470 | Preformed thermoplastic pavement marking, combination STR/LT/RT (6200027) | EACH | 5 | $450.00 | $450.00 | $450.00 | $450.00 | $300.00 |
| 0480 | Preformed thermoplastic pavement marking, 24 in. X 36 in., yield line triangle (6200042A) | EACH | 59 | $75.00 | $75.00 | $75.00 | $75.00 | $75.00 |
| 0490 | Preformed thermoplastic pavement marking, lane reduction arrow (6200054) | EACH | 2 | $1,400.00 | $1,400.00 | $1,400.00 | $1,400.00 | $1,200.00 |
| 0500 | 4 in. yellow class 2 pavement marking paint (25-mil, type L beads) (6205901B) | LF | 52,301 | $0.30 | $0.30 | $0.30 | $0.30 | $0.19 |
| 0510 | 6 in. white class 2 pavement marking paint (25-mil, type L beads) (6205902B) | LF | 58,404 | $0.30 | $0.30 | $0.30 | $0.30 | $0.35 |
| 0520 | Misc.temporary pavement marking paint (6209901) | LS | 1 | $1.00 | $1,000.00 | $12,106 | $10,000 | $100,000 |
| 0530 | Misc.18 in. white island tubular marker (6209902) | EACH | 24 | $175.00 | $125.00 | $67.00 | $67.00 | $200.00 |
| 0540 | Misc.curb reflectors (6209902) | EACH | 67 | $35.00 | $25.00 | $25.00 | $25.00 | $300.00 |
| 0550 | Coldmilling bituminous pavement for removal of surfacing (3 in. thick or less) (6221001) | SY | 168,760 | $2.25 | $3.00 | $2.00 | $2.00 | $2.90 |
| 0560 | Permanent erosion control geotextile (6240103A) | SY | 623 | $7.00 | $8.00 | $5.00 | $5.00 | $10.00 |
| 0570 | Contractor furnished surveying and staking (6274000) | LS | 1 | $14,000 | $50,000 | $500.00 | $38,850 | $50,000 |
| 0580 | 12 in. pipe group A (7261012) | LF | 158 | $69.00 | $101.00 | $310.00 | $310.00 | $145.00 |
| 0590 | 12 in. or allowed substitute group A flared end section (7320612A) | EACH | 4 | $545.00 | $870.00 | $4,680.00 | $4,680.00 | $1,000.00 |
| 0600 | Turf type tall fescue sodding (8031000A) | SY | 6,059 | $12.50 | $12.50 | $12.50 | $12.50 | $12.50 |
| 0610 | Curb inlet check (8061007A) | EACH | 126 | $75.00 | $10.00 | $125.00 | $125.00 | $125.00 |
| 0620 | Sediment removal (8061016) | CY | 248 | $0.01 | $1.00 | $25.00 | $250.00 | $100.00 |
| 0630 | Silt fence (8061019) | LF | 12,186 | $0.01 | $2.00 | $3.05 | $3.50 | $3.05 |
| 0640 | MGS guardrail (6061060) | LF | 1,663 | $32.00 | $32.00 | $32.00 | $32.00 | $32.00 |
| 0650 | MGS guardrail, 8 FT. posts, 6 FT. - 3 in. spacing (6061061) | LF | 375 | $38.00 | $38.00 | $38.00 | $38.00 | $38.00 |
| 0660 | MGS guardrail, 6 FT. posts, 1 FT. - 6.75 in. spacing (6061065) | LF | 223 | $72.00 | $72.00 | $72.00 | $72.00 | $72.00 |
| 0670 | MGS bridge approach transition section (extended curb) (6061068) | EACH | 3 | $4,200.00 | $4,200.00 | $4,200.00 | $4,200.00 | $4,200.00 |
| 0680 | MGS height and block transition (6061074) | EACH | 6 | $800.00 | $800.00 | $800.00 | $800.00 | $800.00 |
| 0690 | MGS end anchor (6061080) | EACH | 7 | $1,800.00 | $1,800.00 | $1,800.00 | $1,800.00 | $1,800.00 |
| 0700 | Type A crashworthy end terminal (MASH) (6063014) | EACH | 10 | $3,900.00 | $3,900.00 | $3,900.00 | $3,900.00 | $3,900.00 |
| 0710 | Relocated pole (9011010) | EACH | 1 | $1,777.00 | $1,777.00 | $1,777.00 | $1,777.00 | $1,777.00 |
| 0720 | Luminaire, LED-A (9011311) | EACH | 4 | $420.00 | $420.00 | $420.00 | $420.00 | $420.00 |
| 0730 | Luminaire, LED-B (9011312) | EACH | 6 | $460.00 | $460.00 | $460.00 | $460.00 | $460.00 |
| 0740 | Conduit, 2 in. rigid, in trench (9013002) | LF | 361 | $12.00 | $12.00 | $12.00 | $12.00 | $12.00 |
| 0750 | Conduit, 4 in. rigid, pushed (9014004) | LF | 359 | $28.00 | $28.00 | $28.00 | $28.00 | $28.00 |
| 0760 | Trenching type I (9015010) | LF | 529 | $8.00 | $8.00 | $8.00 | $8.00 | $8.00 |
| 0770 | Pull box, preformed class 1 (9016110) | EACH | 6 | $1,335.00 | $1,335.00 | $1,335.00 | $1,335.00 | $1,335.00 |
| 0780 | Cable, 8 AWG 1 conductor (9017008) | LF | 1,570 | $1.20 | $1.20 | $1.20 | $1.20 | $1.20 |
| 0790 | Cable, 10 AWG 1 conductor, pole and bracket (9017110) | LF | 600 | $0.70 | $0.70 | $0.70 | $0.70 | $0.70 |
| 0800 | Cable-conduit, 1 in., 2 conductors and 1 bare neutral, 8 AWG (9017407) | LF | 530 | $6.00 | $6.00 | $6.00 | $6.00 | $6.00 |
| 0810 | Pole foundation (30 FT. or 9.0 M mounting height) (9018230) | EACH | 7 | $1,165.00 | $1,165.00 | $1,165.00 | $1,165.00 | $1,165.00 |
| 0820 | Pole foundation (45 FT. or 13.5 M mounting height) (9018245) | EACH | 2 | $1,750.00 | $1,750.00 | $1,750.00 | $1,750.00 | $1,750.00 |
| 0830 | Misc.30 FT. tenon mount light pole (9019902) | EACH | 7 | $2,925.00 | $2,925.00 | $2,925.00 | $2,925.00 | $2,925.00 |
| 0840 | Misc.45 FT. tenon mount light pole (9019902) | EACH | 2 | $4,120.00 | $4,120.00 | $4,120.00 | $4,120.00 | $4,120.00 |
| 0850 | Misc.pad mounted power supply and controller (9019902) | EACH | 4 | $11,800 | $11,800 | $11,800 | $11,800 | $11,800 |
| 0860 | Misc.tenon mount LED-A luminaire (9019902) | EACH | 7 | $500.00 | $500.00 | $500.00 | $500.00 | $500.00 |
| 0870 | Misc.tenon mount LED-B luminaire (9019902) | EACH | 2 | $545.00 | $545.00 | $545.00 | $545.00 | $545.00 |
| 0880 | Signal head, type 3S (9020213) | EACH | 3 | $1,025.00 | $1,025.00 | $1,025.00 | $1,025.00 | $1,025.00 |
| 0890 | Signal head, type 4S (9020214) | EACH | 3 | $1,180.00 | $1,180.00 | $1,180.00 | $1,180.00 | $1,180.00 |
| 0900 | Signal head, type 3B (9020513) | EACH | 26 | $1,230.00 | $1,230.00 | $1,230.00 | $1,230.00 | $1,230.00 |
| 0910 | Signal head, type 4B (9020514) | EACH | 9 | $1,290.00 | $1,290.00 | $1,290.00 | $1,290.00 | $1,290.00 |
| 0920 | SH-flat sheet - signal sign (9020833) | SF | 153 | $75.00 | $75.00 | $75.00 | $75.00 | $75.00 |
| 0930 | Signal sign, mounting hardware (9020834) | EACH | 20 | $200.00 | $200.00 | $200.00 | $200.00 | $200.00 |
| 0940 | Luminaire LED-A, 120 volt compatible (9022651) | EACH | 11 | $390.00 | $390.00 | $390.00 | $390.00 | $390.00 |
| 0950 | Post, signal 8 FT. (9022708) | EACH | 7 | $1,120.00 | $1,120.00 | $1,120.00 | $1,120.00 | $1,120.00 |
| 0960 | Post, type CL, 20 FT. arm or 6.1 M arm (9023120) | EACH | 2 | $8,290.00 | $8,290.00 | $8,290.00 | $8,290.00 | $8,290.00 |
| 0970 | Post, type CL, 35 FT. arm or 10.7 M arm (9023135) | EACH | 3 | $11,135 | $11,135 | $11,135 | $11,135 | $11,135 |
| 0980 | Post, type CL, 40 FT. arm or 12.2 M arm (9023140) | EACH | 1 | $11,180 | $11,180 | $11,180 | $11,180 | $11,180 |
| 0990 | Post, type C, 25 FT. arm or 7.6 M arm (9023225) | EACH | 1 | $8,000.00 | $8,000.00 | $8,000.00 | $8,000.00 | $8,000.00 |
| 1000 | Post, type C, 30 FT. arm or 9.1 M arm (9023230) | EACH | 1 | $9,450.00 | $9,450.00 | $9,450.00 | $9,450.00 | $9,450.00 |
| 1010 | Post, type C, 45 FT. arm or 13.7 M arm (9023245) | EACH | 4 | $13,790 | $13,790 | $13,790 | $13,790 | $13,790 |
| 1020 | Post, type C, 50 FT. arm or 15.2 M arm (9023250) | EACH | 2 | $15,175 | $15,175 | $15,175 | $15,175 | $15,175 |
| 1030 | Controller assembly housing, NEMA TS2 controller (9024283) | EACH | 12 | $22,241 | $22,241 | $22,241 | $22,241 | $22,241 |
| 1040 | Conduit, 3 in., trench with tracer wire (9025300) | LF | 1,217 | $16.50 | $16.50 | $16.50 | $16.50 | $16.50 |
| 1050 | Conduit, 3 in., pushed with tracer wire (9027300) | LF | 2,126 | $33.00 | $33.00 | $33.00 | $33.00 | $33.00 |
| 1060 | Cable, 10 AWG 1 conductor, pole and bracket (9028100) | LF | 780 | $0.70 | $0.70 | $0.70 | $0.70 | $0.70 |
| 1070 | Cable, 8 AWG 1 conductor, power (9028208) | LF | 3,360 | $1.20 | $1.20 | $1.20 | $1.20 | $1.20 |
| 1080 | Cable, 12 AWG 2 conductor (9028302) | LF | 1,230 | $1.05 | $1.05 | $1.05 | $1.05 | $1.05 |
| 1090 | Cable, 16 AWG 2 conductor (9028308) | LF | 6,410 | $0.75 | $0.75 | $0.75 | $0.75 | $0.75 |
| 1100 | Cable, 16 AWG 5 conductor (9028310) | LF | 4,810 | $1.55 | $1.55 | $1.55 | $1.55 | $1.55 |
| 1110 | Cable, 16 AWG 7 conductor (9028311) | LF | 8,850 | $2.10 | $2.10 | $2.10 | $2.10 | $2.10 |
| 1120 | Pull box, preformed class 1 (9028810) | EACH | 4 | $1,335.00 | $1,335.00 | $1,335.00 | $1,335.00 | $1,335.00 |
| 1130 | Pull box, preformed class 2 (9028811) | EACH | 13 | $2,220.00 | $2,220.00 | $2,220.00 | $2,220.00 | $2,220.00 |
| 1140 | Pull box, preformed class 3 (9028812) | EACH | 4 | $3,170.00 | $3,170.00 | $3,170.00 | $3,170.00 | $3,170.00 |
| 1150 | Base, concrete (9029100) | CY | 67.10 | $2,100.00 | $2,100.00 | $2,100.00 | $2,100.00 | $2,100.00 |
| 1160 | Misc.temporary signal cabinet/controller (9029901) | LS | 1 | $10,210 | $10,210 | $10,210 | $10,210 | $10,210 |
| 1170 | Misc.traffic signal maintenance and programming (9029901) | LS | 1 | $15,900 | $15,900 | $15,900 | $15,900 | $15,900 |
| 1180 | Misc.accessible pedestrian pushbutton and signing (9029902) | EACH | 36 | $850.00 | $850.00 | $850.00 | $850.00 | $850.00 |
| 1190 | Misc.atc traffic signal controller (9029902) | EACH | 12 | $3,775.00 | $3,775.00 | $3,775.00 | $3,775.00 | $3,775.00 |
| 1200 | Misc.combination pad mounted 12V/240V signal power supply and lighting controller with UPS (9029902) | EACH | 12 | $23,000 | $23,000 | $23,000 | $23,000 | $23,000 |
| 1210 | Misc.countdown pedestrian signal head, type 1S (9029902) | EACH | 36 | $585.00 | $585.00 | $585.00 | $585.00 | $585.00 |
| 1220 | Misc.network connected signal monitor (9029902) | EACH | 11 | $1,475.00 | $1,475.00 | $1,475.00 | $1,475.00 | $1,475.00 |
| 1230 | Misc.pedestrian push button stanchion, 4.5 FT (9029902) | EACH | 9 | $980.00 | $980.00 | $980.00 | $980.00 | $980.00 |
| 1240 | Misc.SL district traffic signal detection system (9029902) | EACH | 10 | $30,300 | $30,300 | $30,300 | $30,300 | $30,300 |
| 1250 | Breakaway assembly (perforated square steel tube) (9031241) | EACH | 1 | $500.00 | $500.00 | $500.00 | $500.00 | $500.00 |
| 1260 | 2.25 in. PSST post insert (6 FT.) - 12 GA. (9031272A) | EACH | 1 | $200.00 | $200.00 | $200.00 | $200.00 | $200.00 |
| 1270 | 2.5 in. PSST post - 12 GA. (9031280) | LF | 168 | $38.00 | $38.00 | $38.00 | $38.00 | $38.00 |
| 1280 | Driven post anchor for 2.5 in. PSST - 7 GA. (9031281A) | EACH | 11 | $350.00 | $350.00 | $350.00 | $500.00 | $350.00 |
| 1290 | Concrete post anchor for 2.5 in. PSST. - 7 GA. (9031285) | EACH | 3 | $500.00 | $500.00 | $500.00 | $500.00 | $500.00 |
| 1300 | SH-flat sheet (9035004A) | SF | 18 | $32.00 | $32.00 | $32.00 | $32.00 | $32.00 |
| 1310 | SHF-flat sheet fluorescent (9035069A) | SF | 166 | $36.00 | $36.00 | $36.00 | $36.00 | $36.00 |
| 1320 | Misc.remove and relocate existing ground mount sign (9039902) | EACH | 10 | $1,200.00 | $1,200.00 | $1,200.00 | $1,200.00 | $1,200.00 |
| 1330 | Conduit, 2 in., trench with tracer wire (9025200) | LF | 5,464 | $10.00 | $10.00 | $10.00 | $10.00 | $10.00 |
| 1340 | Conduit, 2 in., pushed with tracer wire (9027200) | LF | 102 | $20.00 | $20.00 | $20.00 | $20.00 | $20.00 |
| 1350 | Fiber optic cable, 24-strand, 18 single mode, 6 multimode (9108352) | LF | 3,670 | $2.25 | $2.25 | $2.25 | $2.25 | $2.25 |
| 1360 | Misc.ITS asset management tool (9109901) | LS | 1 | $3,600.00 | $3,600.00 | $3,600.00 | $3,600.00 | $3,600.00 |
| 1370 | Misc.removal of existing fiber optic cable (9109901) | LS | 1 | $2,460.00 | $2,460.00 | $2,460.00 | $2,460.00 | $2,460.00 |
| 1380 | Misc.adjust to grade modot pull box (9109902) | EACH | 4 | $1,425.00 | $1,425.00 | $1,425.00 | $1,425.00 | $1,425.00 |
| 1390 | Misc.CCTV camera assembly (9109902) | EACH | 4 | $150.00 | $150.00 | $150.00 | $150.00 | $150.00 |
| 1400 | Misc.CCTV extension pole, 20' metallic finish (9109902) | EACH | 2 | $2,700.00 | $2,700.00 | $2,700.00 | $2,700.00 | $2,700.00 |
| 1410 | Misc.FO fusion splice (9109902) | EACH | 30 | $80.00 | $80.00 | $80.00 | $80.00 | $80.00 |
| 1420 | Misc.FO jumper (9109902) | EACH | 46 | $25.00 | $25.00 | $25.00 | $25.00 | $25.00 |
| 1430 | Misc.FO pigtail (9109902) | EACH | 30 | $18.00 | $18.00 | $18.00 | $18.00 | $18.00 |
| 1440 | Misc.install CCTV camera assembly (9109902) | EACH | 4 | $1,200.00 | $1,200.00 | $1,200.00 | $1,200.00 | $1,200.00 |
| 1450 | Misc.install conduit into existing box (9109902) | EACH | 8 | $375.00 | $375.00 | $375.00 | $375.00 | $375.00 |
| 1460 | Misc.install modot furnished IP-addressable power strip (9109902) | EACH | 5 | $170.00 | $170.00 | $170.00 | $175.00 | $170.00 |
| 1470 | Misc.install or relocate existing and new communication equipment (9109902) | EACH | 10 | $525.00 | $525.00 | $525.00 | $525.00 | $525.00 |
| 1480 | Misc.ITS pull box with concrete pad, preformed class 2 (9109902) | EACH | 5 | $2,820.00 | $2,820.00 | $2,820.00 | $2,820.00 | $2,820.00 |
| 1490 | Misc.ITS pull box with concrete pad, preformed class 5 (9109902) | EACH | 1 | $3,370.00 | $3,370.00 | $3,370.00 | $3,370.00 | $3,370.00 |
| 1500 | Misc.CCTV camera cable (9109903) | LF | 680 | $2.50 | $2.50 | $2.50 | $2.50 | $2.50 |
| 1510 | Misc.fiber optic cable, 24 strand, single mode (9109903) | LF | 1,980 | $2.25 | $2.25 | $2.25 | $2.25 | $2.25 |
| 1520 | Misc.modot ITS assets relocation (9109903) | LF | 1,000 | $15.00 | $15.00 | $15.00 | $15.00 | $15.00 |
| 1530 | Removal of existing expansion joint seal or sealant (2165000) | LF | 184 | $10.00 | $75.00 | $10.00 | $10.00 | $100.00 |
| 1540 | Epoxy polymer wearing surface (6233000) | SY | 1,230 | $34.40 | $34.40 | $34.40 | $34.40 | $54.00 |
| 1550 | Half-sole repair (7040104) | SF | 200 | $175.00 | $135.00 | $175.00 | $175.00 | $300.00 |
| 1560 | Concrete crack filler (7040163) | SY | 408 | $19.00 | $19.00 | $19.00 | $19.00 | $9.10 |
| 1570 | Protective coating - concrete bents and piers (urethane) (7110100) | LS | 1 | $78,220 | $60,000 | $60,000 | $60,000 | $60,000 |
| 1580 | Cleaning and coating existing bearings (7123100) | EACH | 20 | $500.00 | $500.00 | $500.00 | $500.00 | $500.00 |
| 1590 | Open cell foam joint seal (7172054) | LF | 184 | $118.00 | $175.00 | $118.00 | $118.00 | $150.00 |
| 1600 | Half-sole repair (7040104) | SF | 500 | $160.00 | $135.00 | $160.00 | $160.00 | $300.00 |
| 1610 | Concrete crack filler (7040163) | SY | 9,306 | $9.80 | $9.80 | $9.80 | $9.80 | $9.10 |
| 1620 | Protective coating - concrete bents and piers (urethane) (7110100) | LS | 1 | $132,330 | $100,000 | $100,000 | $100,000 | $100,000 |
| 1630 | Surface preparation for overcoating structural steel (system G) (7125201) | SF | 3,500 | $20.00 | $20.00 | $20.00 | $20.00 | $20.00 |
| 1640 | Intermediate field coat (system G) (7125365A) | SF | 3,500 | $5.00 | $5.00 | $5.00 | $5.00 | $5.00 |
| 1650 | Finish field coat (system G) (7125370A) | SF | 3,500 | $5.00 | $5.00 | $5.00 | $5.00 | $5.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from MoDOT's tabulation for this contract. MoDOT letting tabulation PDFs (vendor ranking and bid tabulation), January 2020 to October 2026. About one bid in eight did not match its published total and is left out. Item codes from before mid 2021 are written in the current MoDOT format so one item groups across years.
Every contract let that day: MoDOT letting of October 17, 2025. Compiled by Mirage Metrics.