Lamke Trenching & Excavating, Inc.: MoDOT bid record
Lamke Trenching & Excavating, Inc. submitted 26 bids on Missouri DOT contracts in the data, from 17 JAN 2020 to 16 OCT 2026, and was the low bidder on 5 of them (19%). When it was not low, its total sat a median +30% above the low bid.
- Owner
- Missouri DOT
- Low bid volume
- $12,614,576
- Latest bid
- 16 OCT 2026
- Data through
- 16 OCT 2026
By year
| Year | Bids | Low bids | Win rate |
|---|---|---|---|
| 2020 | 3 | 0 | 0% |
| 2021 | 1 | 1 | 100% |
| 2022 | 2 | 1 | 50% |
| 2023 | 1 | 0 | 0% |
| 2024 | 6 | 1 | 17% |
| 2025 | 5 | 1 | 20% |
| 2026 | 8 | 1 | 13% |
By district
| District | Bids | Low bids | Win rate |
|---|---|---|---|
| St. Louis | 17 | 3 | 18% |
| Central | 7 | 2 | 29% |
| Northeast | 1 | 0 | 0% |
| Southeast | 1 | 0 | 0% |
Pay items where it is most often lowest
| Pay item | Code | Unit | Lines bid | Lowest on the line | Its median price | All bidders' median |
|---|---|---|---|---|---|---|
| Turf type tall fescue sodding | 8031000A | SY | 10 | 9 (90%) | $14.50 | $13.00 |
| Preformed thermoplastic pavement marking, 24 in. white | 6200015 | LF | 11 | 8 (73%) | $18.00 | $23.50 |
| Base, concrete | 9029100 | CY | 9 | 8 (89%) | $2,600.00 | $2,100.00 |
| Conduit, 3 in., trench with tracer wire | 9025300 | LF | 9 | 8 (89%) | $18.00 | $25.00 |
| Cable, 16 AWG 2 conductor | 9028308 | LF | 8 | 8 (100%) | $1.25 | $1.77 |
| Cable, 16 AWG 5 conductor | 9028310 | LF | 8 | 8 (100%) | $1.65 | $2.15 |
| Subgrade compaction (6 in. depth) (pavement repair) | 6131012 | SY | 10 | 7 (70%) | $1.00 | $3.00 |
| Conduit, 3 in., pushed with tracer wire | 9027300 | LF | 8 | 7 (88%) | $30.00 | $37.50 |
| Post, signal 8 FT. | 9022708 | EACH | 8 | 7 (88%) | $1,255.00 | $1,451.16 |
| Type A crashworthy end terminal (MASH) | 6063014 | EACH | 7 | 7 (100%) | $3,800.00 | $3,300.00 |
| MGS guardrail | 6061060 | LF | 7 | 7 (100%) | $32.00 | $30.00 |
| Preformed thermoplastic pavement marking, left/right arrow | 6200021 | EACH | 8 | 6 (75%) | $280.00 | $300.00 |
A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.
Who it meets most
| Firm | Contracts in common | That firm ranked ahead |
|---|---|---|
| R. V. Wagner, Inc. | 11 | 5 of 11 |
| N.B. West Contracting Company | 10 | 7 of 10 |
| Gershenson Construction Co., Inc. | 9 | 7 of 9 |
| Pace Construction Company, LLC | 5 | 5 of 5 |
| Above And Below Contracting, LLC | 4 | 1 of 4 |
| Byrne & Jones Enterprises, Inc. dba Byrne & Jones Construction | 4 | 1 of 4 |
| Iowa Civil Contracting, Inc. | 3 | 1 of 3 |
| Diamond Surface, Inc. | 3 | 1 of 3 |
| Emery Sapp & Sons, Inc. | 3 | 0 of 3 |
| Raineri Construction, LLC dba Raineri Construction | 3 | 3 of 3 |
Latest bids
| Let | Contract | District | Project | Rank | Its bid | Against the low bid |
|---|---|---|---|---|---|---|
| 16 OCT 2026 | 261016-F05 | St. Louis | JSLM0077 - ROUTE 141 OR - JEFFERSON COUNTY | 5 of 5 | $586,823 | +48% |
| 15 MAY 2026 | 260515-F01 | St. Louis | ADA improvements, 2 MSE walls, and bridge rehabilitation | 2 of 3 | $9,092,886 | +15% |
| 15 MAY 2026 | 260515-F02 | St. Louis | JSL0076B-ROUTE 340-ST LOUIS COUNTY | 1 of 3 | $4,119,820 | Low, 9.0% under the second |
| 15 MAY 2026 | 260515-F03 | St. Louis | JSL0029-ROUTE 67-ST LOUIS COUNTY | 2 of 4 | $7,175,981 | +1.0% |
| 17 APR 2026 | 260417-D02 | Central | JCD0010 - ROUTE I-44 - LACLEDE, PULASKI, PHELPS, CRAWFORD COUNTIES | 3 of 3 | $3 | +72% |
| 17 APR 2026 | 260417-F04 | St. Louis | JSL0099 - VARIOUS ROUTES - VARIOUS COUNTIES | 2 of 3 | $2 | +30% |
| 17 APR 2026 | 260417-F06 | St. Louis | JSL0285 - ROUTE I-44 - ST. LOUIS CITY COUNTY | 2 of 3 | $387,667 | +13% |
| 20 MAR 2026 | 260320-F01 | St. Louis | J6P3510D - ROUTE 100 - ST. LOUIS COUNTY | 5 of 5 | $7,150,413 | +28% |
| 17 OCT 2025 | 251017-F02 | Southeast | J6P3510C - VARIOUS ROUTES - VARIOUS COUNTIES | 2 of 5 | $7,717,590 | +4.0% |
| 17 OCT 2025 | 251017-F05 | St. Louis | J6S3578 - ROUTE 61/67 - ST LOUIS COUNTY | 4 of 5 | $10,359,930 | +9.0% |
| 15 AUG 2025 | 250815-F03 | St. Louis | Rank vendor id vendor name total bid percent of low bid | 1 of 7 | $1,756,520 | Low, 0.0% under the second |
| 15 AUG 2025 | 250815-F05 | St. Louis | JSLM0063 - ROUTE 50 - ST LOUIS COUNTY | 4 of 4 | $348,077 | +120% |
| 16 MAY 2025 | 250516-F14 | St. Louis | JSLM0057 - ROUTE I-44 - FRANKLIN COUNTY | 4 of 5 | $1,990,578 | +12% |
| 15 NOV 2024 | 241115-F03 | St. Louis | J6S3283-ROUTE 21-ST LOUIS COUNTY | 6 of 6 | $25,892,982 | +18% |
| 17 MAY 2024 | 240517-F01 | St. Louis | J6I2339 - ROUTE I-170 - ST LOUIS COUNTY | 6 of 6 | $237,084 | +39% |
| 17 MAY 2024 | 240517-F04 | St. Louis | J6P3454-VARIOUS ROUTES-FRANKLIN, ST LOUIS, ST CHARLES, JEFFERSON, ST LOUIS CITY | 1 of 2 | $6,080,000 | Low, 2.0% under the second |
| 19 APR 2024 | 240419-D02 | Central | J5I3586 - ROUTE I-44 - CRAWFORD, LACLEDE, PHELPS, PULASKI COUNTIES | 2 of 2 | $562,500 | +79% |
| 19 APR 2024 | 240419-F05 | St. Louis | J6S3599 - ROUTE N - ST. LOUIS COUNTY | 4 of 5 | $7,358,436 | +20% |
| 15 MAR 2024 | 240315-B01 | Northeast | J2P3395 - ROUTE 79,D,W - LINCOLN, PIKE | 3 of 5 | $508,696 | +32% |
| 21 APR 2023 | 230421-D01 | Central | J5I3587 - ROUTE I-40 - COOPER, BOONE, CALLAWAY COUNTIES | 2 of 2 | $1,140,000 | +73% |
| 15 APR 2022 | 220415-D03 | Central | J5I3582-ROUTE I-44-VARIOUS COUNTIES | 2 of 2 | $521,239 | +98% |
| 15 APR 2022 | 220415-D04 | Central | J5I3583-ROUTE I-70-VARIOUS COUNTIES | 1 of 1 | $248,839 | Low |
| 16 APR 2021 | 210416-D03 | Central | J0I3007Z - ROUTE 1-70 - VARIOUS COUNTIES | 1 of 1 | $409,397 | Low |
| 18 SEP 2020 | 200918-D01 | Central | J5I3423 - ROUTE I-70 - VARIOUS COUNTIES | 3 of 7 | $3,499,615 | +33% |
| 15 MAY 2020 | 200515-F05 | St. Louis | J6P3246 - ROUTE 50 - FRANKLIN COUNTY | 4 of 4 | $2,871,214 | +1.0% |
How this record was read
MoDOT letting tabulation PDFs (vendor ranking and bid tabulation), January 2020 to October 2026. About one bid in eight did not match its published total and is left out. Item codes from before mid 2021 are written in the current MoDOT format so one item groups across years.
- Every bid counted here matched its published total to within one dollar; MoDOT's rank decides who was low.
- The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
- A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.
A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.