Lamke Trenching & Excavating, Inc.: MoDOT bid record

Lamke Trenching & Excavating, Inc. submitted 26 bids on Missouri DOT contracts in the data, from 17 JAN 2020 to 16 OCT 2026, and was the low bidder on 5 of them (19%). When it was not low, its total sat a median +30% above the low bid.

Owner
Missouri DOT
Low bid volume
$12,614,576
Latest bid
16 OCT 2026
Data through
16 OCT 2026
26Bids
5Low bids
19Win rate, percent
+30%Median gap to the low bid when not low, 21 bids

By year

YearBidsLow bidsWin rate
2020300%
202111100%
20222150%
2023100%
20246117%
20255120%
20268113%
Lamke Trenching & Excavating, Inc., MoDOT: bids and low bids by year of letting

By district

DistrictBidsLow bidsWin rate
St. Louis17318%
Central7229%
Northeast100%
Southeast100%
Lamke Trenching & Excavating, Inc., MoDOT: bids and low bids by district

Pay items where it is most often lowest

Pay itemCodeUnitLines bidLowest on the lineIts median priceAll bidders' median
Turf type tall fescue sodding8031000ASY109 (90%)$14.50$13.00
Preformed thermoplastic pavement marking, 24 in. white6200015LF118 (73%)$18.00$23.50
Base, concrete9029100CY98 (89%)$2,600.00$2,100.00
Conduit, 3 in., trench with tracer wire9025300LF98 (89%)$18.00$25.00
Cable, 16 AWG 2 conductor9028308LF88 (100%)$1.25$1.77
Cable, 16 AWG 5 conductor9028310LF88 (100%)$1.65$2.15
Subgrade compaction (6 in. depth) (pavement repair)6131012SY107 (70%)$1.00$3.00
Conduit, 3 in., pushed with tracer wire9027300LF87 (88%)$30.00$37.50
Post, signal 8 FT.9022708EACH87 (88%)$1,255.00$1,451.16
Type A crashworthy end terminal (MASH)6063014EACH77 (100%)$3,800.00$3,300.00
MGS guardrail6061060LF77 (100%)$32.00$30.00
Preformed thermoplastic pavement marking, left/right arrow6200021EACH86 (75%)$280.00$300.00
Lamke Trenching & Excavating, Inc., MoDOT: pay items where its unit price was the lowest on the line

A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.

Who it meets most

FirmContracts in commonThat firm ranked ahead
R. V. Wagner, Inc.115 of 11
N.B. West Contracting Company107 of 10
Gershenson Construction Co., Inc.97 of 9
Pace Construction Company, LLC55 of 5
Above And Below Contracting, LLC41 of 4
Byrne & Jones Enterprises, Inc. dba Byrne & Jones Construction41 of 4
Iowa Civil Contracting, Inc.31 of 3
Diamond Surface, Inc.31 of 3
Emery Sapp & Sons, Inc.30 of 3
Raineri Construction, LLC dba Raineri Construction33 of 3
Lamke Trenching & Excavating, Inc., MoDOT: the firms on the same contracts most often

Latest bids

LetContractDistrictProjectRankIts bidAgainst the low bid
16 OCT 2026261016-F05St. LouisJSLM0077 - ROUTE 141 OR - JEFFERSON COUNTY5 of 5$586,823+48%
15 MAY 2026260515-F01St. LouisADA improvements, 2 MSE walls, and bridge rehabilitation2 of 3$9,092,886+15%
15 MAY 2026260515-F02St. LouisJSL0076B-ROUTE 340-ST LOUIS COUNTY1 of 3$4,119,820Low, 9.0% under the second
15 MAY 2026260515-F03St. LouisJSL0029-ROUTE 67-ST LOUIS COUNTY2 of 4$7,175,981+1.0%
17 APR 2026260417-D02CentralJCD0010 - ROUTE I-44 - LACLEDE, PULASKI, PHELPS, CRAWFORD COUNTIES3 of 3$3+72%
17 APR 2026260417-F04St. LouisJSL0099 - VARIOUS ROUTES - VARIOUS COUNTIES2 of 3$2+30%
17 APR 2026260417-F06St. LouisJSL0285 - ROUTE I-44 - ST. LOUIS CITY COUNTY2 of 3$387,667+13%
20 MAR 2026260320-F01St. LouisJ6P3510D - ROUTE 100 - ST. LOUIS COUNTY5 of 5$7,150,413+28%
17 OCT 2025251017-F02SoutheastJ6P3510C - VARIOUS ROUTES - VARIOUS COUNTIES2 of 5$7,717,590+4.0%
17 OCT 2025251017-F05St. LouisJ6S3578 - ROUTE 61/67 - ST LOUIS COUNTY4 of 5$10,359,930+9.0%
15 AUG 2025250815-F03St. LouisRank vendor id vendor name total bid percent of low bid1 of 7$1,756,520Low, 0.0% under the second
15 AUG 2025250815-F05St. LouisJSLM0063 - ROUTE 50 - ST LOUIS COUNTY4 of 4$348,077+120%
16 MAY 2025250516-F14St. LouisJSLM0057 - ROUTE I-44 - FRANKLIN COUNTY4 of 5$1,990,578+12%
15 NOV 2024241115-F03St. LouisJ6S3283-ROUTE 21-ST LOUIS COUNTY6 of 6$25,892,982+18%
17 MAY 2024240517-F01St. LouisJ6I2339 - ROUTE I-170 - ST LOUIS COUNTY6 of 6$237,084+39%
17 MAY 2024240517-F04St. LouisJ6P3454-VARIOUS ROUTES-FRANKLIN, ST LOUIS, ST CHARLES, JEFFERSON, ST LOUIS CITY1 of 2$6,080,000Low, 2.0% under the second
19 APR 2024240419-D02CentralJ5I3586 - ROUTE I-44 - CRAWFORD, LACLEDE, PHELPS, PULASKI COUNTIES2 of 2$562,500+79%
19 APR 2024240419-F05St. LouisJ6S3599 - ROUTE N - ST. LOUIS COUNTY4 of 5$7,358,436+20%
15 MAR 2024240315-B01NortheastJ2P3395 - ROUTE 79,D,W - LINCOLN, PIKE3 of 5$508,696+32%
21 APR 2023230421-D01CentralJ5I3587 - ROUTE I-40 - COOPER, BOONE, CALLAWAY COUNTIES2 of 2$1,140,000+73%
15 APR 2022220415-D03CentralJ5I3582-ROUTE I-44-VARIOUS COUNTIES2 of 2$521,239+98%
15 APR 2022220415-D04CentralJ5I3583-ROUTE I-70-VARIOUS COUNTIES1 of 1$248,839Low
16 APR 2021210416-D03CentralJ0I3007Z - ROUTE 1-70 - VARIOUS COUNTIES1 of 1$409,397Low
18 SEP 2020200918-D01CentralJ5I3423 - ROUTE I-70 - VARIOUS COUNTIES3 of 7$3,499,615+33%
15 MAY 2020200515-F05St. LouisJ6P3246 - ROUTE 50 - FRANKLIN COUNTY4 of 4$2,871,214+1.0%
Lamke Trenching & Excavating, Inc.: latest MoDOT bids in the data

How this record was read

MoDOT letting tabulation PDFs (vendor ranking and bid tabulation), January 2020 to October 2026. About one bid in eight did not match its published total and is left out. Item codes from before mid 2021 are written in the current MoDOT format so one item groups across years.

  • Every bid counted here matched its published total to within one dollar; MoDOT's rank decides who was low.
  • The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
  • A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.

A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy