MoDOT contract 260515-F03 bid tabulation
JSL0029-ROUTE 67-ST LOUIS COUNTY. Let by Missouri DOT on May 15, 2026, St Louis, St. Louis. 4 bids received; low bid $7,097,000 by N.B. West Contracting Company.
- Owner
- Missouri DOT
- Letting
- 15 MAY 2026
- Pay items
- 189
- Data through
- 16 OCT 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | N.B. West Contracting Company | $7,097,000 | Low |
| 2 | Lamke Trenching & Excavating, Inc. | $7,175,981 | +1.0% |
| 3 | Gershenson Construction Co., Inc. | $7,381,632 | +4.0% |
| 4 | Byrne & Jones Enterprises, Inc. dba Byrne & Jones Construction | $7,696,369 | +8.0% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. N.B. West Contracting Company | 2. Lamke Trenching & Excavating, Inc. | 3. Gershenson Construction Co., Inc. | 4. Byrne & Jones Enterprises, Inc. dba Byrne & Jones Construction |
|---|---|---|---|---|---|---|---|
| 0010 | Removal of improvements (2022010) | LS | 1 | $340,000 | $563,250 | $1,000,000 | $700,000 |
| 0020 | Embankment in place (2035500) | CY | 24 | $152.00 | $98.85 | $111.00 | $100.00 |
| 0030 | Class 3 excavation (2063000) | CY | 91 | $13.00 | $120.00 | $10.00 | $100.00 |
| 0040 | Misc.linear grading class 2, modified (2079909) | STA | 73.50 | $2,220.00 | $1,507.00 | $2,100.00 | $1,200.00 |
| 0050 | Misc.shaping slopes class III - modified requirement (2159910) | 100F | 1 | $2,400.00 | $2,400.00 | $2,400.00 | $2,400.00 |
| 0060 | Type 5 aggregate for base (4 in. thick) (3040504) | SY | 4,650 | $21.00 | $17.50 | $14.00 | $10.00 |
| 0070 | Type 5 aggregate for base (6 in. thick) (3040506) | SY | 185 | $34.00 | $28.50 | $16.00 | $15.00 |
| 0080 | Misc.bituminous approach transition (4019910) | TON | 10 | $900.00 | $1,150.00 | $390.00 | $300.00 |
| 0090 | Asphaltic concrete mixture PG 70-22 (SP125CLP mix) (4030109) | TON | 10,672.10 | $130.00 | $130.00 | $120.00 | $150.00 |
| 0100 | Tack coat - non-tracking (4071007) | GAL | 69,657 | $3.25 | $0.01 | $1.00 | $0.01 |
| 0110 | Concrete pavement (10 in. non-reinforced 15 FT. joints) (5021310) | SY | 151 | $208.00 | $194.50 | $250.00 | $160.00 |
| 0120 | Misc.8-inch reinforced concrete pavement (5029905) | SY | 96.30 | $258.00 | $166.00 | $236.00 | $150.00 |
| 0130 | Adjusting manhole (6042010) | EACH | 22 | $1,450.00 | $1,650.00 | $500.00 | $1,000.00 |
| 0140 | Pipe collar, type A (6044011) | EACH | 9 | $1,760.00 | $4,000.00 | $1,480.00 | $3,000.00 |
| 0150 | Pipe collar, type C (6044013) | EACH | 1 | $2,980.00 | $9,125.00 | $3,770.00 | $5,000.00 |
| 0160 | Misc.adjusting pull boxes (6049902) | EACH | 8 | $1,624.00 | $1,624.00 | $1,624.00 | $1,500.00 |
| 0170 | Misc.adjusting valves (6049902) | EACH | 59 | $145.00 | $850.00 | $25.00 | $200.00 |
| 0180 | Misc.concrete manhole apron (6049902) | EACH | 12 | $1,670.00 | $3,980.00 | $2,380.00 | $3,000.00 |
| 0190 | Misc.inlet cleanout (6049902) | EACH | 5 | $748.00 | $4,580.00 | $1,800.00 | $3,000.00 |
| 0200 | Concrete median (6081000) | SY | 521.60 | $214.00 | $132.00 | $148.00 | $150.00 |
| 0210 | Truncated domes (6081012) | SF | 609 | $20.00 | $30.00 | $28.00 | $50.00 |
| 0220 | Sidewalk hand-railing with balusters (6084024) | LF | 483 | $285.00 | $285.00 | $285.00 | $285.00 |
| 0230 | Paved approach, 8 in. (6085008) | SY | 1,824.80 | $226.00 | $162.20 | $116.00 | $150.00 |
| 0240 | Concrete sidewalk, 4 in. (6086004) | SY | 2,130.50 | $125.00 | $80.50 | $58.00 | $95.00 |
| 0250 | Concrete sidewalk, 7 in. (6086007) | SY | 250.70 | $132.00 | $144.00 | $110.00 | $160.00 |
| 0260 | Concrete sidewalk, 8 in. (6086008) | SY | 284 | $127.00 | $166.00 | $81.00 | $165.00 |
| 0270 | Misc.ADA curb ramp (6089902) | EACH | 84 | $3,630.00 | $5,075.00 | $3,600.00 | $3,500.00 |
| 0280 | Concrete curb (6 in. height and under) type S (6091010) | LF | 485 | $75.00 | $76.25 | $60.00 | $45.00 |
| 0290 | Curb and gutter type bcurb (6091052) | LF | 953 | $76.00 | $59.00 | $57.00 | $45.00 |
| 0300 | Paved ditch (6091060) | SY | 50.60 | $200.00 | $192.00 | $232.00 | $300.00 |
| 0310 | Integral curb type M (6092013) | LF | 491 | $88.00 | $67.30 | $32.00 | $45.00 |
| 0320 | Integral curb (over 6 in. height) type B (6092022) | LF | 96 | $69.00 | $103.60 | $62.00 | $75.00 |
| 0330 | Furnishing type 2 rock ditch liner (6096020) | CY | 19 | $69.00 | $113.20 | $75.00 | $100.00 |
| 0340 | Placing type 2 rock ditch liner (6096042) | CY | 19 | $66.00 | $192.00 | $75.00 | $200.00 |
| 0350 | Misc.modified type M curb (6099903) | LF | 47 | $91.00 | $105.90 | $118.00 | $250.00 |
| 0360 | Misc.variable height curb (6099903) | LF | 670 | $100.00 | $59.50 | $93.00 | $45.00 |
| 0370 | Impact attenuator 40 MPH (sand barrel array) (6122008) | EACH | 4 | $2,425.10 | $2,425.00 | $2,425.00 | $2,425.00 |
| 0380 | Replacement sand barrel (6122020) | EACH | 10 | $495.10 | $495.00 | $495.00 | $495.00 |
| 0390 | Impact attenuator (relocation) (6122030) | EACH | 4 | $1,080.10 | $1,080.00 | $1,080.00 | $1,080.00 |
| 0400 | Furnishing and placing concrete material for full depth pavement repair (6131010) | SY | 215.10 | $366.00 | $335.00 | $250.00 | $200.00 |
| 0410 | Subgrade compaction (6 in. depth) (pavement repair) (6131012) | SY | 215 | $13.50 | $1.00 | $1.00 | $10.00 |
| 0420 | Type 1 or 5 aggregate for base (4 in. thick) (pavement repair) (6131013) | SY | 215 | $18.00 | $1.00 | $10.00 | $10.00 |
| 0430 | Full depth pavement repair saw cut (for perimeter and internal saw cuts) (6131014) | LF | 45 | $20.00 | $20.00 | $10.00 | $5.00 |
| 0440 | Dowel bar (drilling, furnishing and installation) for full depth pavement repair (6131015) | EACH | 60 | $37.00 | $15.00 | $12.00 | $20.00 |
| 0450 | Tie bar (drilling, furnishing and installation) for full depth pavement repair (type L joints) (6131018) | EACH | 20 | $56.00 | $3.00 | $12.00 | $50.00 |
| 0460 | Furnishing and placing concrete material for class A partial depth pavement repair (6132018) | CY | 8.70 | $366.00 | $809.00 | $400.00 | $1,000.00 |
| 0470 | Grate and bearing plate (5 FT. X 3 FT. or 1524 MM X 914 MM) (6141024) | EACH | 2 | $755.00 | $5,306.00 | $3,440.00 | $1,000.00 |
| 0480 | Curved vane grate and frame (2 FT. X 2 FT. or 600MM X 600MM) (6141120) | EACH | 4 | $664.00 | $1,750.00 | $1,875.00 | $1,500.00 |
| 0490 | Manhole frame and cover, type 2 (6143012) | EACH | 1 | $483.00 | $1,700.00 | $665.00 | $1,200.00 |
| 0500 | Manhole frame and cover, type 3 (6143013) | EACH | 2 | $544.00 | $2,190.00 | $388.00 | $1,000.00 |
| 0510 | Manhole frame and cover, type 4 (6143014) | EACH | 2 | $544.00 | $1,690.00 | $550.00 | $1,200.00 |
| 0520 | Misc.special 6' X 2' curved vane grate (6149902) | EACH | 6 | $1,810.00 | $13,030 | $5,315.00 | $2,500.00 |
| 0530 | Tubular marker (6161070) | EACH | 96 | $65.00 | $65.00 | $65.00 | $150.00 |
| 0540 | Changeable message sign without communication interface, contractor furnished retained (6161098A) | EACH | 4 | $2,500.00 | $2,500.00 | $2,500.00 | $2,500.00 |
| 0550 | Misc.lump sum temporary traffic control (6169901) | LS | 1 | $96,296 | $39,896 | $82,000 | $39,896 |
| 0560 | Concrete traffic barrier, type C (6173000) | LF | 36 | $416.00 | $686.00 | $285.00 | $500.00 |
| 0570 | Temporary traffic barrier, contractor furnished retained (6173600D) | LF | 625 | $31.00 | $31.00 | $31.00 | $31.00 |
| 0580 | Relocating temporary traffic barrier (6175010A) | LF | 625 | $12.80 | $12.80 | $12.80 | $12.80 |
| 0590 | Misc.type B concrete traffic barrier height transition (6179903) | LF | 20 | $353.00 | $338.75 | $400.00 | $500.00 |
| 0600 | Mobilization (6181000) | LS | 1 | $499,729 | $455,000 | $720,000 | $935,000 |
| 0610 | Preformed thermoplastic pavement marking, 6 in. white (6200009) | LF | 12,592 | $5.00 | $5.00 | $5.00 | $4.75 |
| 0620 | Preformed thermoplastic pavement marking, 24 in. white (6200015) | LF | 2,076 | $18.00 | $18.00 | $18.00 | $17.00 |
| 0630 | Preformed thermoplastic pavement marking, 24 in. yellow (6200018) | LF | 253 | $18.00 | $18.00 | $18.00 | $17.00 |
| 0640 | Preformed thermoplastic pavement marking, left/right arrow (6200021) | EACH | 46 | $300.00 | $300.00 | $300.00 | $225.00 |
| 0650 | Preformed thermoplastic pavement marking, straight arrow (6200024) | EACH | 30 | $250.00 | $250.00 | $250.00 | $200.00 |
| 0660 | Preformed thermoplastic pavement marking, combination STR/LT/RT (6200027) | EACH | 14 | $500.00 | $500.00 | $500.00 | $300.00 |
| 0670 | Preformed thermoplastic pavement marking, word (only) (6200030) | EACH | 10 | $500.00 | $500.00 | $500.00 | $325.00 |
| 0680 | Preformed thermoplastic pavement marking, 24 in. X 36 in., yield line triangle (6200042A) | EACH | 12 | $85.00 | $85.00 | $85.00 | $75.00 |
| 0690 | Preformed thermoplastic pavement marking, lane reduction arrow (6200054) | EACH | 4 | $1,500.00 | $1,500.00 | $1,500.00 | $1,200.00 |
| 0700 | Temporary removable marking tape 4 in., white (6205301B) | LF | 3,500 | $1.25 | $1.25 | $1.25 | $2.00 |
| 0710 | 4 in. yellow class 2 pavement marking paint (25-mil, type L beads) (6205901B) | LF | 17,566 | $0.23 | $0.23 | $0.23 | $0.18 |
| 0720 | 6 in. white class 2 pavement marking paint (25-mil, type L beads) (6205902B) | LF | 30,476 | $0.29 | $0.29 | $0.29 | $0.29 |
| 0730 | 6 in. yellow class 2 pavement marking paint (25-mil, type L beads) (6205903B) | LF | 4,901 | $1.00 | $1.00 | $1.00 | $0.29 |
| 0740 | 4 in. white class 1 pavement marking paint (18-mil, type P beads) (6206000D) | LF | 30,476 | $0.16 | $0.16 | $0.16 | $0.18 |
| 0750 | 4 in. yellow class 1 pavement marking paint (18-mil, type P beads) (6206001D) | LF | 22,466 | $0.16 | $0.16 | $0.16 | $0.18 |
| 0760 | Pavement marking removal (6207001) | LF | 3,500 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0770 | Pavement marking removal (symbols) (6207002) | EACH | 48 | $100.00 | $100.00 | $100.00 | $100.00 |
| 0780 | Temporary raised pavement marker (6208064A) | EACH | 34 | $100.00 | $3.00 | $50.00 | $1,000.00 |
| 0790 | Misc.temporary pavement marking paint (6209901) | LS | 1 | $5,000.00 | $5,000.00 | $100.00 | $40,000 |
| 0800 | Misc.18 in. white island tubular marker (6209902) | EACH | 57 | $75.00 | $75.00 | $75.00 | $125.00 |
| 0810 | Misc.curb reflector (6209902) | EACH | 373 | $20.00 | $20.00 | $20.00 | $18.00 |
| 0820 | Coldmilling bituminous pavement for removal of surfacing (3 in. thick or less) (6221001) | SY | 86,852 | $3.25 | $3.50 | $2.89 | $2.78 |
| 0830 | Misc.variable depth coldmilling (2 in. to 4 in.) (6229905) | SY | 4,705 | $6.00 | $7.50 | $5.49 | $4.68 |
| 0840 | Permanent erosion control geotextile (6240103A) | SY | 57 | $1.00 | $3.25 | $11.00 | $10.00 |
| 0850 | Contractor furnished surveying and staking (6274000) | LS | 1 | $20,000 | $10,000 | $70,000 | $50,000 |
| 0860 | Misc.4 FT. X 5.5 FT. drainage flume (7069902) | EACH | 1 | $1,770.00 | $3,000.00 | $7,420.00 | $5,000.00 |
| 0870 | Misc.8 FT. X 5.5 FT. drainage flume (7069902) | EACH | 4 | $1,770.00 | $2,675.00 | $8,675.00 | $6,000.00 |
| 0880 | 12 in. pipe group A (7261012) | LF | 6 | $187.00 | $690.00 | $111.00 | $500.00 |
| 0890 | 15 in. pipe group A (7261015) | LF | 36 | $77.00 | $420.00 | $226.00 | $500.00 |
| 0900 | 18 in. pipe group A (7261018) | LF | 15 | $130.00 | $739.00 | $285.00 | $500.00 |
| 0910 | 24 in. pipe group A (7261024) | LF | 24 | $135.00 | $546.00 | $238.00 | $500.00 |
| 0920 | Precast concrete manhole - 48 in. (7310048) | FT | 13 | $596.00 | $1,800.00 | $831.00 | $1,200.00 |
| 0930 | Precast concrete drop inlet 2 FT X 2 FT (7311022) | FT | 13 | $951.00 | $2,150.00 | $800.00 | $1,100.00 |
| 0940 | Precast concrete drop inlet 3 FT X 2 FT-6 in. (7311030) | FT | 5 | $1,150.00 | $1,866.00 | $776.00 | $1,100.00 |
| 0950 | Precast concrete drop inlet 5 FT X 3 FT (7311053) | FT | 12 | $1,340.00 | $2,850.00 | $1,110.00 | $1,600.00 |
| 0960 | Misc.atg(adjust to grade) type-T inlet top (7319902) | EACH | 41 | $768.00 | $2,040.00 | $4,430.00 | $2,000.00 |
| 0970 | Misc.replace inlet top to new grade (7319902) | EACH | 10 | $1,280.00 | $4,235.00 | $3,950.00 | $2,500.00 |
| 0980 | Turf type tall fescue sodding (8031000A) | SY | 940 | $15.00 | $15.00 | $15.00 | $25.00 |
| 0990 | Rock ditch check (8061005) | LF | 110 | $13.00 | $13.00 | $50.00 | $100.00 |
| 1000 | Alternate ditch check (8061006) | LF | 10 | $13.00 | $13.00 | $15.00 | $200.00 |
| 1010 | Curb inlet check (8061007A) | EACH | 91 | $125.00 | $125.00 | $25.00 | $150.00 |
| 1020 | Sediment removal (8061016) | CY | 154 | $62.20 | $40.00 | $1.00 | $500.00 |
| 1030 | Silt fence (8061019) | LF | 5,117 | $2.85 | $2.85 | $0.01 | $5.00 |
| 1040 | MGS bridge approach transition section (regular/no curb) (6061069) | EACH | 1 | $4,800.00 | $4,800.00 | $4,800.00 | $4,800.00 |
| 1050 | Type A crashworthy end terminal (MASH) (6063014) | EACH | 1 | $4,200.00 | $4,200.00 | $4,200.00 | $4,200.00 |
| 1060 | Conduit, 4 in. rigid, in trench (9013004) | LF | 38 | $19.00 | $19.00 | $19.00 | $19.00 |
| 1070 | Conduit, 3 in. rigid, pushed (9014003) | LF | 994 | $42.50 | $42.50 | $42.50 | $42.50 |
| 1080 | Trenching type I (9015010) | LF | 544 | $6.00 | $6.00 | $6.00 | $6.00 |
| 1090 | Pull box, preformed class 1 (9016110) | EACH | 10 | $1,413.00 | $1,413.00 | $1,413.00 | $1,413.00 |
| 1100 | Pull box, preformed class 3 (9016112) | EACH | 3 | $2,968.00 | $2,968.00 | $2,968.00 | $2,968.00 |
| 1110 | Cable, 10 AWG 1 conductor, pole and bracket (9017110) | LF | 1,490 | $1.05 | $1.05 | $1.05 | $1.05 |
| 1120 | Cable-conduit, 1 in., 2 conductors and 1 bare neutral, 8 AWG (9017407) | LF | 1,830 | $8.80 | $8.80 | $8.80 | $8.80 |
| 1130 | Pole foundation (45 FT. or 13.5 M mounting height) (9018245) | EACH | 11 | $2,269.00 | $2,269.00 | $2,269.00 | $2,269.00 |
| 1140 | Misc.170W top mounted LED-B luminaire (9019902) | EACH | 9 | $559.00 | $559.00 | $559.00 | $559.00 |
| 1150 | Misc.275W top mounted LED-C luminaire (9019902) | EACH | 2 | $586.00 | $586.00 | $586.00 | $586.00 |
| 1160 | Misc.45 FT. top mount light pole (9019902) | EACH | 11 | $3,642.00 | $3,642.00 | $3,642.00 | $3,642.00 |
| 1170 | Signal head, type 3S (9020213) | EACH | 13 | $1,104.00 | $1,104.00 | $1,104.00 | $1,104.00 |
| 1180 | Signal head, type 33S (9020223) | EACH | 2 | $2,080.00 | $2,080.00 | $2,080.00 | $2,080.00 |
| 1190 | Signal head, type 3B (9020513) | EACH | 45 | $1,093.00 | $1,093.00 | $1,093.00 | $1,093.00 |
| 1200 | Signal head, type 4B (9020514) | EACH | 2 | $1,469.00 | $1,469.00 | $1,469.00 | $1,469.00 |
| 1210 | SH-flat sheet - signal sign (9020833) | SF | 230 | $48.50 | $48.50 | $48.50 | $48.50 |
| 1220 | Signal sign, mounting hardware (9020834) | EACH | 43 | $229.00 | $229.00 | $229.00 | $229.00 |
| 1230 | Post, signal 8 FT. (9022708) | EACH | 21 | $1,465.00 | $1,465.00 | $1,465.00 | $1,465.00 |
| 1240 | Post, signal 15 FT. (9022715) | EACH | 2 | $2,090.00 | $2,090.00 | $2,090.00 | $2,090.00 |
| 1250 | Post, type C, 15 FT. arm or 4.6 M arm (9023215) | EACH | 2 | $9,124.00 | $9,124.00 | $9,124.00 | $9,124.00 |
| 1260 | Post, type C, 20 FT. arm or 6.1 M arm (9023220) | EACH | 2 | $9,206.00 | $9,206.00 | $9,206.00 | $9,206.00 |
| 1270 | Post, type C, 25 FT. arm or 7.6 M arm (9023225) | EACH | 1 | $10,521 | $10,521 | $10,521 | $10,521 |
| 1280 | Post, type C, 30 FT. arm or 9.1 M arm (9023230) | EACH | 1 | $12,021 | $12,012 | $12,012 | $12,012 |
| 1290 | Post, type C, 35 FT. arm or 10.7 M arm (9023235) | EACH | 2 | $12,441 | $12,441 | $12,441 | $12,441 |
| 1300 | Post, type C, 40 FT. arm or 12.2 M arm (9023240) | EACH | 1 | $13,709 | $13,709 | $13,709 | $13,709 |
| 1310 | Post, type C, 45 FT. arm or 13.7 M arm (9023245) | EACH | 1 | $14,087 | $14,087 | $14,087 | $14,087 |
| 1320 | Post, type C, 50 FT. arm or 15.2 M arm (9023250) | EACH | 1 | $14,307 | $14,307 | $14,307 | $14,307 |
| 1330 | Post, type C, 55 FT. arm (9023255) | EACH | 2 | $16,339 | $16,339 | $16,339 | $16,339 |
| 1340 | Post, type B, longest arm 40 FT. or 12.2 M (9023340) | EACH | 2 | $21,392 | $21,392 | $21,392 | $21,392 |
| 1350 | Controller assembly housing, NEMA TS2 controller (9024283) | EACH | 4 | $2,365.00 | $2,365.00 | $2,365.00 | $2,365.00 |
| 1360 | Conduit, 2 in., trench with tracer wire (9025200) | LF | 49 | $14.50 | $14.50 | $14.50 | $14.50 |
| 1370 | Conduit, 3 in., trench with tracer wire (9025300) | LF | 688 | $19.00 | $19.00 | $19.00 | $19.00 |
| 1380 | Conduit, 3 in., median with tracer wire (9026300) | LF | 153 | $19.00 | $19.00 | $19.00 | $19.00 |
| 1390 | Conduit, 2 in., pushed with tracer wire (9027200) | LF | 337 | $37.25 | $37.25 | $37.25 | $37.25 |
| 1400 | Conduit, 3 in., pushed with tracer wire (9027300) | LF | 1,906 | $42.50 | $42.50 | $42.50 | $42.50 |
| 1410 | Cable, 8 AWG 1 conductor, power (9028208) | LF | 1,320 | $1.70 | $1.70 | $1.70 | $1.70 |
| 1420 | Cable, 16 AWG 2 conductor (9028308) | LF | 5,550 | $1.10 | $1.10 | $1.10 | $1.10 |
| 1430 | Cable, 16 AWG 5 conductor (9028310) | LF | 5,890 | $1.80 | $1.80 | $1.80 | $1.80 |
| 1440 | Cable, 16 AWG 7 conductor (9028311) | LF | 13,370 | $2.10 | $2.10 | $2.10 | $2.10 |
| 1450 | Pull box, preformed class 1 (9028810) | EACH | 1 | $1,684.00 | $1,684.00 | $1,684.00 | $1,684.00 |
| 1460 | Pull box, preformed class 2 (9028811) | EACH | 21 | $2,119.00 | $2,119.00 | $2,119.00 | $2,119.00 |
| 1470 | Pull box, preformed class 3 (9028812) | EACH | 11 | $3,238.00 | $3,238.00 | $3,238.00 | $3,238.00 |
| 1480 | Base, concrete (9029100) | CY | 57.70 | $2,666.00 | $2,666.00 | $2,666.00 | $2,666.00 |
| 1490 | Temporary traffic signals (9029400) | LS | 1 | $15,233 | $15,233 | $15,233 | $15,233 |
| 1500 | Misc.pot holing utility facilities (9029901) | LS | 1 | $1.00 | $1.00 | $1.00 | $1.00 |
| 1510 | Misc.traffic signal maintenance & programming (9029901) | LS | 1 | $15,100 | $15,100 | $15,100 | $15,100 |
| 1520 | Misc.atc traffic signal controller (9029902) | EACH | 6 | $5,453.00 | $5,453.00 | $5,453.00 | $5,453.00 |
| 1530 | Misc.audible pedestrian pushbutton and signing with verbal walk message (9029902) | EACH | 27 | $761.00 | $761.00 | $761.00 | $761.00 |
| 1540 | Misc.combination pad mounted 120V/240V signal power supply & lighting controller with uninterruptible power supply (9029902) | EACH | 5 | $25,120 | $25,120 | $25,120 | $25,120 |
| 1550 | Misc.countdown pedestrian signal head, type 1S (9029902) | EACH | 28 | $571.00 | $571.00 | $571.00 | $571.00 |
| 1560 | Misc.network connected signal monitor (9029902) | EACH | 4 | $1,943.00 | $1,943.00 | $1,943.00 | $1,943.00 |
| 1570 | Misc.pushbutton extensions (9029902) | EACH | 2 | $282.00 | $282.00 | $282.00 | $282.00 |
| 1580 | Misc.signal cabinet base wrap and cabinet shift (9029902) | EACH | 1 | $3,943.00 | $3,943.00 | $3,943.00 | $3,943.00 |
| 1590 | Misc.SL district traffic signal detection system (9029902) | EACH | 6 | $30,078 | $30,078 | $30,078 | $30,078 |
| 1600 | Misc.temporary generator for signal power (9029902) | EACH | 1 | $355.00 | $355.00 | $355.00 | $355.00 |
| 1610 | Concrete footings, embedded (9031010) | CY | 7.30 | $2,800.00 | $2,800.00 | $2,800.00 | $2,800.00 |
| 1620 | I-beam posts (9031210) | LB | 1,550 | $8.50 | $8.50 | $8.50 | $8.50 |
| 1630 | Pipe posts (9031220) | LB | 6,960 | $9.50 | $9.50 | $9.50 | $9.50 |
| 1640 | SH-flat sheet (9035004A) | SF | 610 | $38.00 | $38.00 | $38.00 | $38.00 |
| 1650 | ST-structural (9035011A) | SF | 459 | $42.00 | $42.00 | $42.00 | $42.00 |
| 1660 | SHF-flat sheet fluorescent (9035069A) | SF | 135 | $44.00 | $44.00 | $44.00 | $44.00 |
| 1670 | Misc.bridge-mounted sign bracket inspection, design, and installation (9039901) | LS | 1 | $0.10 | $20,000 | $1,000.00 | $30,000 |
| 1680 | Misc.remove and relocate existing ground mount sign (9039902) | EACH | 4 | $250.00 | $250.00 | $250.00 | $250.00 |
| 1690 | Pull box, preformed class 5 (9108816) | EACH | 7 | $2,881.00 | $2,881.00 | $2,881.00 | $2,881.00 |
| 1700 | Misc.ITS asset management tool (9109901) | LS | 1 | $2,158.00 | $2,158.00 | $2,158.00 | $2,158.00 |
| 1710 | Misc.removal of existing fiber optic cables (9109901) | LS | 1 | $1,892.00 | $1,892.00 | $1,892.00 | $1,892.00 |
| 1720 | Misc.adjust to grade ITS pull box (9109902) | EACH | 4 | $1,707.00 | $1,707.00 | $1,707.00 | $1,707.00 |
| 1730 | Misc.CCTV camera assembly (9109902) | EACH | 2 | $3,082.00 | $3,082.00 | $3,082.00 | $3,082.00 |
| 1740 | Misc.CCTV extension pole, 20 FT. metallic finish (9109902) | EACH | 2 | $2,702.00 | $2,702.00 | $2,702.00 | $2,702.00 |
| 1750 | Misc.fiber optic jumper, SM, furnish and install (9109902) | EACH | 18 | $47.50 | $47.50 | $47.50 | $47.50 |
| 1760 | Misc.fiber optic pigtail, SM, furnish and install (9109902) | EACH | 18 | $22.50 | $22.50 | $22.50 | $22.50 |
| 1770 | Misc.fiber optic splice enclosure (9109902) | EACH | 1 | $636.00 | $636.00 | $636.00 | $636.00 |
| 1780 | Misc.install CCTV camera assembly (9109902) | EACH | 2 | $1,419.00 | $1,419.00 | $1,419.00 | $1,419.00 |
| 1790 | Misc.install modot furnished IP-addressable power strip (9109902) | EACH | 4 | $473.00 | $473.00 | $473.00 | $473.00 |
| 1800 | Misc.intercept conduit with pull box (9109902) | EACH | 3 | $542.00 | $542.00 | $542.00 | $542.00 |
| 1810 | Misc.modot buried cable drivable delineator post (9109902) | EACH | 20 | $120.00 | $120.00 | $120.00 | $120.00 |
| 1820 | Misc.relocate existing communication equipment (9109902) | EACH | 4 | $473.00 | $473.00 | $473.00 | $473.00 |
| 1830 | Misc.remove in-pavement wireless detection system per intersection (9109902) | EACH | 2 | $355.00 | $355.00 | $355.00 | $355.00 |
| 1840 | Misc.SM fiber optic fusion splice (9109902) | EACH | 130 | $104.00 | $104.00 | $104.00 | $104.00 |
| 1850 | Misc.wall-mount fiber interconnect center, furnish and install (9109902) | EACH | 4 | $982.00 | $982.00 | $982.00 | $982.00 |
| 1860 | Misc.CCTV camera cable (9109903) | LF | 380 | $2.80 | $2.80 | $2.80 | $2.80 |
| 1870 | Misc.conduit, HDPE, pushed, 2 in. (9109903) | LF | 3,904 | $28.00 | $28.00 | $28.00 | $28.00 |
| 1880 | Misc.conduit, HDPE, trenched, 2 in. (9109903) | LF | 64 | $18.00 | $18.00 | $18.00 | $18.00 |
| 1890 | Misc.fiber optic cable, 24 strand single mode (9109903) | LF | 4,540 | $4.25 | $4.25 | $4.25 | $4.25 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from MoDOT's tabulation for this contract. MoDOT letting tabulation PDFs (vendor ranking and bid tabulation), January 2020 to October 2026. About one bid in eight did not match its published total and is left out. Item codes from before mid 2021 are written in the current MoDOT format so one item groups across years.
Every contract let that day: MoDOT letting of May 15, 2026. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.