Above And Below Contracting, LLC: MoDOT bid record
Above And Below Contracting, LLC submitted 63 bids on Missouri DOT contracts in the data, from 17 JAN 2020 to 18 SEP 2026, and was the low bidder on 7 of them (11%). When it was not low, its total sat a median +25% above the low bid.
- Owner
- Missouri DOT
- Low bid volume
- $25,199,884
- Latest bid
- 18 SEP 2026
- Data through
- 16 OCT 2026
By year
| Year | Bids | Low bids | Win rate |
|---|---|---|---|
| 2020 | 11 | 0 | 0% |
| 2021 | 3 | 0 | 0% |
| 2024 | 11 | 3 | 27% |
| 2025 | 21 | 1 | 5% |
| 2026 | 17 | 3 | 18% |
By district
| District | Bids | Low bids | Win rate |
|---|---|---|---|
| Southeast | 17 | 0 | 0% |
| St. Louis | 15 | 1 | 7% |
| Northwest | 14 | 5 | 36% |
| Northeast | 8 | 1 | 13% |
| Central | 6 | 0 | 0% |
| Southwest | 2 | 0 | 0% |
| Kansas City | 1 | 0 | 0% |
Pay items where it is most often lowest
| Pay item | Code | Unit | Lines bid | Lowest on the line | Its median price | All bidders' median |
|---|---|---|---|---|---|---|
| Bituminous pavement mixture PG58-28H (surface leveling) | 4020521 | TON | 43 | 21 (49%) | $100.54 | $100.00 |
| Modified coldmilling (depth transitions) | 6224010 | SY | 51 | 11 (22%) | $11.56 | $10.00 |
| Coldmilling bituminous pavement for removal of surfacing (3 in. thick or less) | 6221001 | SY | 36 | 11 (31%) | $5.36 | $4.00 |
| Tack coat | 4071005 | GAL | 56 | 10 (18%) | $3.45 | $2.90 |
| Gravel (A) or crushed stone (B) | 3105002 | TON | 51 | 9 (18%) | $60.71 | $55.00 |
| Misc.permanent aggregate edge treatment | 3049910 | TON | 53 | 5 (9%) | $52.46 | $48.76 |
| Silt fence | 8061019 | LF | 16 | 5 (31%) | $5.00 | $3.45 |
| Construction signs | 6161005 | SF | 30 | 4 (13%) | $7.90 | $7.00 |
| Preformed thermoplastic pavement marking, R/R crossing marker | 6200033 | EACH | 10 | 4 (40%) | $1,490.00 | $1,400.00 |
| Flashing arrow panel | 6161040 | EACH | 8 | 4 (50%) | $725.00 | $1,000.00 |
| 4 in. white standard waterborne pavement marking paint, type P beads | 6206000C | LF | 17 | 3 (18%) | $0.17 | $0.20 |
| Channelizer (trim line) | 6161025 | EACH | 9 | 3 (33%) | $20.00 | $18.00 |
A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.
Who it meets most
| Firm | Contracts in common | That firm ranked ahead |
|---|---|---|
| Emery Sapp & Sons, Inc. | 24 | 19 of 24 |
| Pace Construction Company, LLC | 13 | 13 of 13 |
| Capital Paving & Construction, LLC | 12 | 5 of 12 |
| Apex Paving Co. | 10 | 10 of 10 |
| N.B. West Contracting Company | 8 | 5 of 8 |
| W. L. Miller Company | 8 | 5 of 8 |
| Herzog Contracting Corp. | 8 | 5 of 8 |
| R. V. Wagner, Inc. | 7 | 3 of 7 |
| Magruder Paving, LLC | 7 | 7 of 7 |
| Gershenson Construction Co., Inc. | 6 | 2 of 6 |
Latest bids
| Let | Contract | District | Project | Rank | Its bid | Against the low bid |
|---|---|---|---|---|---|---|
| 18 SEP 2026 | 260918-B01 | Northeast | JNE0112 - ROUTE J - AUDRAIN COUNTY | 4 of 5 | $695,062 | +16% |
| 18 JUN 2026 | 260618-A02 | Northwest | JNWM0115 - VARIOUS ROUTES - VARIOUS COUNTIES | 1 of 3 | $5,194,746 | Low, 3.0% under the second |
| 18 JUN 2026 | 260618-A03 | Northwest | JNWM0116 - VARIOUS ROUTES - VARIOUS COUNTIES | 1 of 2 | $3,620,675 | Low, 9.0% under the second |
| 15 MAY 2026 | 260515-D06 | Central | JCD0338, JCD0339, JCD0341- ROUTE 119, 72, FF - DENT COUNTY | 4 of 5 | $424,977 | +150% |
| 15 MAY 2026 | 260515-F01 | St. Louis | ADA improvements, 2 MSE walls, and bridge rehabilitation | 3 of 3 | $12,859,023 | +63% |
| 15 MAY 2026 | 260515-H01 | Southwest | J6P3839 - ROUTE 84 - DUNKLIN COUNTY | 2 of 3 | $1,022,675 | +21% |
| 15 MAY 2026 | 260515-H04 | Southeast | J9S3779 - ROUTE U - BUTLER, STODDARD COUNTIES | 2 of 2 | $1,384,948 | +26% |
| 15 MAY 2026 | 260515-H05 | Southeast | J9S3871 - ROUTE W - BUTLER COUNTY | 2 of 3 | $972,572 | +18% |
| 15 MAY 2026 | 260515-H07 | Southeast | JSE0074, JSE0075, JSE0105 - ROUTES D, DD, J - PEMISCOT COUNTY | 2 of 3 | $4,339,876 | +19% |
| 15 MAY 2026 | 260515-H6A | Southeast | J9S3803, J9S3804, J9S3805 - ROUTE B, V, A - TEXAS, WRIGHT, SHANON COUNTIES | 3 of 3 | $6,141,404 | +38% |
| 15 MAY 2026 | 260515-H6B | Southeast | JSE0005 - ROUTE PP - WRIGHT COUNTY | 3 of 3 | $444,417 | +56% |
| 17 APR 2026 | 260417-F03 | St. Louis | JSL0097 - VARIOUS ROUTES - VARIOUS COUNTIES | 3 of 3 | $2 | +20% |
| 17 APR 2026 | 260417-F04 | St. Louis | JSL0099 - VARIOUS ROUTES - VARIOUS COUNTIES | 1 of 3 | $1 | Low, 30% under the second |
| 17 APR 2026 | 260417-F05 | St. Louis | JSLM0105 - ROUTE 30 - ST LOUIS, JEFFERSON COUNTIES | 3 of 7 | $1,327,845 | +38% |
| 16 JAN 2026 | 260116-A01 | Northwest | JNW0041, JNW0163 - ROUTE E, EE, 46 - ATCHISON, NODAWAY COUNTIES | 3 of 3 | $5,833,961 | +16% |
| 16 JAN 2026 | 260116-C04 | Kansas City | JKU0144 - ROUTE D - CASS COUNTY | 8 of 10 | $3,477,455 | +34% |
| 16 JAN 2026 | 260116-F07 | St. Louis | JSLM0071 - ROUTE 141, 21 - ST. LOUIS, JEFFERSON COUNTIES | 9 of 9 | $654,410 | +216% |
| 12 DEC 2025 | 251212-A01 | Northwest | J1S3442, JNW0043 - ROUTE 136 - MERCER, PUTNAM COUNTIES | 3 of 7 | $12,636,726 | +5.0% |
| 12 DEC 2025 | 251212-F01 | St. Louis | J6I3618-ROUTE I-270-ST LOUIS COUNTY | 2 of 5 | $759,177 | +16% |
| 14 NOV 2025 | 251114-A02 | Northwest | JNW0040 - ROUTE 5 - PUTNAM, SULLIVAN COUNTIES | 4 of 6 | $4,444,466 | +12% |
| 14 NOV 2025 | 251114-A06 | Northwest | JST0153 - ROUTE E,PP,W - SULLIVAN COUNTY | 2 of 6 | $2,601,058 | 0.0% |
| 14 NOV 2025 | 251114-D04 | Central | JCD0150, JCD0151, JCD0327 - ROUTE 89, 89 SPUR - OASGE, MARIES COUNTIES | 4 of 5 | $3,874,196 | +16% |
| 14 NOV 2025 | 251114-D06 | Central | JCD0249 - ROUTE 32 - TEXAS, DENT, IRON COUNTIES | 6 of 6 | $6,242,324 | +22% |
| 14 NOV 2025 | 251114-F03 | St. Louis | J6S3611 - ROUTE T - FRANKLIN, ST. LOUIS COUNTIES | 3 of 4 | $5,227,585 | +28% |
| 14 NOV 2025 | 251114-H06 | Southeast | JSE0057-ROUTE 34-BOLLINGER, CAPE GIRARDEAU COUNTY | 5 of 5 | $5,075,980 | +44% |
How this record was read
MoDOT letting tabulation PDFs (vendor ranking and bid tabulation), January 2020 to October 2026. About one bid in eight did not match its published total and is left out. Item codes from before mid 2021 are written in the current MoDOT format so one item groups across years.
- Every bid counted here matched its published total to within one dollar; MoDOT's rank decides who was low.
- The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
- A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.
A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.