MoDOT contract 251114-F03 bid tabulation
J6S3611 - ROUTE T - FRANKLIN, ST. LOUIS COUNTIES. Let by Missouri DOT on November 14, 2025, Franklin, St. Louis. 4 bids received; low bid $4,098,127 by N.B. West Contracting Company.
- Owner
- Missouri DOT
- Letting
- 14 NOV 2025
- Pay items
- 71
- Data through
- 16 OCT 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | N.B. West Contracting Company | $4,098,127 | Low |
| 2 | Pace Construction Company, LLC | $4,479,015 | +9.0% |
| 3 | Above And Below Contracting, LLC | $5,227,585 | +28% |
| 4 | Gershenson Construction Co., Inc. | $5,360,219 | +31% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. N.B. West Contracting Company | 2. Pace Construction Company, LLC | 3. Above And Below Contracting, LLC | 4. Gershenson Construction Co., Inc. |
|---|---|---|---|---|---|---|---|
| 0010 | Clearing and grubbing (2013000) | ACRE | 1 | $30,000 | $20,000 | $11,500 | $25,336 |
| 0020 | Removal of improvements (2022010) | LS | 1 | $115,000 | $90,998 | $100,625 | $101,602 |
| 0030 | Unclassified excavation (2035000) | CY | 2,005 | $60.00 | $60.00 | $15.16 | $73.04 |
| 0040 | Compacting embankment (2036000) | CY | 76 | $20.00 | $20.00 | $12.68 | $47.24 |
| 0050 | Furnishing rock fill (2142000) | CY | 2,534 | $32.50 | $32.50 | $62.95 | $54.78 |
| 0060 | Placing rock fill (2143000) | CY | 2,534 | $33.00 | $33.00 | $15.76 | $48.20 |
| 0070 | Misc.shaping slopes class III - modified material requirement (2159910) | 100F | 17 | $1,600.00 | $1,600.00 | $1,840.00 | $1,680.00 |
| 0080 | Type 5 aggregate for base (4 in. thick) (3040504) | SY | 23 | $30.00 | $30.00 | $22.56 | $33.08 |
| 0090 | Misc.rigid geogrid geotextile reinforcement (3049905) | SY | 1,301 | $3.00 | $3.00 | $3.73 | $8.20 |
| 0100 | Gravel (A) or crushed stone (B) (3105002) | TON | 237 | $95.00 | $110.00 | $38.04 | $129.00 |
| 0110 | Misc.bituminous pavement mixture PG58-28 (surface leveling) (4029910) | TON | 19,151 | $78.50 | $91.00 | $86.95 | $108.00 |
| 0120 | Tack coat (4071005) | GAL | 890 | $2.60 | $5.00 | $2.58 | $6.00 |
| 0130 | Misc.optional surface treatment (4139912) | GAL | 57,003 | $2.55 | $3.60 | $9.36 | $8.80 |
| 0140 | Pipe collar, type A (6044011) | EACH | 1 | $1,000.00 | $1,000.00 | $1,733.00 | $3,000.00 |
| 0150 | Truncated domes (6081012) | SF | 80 | $25.00 | $25.00 | $29.82 | $40.00 |
| 0160 | Concrete sidewalk, 4 in. (6086004) | SY | 22.80 | $220.00 | $220.00 | $66.16 | $226.52 |
| 0170 | Integral curb (6 in. height and under) type A (6092011) | LF | 4 | $20.00 | $20.00 | $334.68 | $100.00 |
| 0180 | Rock lining (6097000) | CY | 2 | $500.00 | $500.00 | $141.60 | $500.00 |
| 0190 | Work zone crash cushion (narrow) (6122040) | EACH | 2 | $4,700.00 | $4,700.00 | $6,900.00 | $6,300.00 |
| 0200 | Truck mounted attenuator (TMA) (6123001) | LS | 1 | $0.01 | $10,500 | $6,612.50 | $2,500.00 |
| 0210 | Furnishing and placing bituminous material for class C partial depth pavement repair (6133020) | TON | 2,987.40 | $120.00 | $61.50 | $126.71 | $112.93 |
| 0220 | Removal for class C partial depth pavement repair (6133021) | SY | 18,401 | $6.00 | $16.00 | $26.00 | $12.68 |
| 0230 | Changeable message sign without communication interface, contractor furnished retained (6161098A) | EACH | 4 | $2,600.00 | $2,600.00 | $3,220.00 | $2,940.00 |
| 0240 | Misc.lump sum temporary traffic control (6169901) | LS | 1 | $31,000 | $31,000 | $67,671 | $23,180 |
| 0250 | Temporary traffic barrier, contractor furnished retained (6173600D) | LF | 1,875 | $22.00 | $22.00 | $28.18 | $33.58 |
| 0260 | Mobilization (6181000) | LS | 1 | $385,000 | $475,663 | $378,664 | $402,398 |
| 0270 | Preformed thermoplastic pavement marking, 24 in. white (6200015) | LF | 197 | $25.00 | $25.00 | $20.70 | $18.90 |
| 0280 | Preformed thermoplastic pavement marking, left/right arrow (6200021) | EACH | 2 | $300.00 | $300.00 | $402.50 | $367.50 |
| 0290 | Preformed thermoplastic pavement marking, 24 in. X 36 in., yield line triangle (6200042A) | EACH | 15 | $75.00 | $75.00 | $86.25 | $78.75 |
| 0300 | 4 in. white class 1 pavement marking paint (18-mil, type P beads) (6206000D) | LF | 153,612 | $0.13 | $0.13 | $0.17 | $0.15 |
| 0310 | 4 in. yellow class 1 pavement marking paint (18-mil, type P beads) (6206001D) | LF | 157,861 | $0.13 | $0.13 | $0.17 | $0.15 |
| 0320 | Pavement marking removal (6207001) | LF | 2,825 | $2.00 | $2.00 | $2.30 | $2.10 |
| 0330 | 4 in temporary pavement marking paint (6208076) | LF | 1,000 | $2.00 | $2.00 | $3.45 | $3.15 |
| 0340 | Coldmilling bituminous pavement for removal of surfacing (3 in. thick or less) (6221001) | SY | 354 | $3.00 | $9.00 | $20.80 | $10.75 |
| 0350 | Modified coldmilling (depth transitions) (6224010) | SY | 14,513 | $7.00 | $8.00 | $9.96 | $10.75 |
| 0360 | Bituminous centerline rumble strip (6261001) | STA | 738.90 | $31.50 | $40.00 | $17.83 | $16.28 |
| 0370 | Misc.transverse rumble strips (6269903) | LF | 480 | $25.00 | $30.00 | $28.75 | $27.77 |
| 0380 | Contractor furnished surveying and staking (6274000) | LS | 1 | $17,000 | $100.00 | $11,500 | $8,000.00 |
| 0390 | 18 in. pipe group A (7261018) | LF | 9 | $285.00 | $285.00 | $87.23 | $150.00 |
| 0400 | 18 in. or allowed substitute group A flared end section (7320618A) | EACH | 1 | $1,500.00 | $1,500.00 | $1,103.76 | $2,000.00 |
| 0410 | Misc.seeding and mulching - cool season grasses. (8059901) | LS | 1 | $5,000.00 | $8,250.00 | $8,625.00 | $7,570.00 |
| 0420 | Sediment removal (8061016) | CY | 8 | $0.01 | $125.00 | $71.28 | $50.00 |
| 0430 | Silt fence (8061019) | LF | 795 | $12.00 | $3.80 | $4.60 | $5.78 |
| 0440 | Red maple (8080102) | EACH | 5 | $550.00 | $385.00 | $862.50 | $498.75 |
| 0450 | Red oak (8080109) | EACH | 5 | $550.00 | $385.00 | $862.50 | $498.75 |
| 0460 | Scarlet oak (8080110) | EACH | 5 | $550.00 | $385.00 | $862.50 | $498.75 |
| 0470 | Shingle oak (8080111) | EACH | 5 | $550.00 | $385.00 | $862.50 | $498.75 |
| 0480 | Pin oak (8080112) | EACH | 5 | $550.00 | $385.00 | $747.50 | $498.75 |
| 0490 | Black gum (8080119) | EACH | 5 | $550.00 | $385.00 | $948.75 | $498.75 |
| 0500 | Flowering dogwood (8080304) | EACH | 5 | $550.00 | $385.00 | $776.25 | $498.75 |
| 0510 | Red cedar (8080404) | EACH | 5 | $550.00 | $385.00 | $718.75 | $498.75 |
| 0520 | MGS guardrail (6061060) | LF | 2,050 | $32.00 | $32.00 | $36.80 | $33.60 |
| 0530 | MGS guardrail, 8 FT. posts, 6 FT. - 3 in. spacing (6061061) | LF | 3,750 | $34.00 | $34.00 | $39.10 | $35.70 |
| 0540 | MGS bridge approach transition section (regular/no curb) (6061069) | EACH | 8 | $4,200.00 | $4,200.00 | $4,830.00 | $4,410.00 |
| 0550 | MGS end anchor (6061080) | EACH | 3 | $1,800.00 | $1,800.00 | $2,070.00 | $1,890.00 |
| 0560 | Type A crashworthy end terminal (MASH) (6063014) | EACH | 19 | $3,800.00 | $3,800.00 | $4,370.00 | $3,990.00 |
| 0570 | Temporary traffic signals and lighting (9029401) | LS | 1 | $16,500 | $16,500 | $11,500 | $12,075 |
| 0580 | Misc.dynamic curve warning system (10 double-sided chevron signs) (9029902) | EACH | 2 | $59,547 | $59,547 | $86,250 | $62,524 |
| 0590 | Misc.rectangular rapid flashing beacon assembly - front & rear facing (2 sided) (9029902) | EACH | 1 | $7,667.00 | $7,667.00 | $30,579 | $8,050.35 |
| 0600 | Misc.rectangular rapid flashing beacon assembly - front facing only (1 sided) (9029902) | EACH | 1 | $7,895.00 | $7,895.00 | $25,300 | $8,289.75 |
| 0610 | Concrete footings, embedded (9031010) | CY | 0.50 | $4,000.00 | $4,000.00 | $4,600.00 | $4,200.00 |
| 0620 | Pipe posts (9031220) | LB | 620 | $10.00 | $10.00 | $11.50 | $10.50 |
| 0630 | 2 in. PSST post - 12 GA. (9031270A) | LF | 1,686 | $28.00 | $28.00 | $32.20 | $29.40 |
| 0640 | Driven post anchor for 2 in. PSST - 12 GA. (9031271A) | EACH | 71 | $325.00 | $325.00 | $373.75 | $341.25 |
| 0650 | 2.25 in. PSST post insert (6 FT.) - 12 GA. (9031272A) | EACH | 2 | $200.00 | $200.00 | $230.00 | $210.00 |
| 0660 | Concrete post anchor for 2 in. PSST. - 7 GA. (9031274) | EACH | 102 | $375.00 | $375.00 | $431.25 | $393.75 |
| 0670 | 2.5 in. PSST post - 12 GA. (9031280) | LF | 1,434 | $34.00 | $34.00 | $39.10 | $35.70 |
| 0680 | Driven post anchor for 2.5 in. PSST - 7 GA. (9031281A) | EACH | 45 | $375.00 | $375.00 | $431.25 | $393.75 |
| 0690 | Concrete post anchor for 2.5 in. PSST. - 7 GA. (9031285) | EACH | 58 | $425.00 | $425.00 | $488.75 | $446.25 |
| 0700 | SH-flat sheet (9035004A) | SF | 878 | $36.00 | $36.00 | $41.40 | $37.80 |
| 0710 | SHF-flat sheet fluorescent (9035069A) | SF | 1,583 | $38.00 | $38.00 | $43.70 | $39.90 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from MoDOT's tabulation for this contract. MoDOT letting tabulation PDFs (vendor ranking and bid tabulation), January 2020 to October 2026. About one bid in eight did not match its published total and is left out. Item codes from before mid 2021 are written in the current MoDOT format so one item groups across years.
Every contract let that day: MoDOT letting of November 14, 2025. Compiled by Mirage Metrics.