MoDOT contract 260918-B01 bid tabulation

JNE0112 - ROUTE J - AUDRAIN COUNTY. Let by Missouri DOT on September 18, 2026, Audrain, Northeast. 5 bids received; low bid $598,302 by W. L. Miller Company.

Owner
Missouri DOT
Letting
18 SEP 2026
Pay items
11
Data through
16 OCT 2026

Bidders

MoDOT contract 260918-B01: bids by rank

Bid tabulation

LinePay itemUnitQuantity1. W. L. Miller Company2. BMC Enterprises, Inc. dba Missouri Petroleum Products Company3. Blevins Asphalt Construction Company, Inc.4. Above And Below Contracting, LLC5. Vance Brothers, Inc.
0010Emulsified asphalt, seal coat (4091048)GAL73,610$3.15$2.55$2.91$3.49$3.21
0020Seal coat aggregate, grade A2 (4094002)SY262,893$1.00$1.35$0.91$1.08$1.34
0030Misc.lump sum traffic control (6169901)LS1$10,570$23,000$12,000$19,375$35,000
0040Mobilization (6181000)LS1$47,500$50,000$172,000$77,555$35,000
0050Plural component liquid pavement marking, 6 in. white (6200008)LF123$35.00$35.00$35.75$15.00$12.73
0060Plural component liquid pavement marking, 24 in. white (6200014)LF76$50.00$50.00$51.05$31.25$26.51
0070Plural component liquid pavement marking, left/right arrow (6200020)EACH1$500.00$500.00$511.00$250.00$212.09
0080Plural component liquid pavement marking, combination STR/LT/RT (6200026)EACH1$800.00$800.00$820.00$687.50$583.26
00904 in. white class 1 pavement marking paint (18-mil, type P beads) (6206000D)LF185,870$0.12$0.12$0.13$0.17$0.14
01004 in. yellow class 1 pavement marking paint (18-mil, type P beads) (6206001D)LF113,238$0.12$0.12$0.13$0.18$0.15
0110Pavement marking removal (6207001)LF34$5.00$5.00$5.15$5.00$4.24
MoDOT contract 260918-B01: unit prices by line

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from MoDOT's tabulation for this contract. MoDOT letting tabulation PDFs (vendor ranking and bid tabulation), January 2020 to October 2026. About one bid in eight did not match its published total and is left out. Item codes from before mid 2021 are written in the current MoDOT format so one item groups across years.

Every contract let that day: MoDOT letting of September 18, 2026. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy