Vance Brothers, Inc.: MoDOT bid record
Vance Brothers, Inc. submitted 73 bids on Missouri DOT contracts in the data, from 17 JAN 2020 to 16 OCT 2026, and was the low bidder on 32 of them (44%). When it was not low, its total sat a median +12% above the low bid.
- Owner
- Missouri DOT
- Low bid volume
- $52,595,293
- Latest bid
- 16 OCT 2026
- Data through
- 16 OCT 2026
By year
| Year | Bids | Low bids | Win rate |
|---|---|---|---|
| 2020 | 6 | 3 | 50% |
| 2021 | 12 | 4 | 33% |
| 2022 | 9 | 4 | 44% |
| 2023 | 7 | 3 | 43% |
| 2024 | 13 | 5 | 38% |
| 2025 | 16 | 10 | 63% |
| 2026 | 10 | 3 | 30% |
By district
| District | Bids | Low bids | Win rate |
|---|---|---|---|
| Central | 35 | 10 | 29% |
| Northwest | 18 | 16 | 89% |
| Southwest | 10 | 1 | 10% |
| Kansas City | 6 | 5 | 83% |
| Northeast | 4 | 0 | 0% |
Pay items where it is most often lowest
| Pay item | Code | Unit | Lines bid | Lowest on the line | Its median price | All bidders' median |
|---|---|---|---|---|---|---|
| Scrub seal | 4132000 | SY | 41 | 39 (95%) | $1.54 | $1.84 |
| Truck or trailer mounted attenuator (TMA) | 6123000A | EACH | 42 | 30 (71%) | $1,000.00 | $1,000.00 |
| Emulsified asphalt, seal coat | 4091048 | GAL | 101 | 26 (26%) | $2.59 | $2.75 |
| Channelizer (trim line) | 6161025 | EACH | 43 | 20 (47%) | $11.00 | $18.00 |
| 4 in. white standard waterborne pavement marking paint, type P beads | 6206000C | LF | 45 | 13 (29%) | $0.13 | $0.20 |
| Construction signs | 6161005 | SF | 56 | 12 (21%) | $7.00 | $7.00 |
| 4 in. yellow standard waterborne pavement marking paint, type P beads | 6206001C | LF | 31 | 8 (26%) | $0.13 | $0.25 |
| 4 in. white class 1 pavement marking paint (18-mil, type P beads) | 6206000D | LF | 20 | 8 (40%) | $0.14 | $0.21 |
| Changeable message sign without communication interface, contractor furnished retained | 6161098A | EACH | 17 | 8 (47%) | $1,650.00 | $2,800.00 |
| Flashing arrow panel | 6161040 | EACH | 16 | 8 (50%) | $775.00 | $1,000.00 |
| Bituminous fog seal | 4134000 | GAL | 8 | 8 (100%) | $4.00 | $3.44 |
| Preformed thermoplastic pavement marking, 24 in. white | 6200015 | LF | 36 | 7 (19%) | $27.75 | $23.50 |
A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.
Who it meets most
| Firm | Contracts in common | That firm ranked ahead |
|---|---|---|
| Blevins Asphalt Construction Company, Inc. | 45 | 36 of 45 |
| Missouri Petroleum Products Company, LLC | 34 | 9 of 34 |
| BMC Enterprises, Inc. dba Missouri Petroleum Products Company | 13 | 4 of 13 |
| N.B. West Contracting Company | 11 | 6 of 11 |
| W. L. Miller Company | 6 | 3 of 6 |
| Microsurfacing Contractors, LLC | 3 | 0 of 3 |
| Above And Below Contracting, LLC | 3 | 3 of 3 |
| Emery Sapp & Sons, Inc. | 2 | 0 of 2 |
| Fahrner Asphalt Sealers, LLC | 2 | 1 of 2 |
| Hutchens Construction Company, LLC | 1 | 1 of 1 |
Latest bids
| Let | Contract | District | Project | Rank | Its bid | Against the low bid |
|---|---|---|---|---|---|---|
| 16 OCT 2026 | 261016-B06 | Northeast | JNE0259 - ROUTE 94 - MONTGOMERY COUNTY | 4 of 4 | $438,183 | +34% |
| 16 OCT 2026 | 261016-D05 | Central | JCD0205 - ROUTE CC, M - MONITEAU, MILLER COUNTIES | 3 of 3 | $737,974 | +9.0% |
| 18 SEP 2026 | 260918-B01 | Northeast | JNE0112 - ROUTE J - AUDRAIN COUNTY | 5 of 5 | $706,092 | +18% |
| 18 JUN 2026 | 260618-A02 | Northwest | JNWM0115 - VARIOUS ROUTES - VARIOUS COUNTIES | 2 of 3 | $5,351,131 | +3.0% |
| 18 JUN 2026 | 260618-A03 | Northwest | JNWM0116 - VARIOUS ROUTES - VARIOUS COUNTIES | 2 of 2 | $3,962,356 | +9.0% |
| 18 JUN 2026 | 260618-C01 | Kansas City | JKRM0089 - ROUTE VARIOUS - CASS COUNTY | 1 of 1 | $1,379,796 | Low |
| 18 JUN 2026 | 260618-D02 | Central | JCDM0093-ROUTES HH, PP, K-CALLAWAY COUNTY | 1 of 3 | $758,497 | Low, 3.0% under the second |
| 18 JUN 2026 | 260618-D03 | Central | JCDM0094-ROUTES J,N,CC-GASCONADE, OSAGE COUNTIES | 2 of 3 | $931,622 | +4.0% |
| 18 JUN 2026 | 260618-D04 | Kansas City | JCDM0095 - ROUTE JJ, NN, BB - MORGAN, MONITEAU COUNTIES | 1 of 2 | $431,813 | Low, 60% under the second |
| 18 JUN 2026 | 260618-G01 | Southwest | JSRM0124 - VARIOUS ROUTES - BATES, BENTON, DALLAS COUNTIES | 2 of 2 | $3,445,738 | +35% |
| 14 NOV 2025 | 251114-G04 | Southwest | JSR0324 - VARIOUS ROUTES - VARIOUS COUNTIES | 2 of 2 | $4,501,073 | +43% |
| 14 NOV 2025 | 251114-G05 | Southwest | JSR0324B - ROUTE HH - VARIOUS | 2 of 2 | $1,883,770 | +10% |
| 17 OCT 2025 | 251017-A02 | Northwest | JNW0037 - ROUTES 6, 36, 69 - GRUNDY, LINN, DAVIESS COUNTIES | 1 of 1 | $2,596,177 | Low |
| 19 SEP 2025 | 250919-D06 | Central | JCD0147-ROUTE U-PULASKI, MILLER COUNTIES | 1 of 3 | $569,949 | Low, 1.0% under the second |
| 19 SEP 2025 | 250919-D08 | Central | JCD0153 - ROUTE B - GASCONADE, PHELPS COUNTIES | 2 of 3 | $776,366 | +4.0% |
| 19 SEP 2025 | 250919-D09 | Central | JCD0179-ROUTE J-MORGAN COUNTY | 2 of 3 | $282,510 | +4.0% |
| 19 SEP 2025 | 250919-D2A | Central | JCD0143, JCD0144-ROUTES O, UU- CALLAWAY COUNTY | 1 of 3 | $754,973 | Low, 8.0% under the second |
| 19 SEP 2025 | 250919-D2B | Central | JCD0145, JCD0146-ROUTES JJ, OR70-CALLAWAY | 1 of 3 | $459,852 | Low, 7.0% under the second |
| 15 AUG 2025 | 250815-D02 | Central | JCD0192 - ROUTE 135 - COOPER COUNTY | 2 of 3 | $884,821 | +13% |
| 15 AUG 2025 | 250815-D03 | Central | JCD0196, JCD0197 - ROUTES J,O,UU,OR 70,A - BOONE COUNTY | 3 of 3 | $1,250,085 | +26% |
| 20 JUN 2025 | 250620-A01 | Northwest | JNW0003 - ROUTE 36 - CALDWELL, DEKALB COUNTIES | 1 of 1 | $909,306 | Low |
| 20 JUN 2025 | 250620-A03 | Northwest | JNW0084 - ROUTES 11, 24 - CHARITON, CARROLL, LINN COUNTIES | 1 of 1 | $2,348,592 | Low |
| 20 JUN 2025 | 250620-A04 | Northwest | JNWM0090 - VARIOUS ROUTES - VARIOUS COUNTIES | 1 of 1 | $4,140,236 | Low |
| 20 JUN 2025 | 250620-A05 | Northwest | JNWM0091 - VARIOUS ROUTES - VARIOUS COUNTIES | 1 of 1 | $3,790,573 | Low |
| 20 JUN 2025 | 250620-C06 | Kansas City | JKU0390-VARIOUS ROUTES-VARIOUS COUNTIES | 1 of 1 | $1,980,900 | Low |
How this record was read
MoDOT letting tabulation PDFs (vendor ranking and bid tabulation), January 2020 to October 2026. About one bid in eight did not match its published total and is left out. Item codes from before mid 2021 are written in the current MoDOT format so one item groups across years.
- Every bid counted here matched its published total to within one dollar; MoDOT's rank decides who was low.
- The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
- A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.
A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.