MoDOT contract 250919-D2A bid tabulation
JCD0143, JCD0144-ROUTES O, UU- CALLAWAY COUNTY. Let by Missouri DOT on September 19, 2025, Callaway, Central. 3 bids received; low bid $754,973 by Vance Brothers, Inc..
- Owner
- Missouri DOT
- Letting
- 19 SEP 2025
- Pay items
- 18
- Data through
- 16 OCT 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Vance Brothers, Inc. | $754,973 | Low |
| 2 | BMC Enterprises, Inc. dba Missouri Petroleum Products Company | $813,148 | +8.0% |
| 3 | Blevins Asphalt Construction Company, Inc. | $820,660 | +9.0% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Vance Brothers, Inc. | 2. BMC Enterprises, Inc. dba Missouri Petroleum Products Company | 3. Blevins Asphalt Construction Company, Inc. |
|---|---|---|---|---|---|---|
| 0010 | Emulsified asphalt, seal coat (4091048) | GAL | 24,932 | $2.40 | $2.65 | $2.23 |
| 0020 | Misc.modified seal coat aggregate, grade B2 (4099905) | SY | 89,043 | $1.45 | $1.25 | $0.94 |
| 0030 | Construction signs (6161005) | SF | 749 | $7.10 | $7.50 | $6.85 |
| 0040 | Channelizer (trim-line) (6161025) | EACH | 110 | $14.00 | $1.00 | $5.30 |
| 0050 | Changeable message sign without communication interface, contractor furnished retained (6161098A) | EACH | 1 | $1,050.00 | $1,800.00 | $1,275.00 |
| 0060 | Mobilization (6181000) | LS | 1 | $3,200.00 | $48,000 | $88,272 |
| 0070 | 4 in. white class 1 pavement marking paint (18-mil, type P beads) (6206000D) | LF | 66,327 | $0.15 | $0.14 | $0.15 |
| 0080 | 4 in. yellow class 1 pavement marking paint (18-mil, type P beads) (6206001D) | LF | 59,111 | $0.16 | $0.13 | $0.16 |
| 0090 | Emulsified asphalt, seal coat (4091048) | GAL | 62,765 | $2.40 | $2.65 | $2.23 |
| 0100 | Misc.modified seal coat aggregate, grade B2 (4099905) | SY | 224,161 | $1.45 | $1.25 | $0.98 |
| 0110 | Construction signs (6161005) | SF | 1,071 | $7.10 | $7.50 | $6.85 |
| 0120 | Channelizer (trim-line) (6161025) | EACH | 110 | $14.00 | $1.00 | $5.30 |
| 0130 | Changeable message sign without communication interface, contractor furnished retained (6161098A) | EACH | 2 | $1,650.00 | $1,800.00 | $1,265.00 |
| 0140 | Mobilization (6181000) | LS | 1 | $3,000.00 | $60,000 | $152,250 |
| 0150 | Preformed thermoplastic pavement marking, 24 in. white (6200015) | LF | 30 | $33.00 | $50.00 | $31.55 |
| 0160 | 4 in. white class 1 pavement marking paint (18-mil, type P beads) (6206000D) | LF | 161,589 | $0.13 | $0.14 | $0.13 |
| 0170 | 4 in. yellow class 1 pavement marking paint (18-mil, type P beads) (6206001D) | LF | 149,105 | $0.15 | $0.13 | $0.15 |
| 0180 | Pavement marking removal (6207001) | LF | 30 | $1.10 | $50.00 | $1.05 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from MoDOT's tabulation for this contract. MoDOT letting tabulation PDFs (vendor ranking and bid tabulation), January 2020 to October 2026. About one bid in eight did not match its published total and is left out. Item codes from before mid 2021 are written in the current MoDOT format so one item groups across years.
Every contract let that day: MoDOT letting of September 19, 2025. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.