MoDOT contract 251114-D04 bid tabulation

JCD0150, JCD0151, JCD0327 - ROUTE 89, 89 SPUR - OASGE, MARIES COUNTIES. Let by Missouri DOT on November 14, 2025, Osage, Central. 5 bids received; low bid $3,333,000 by Pace Construction Company, LLC.

Owner
Missouri DOT
Letting
14 NOV 2025
Pay items
45
Data through
16 OCT 2026

Bidders

RankBidderTotal bidAgainst the low bid
1Pace Construction Company, LLC$3,333,000Low
2Emery Sapp & Sons, Inc.$3,588,156+8.0%
3Magruder Paving, LLC$3,704,565+11%
4Above And Below Contracting, LLC$3,874,196+16%
5Capital Paving & Construction, LLC$4,109,317+23%
MoDOT contract 251114-D04: bids by rank

Bid tabulation

LinePay itemUnitQuantity1. Pace Construction Company, LLC2. Emery Sapp & Sons, Inc.3. Magruder Paving, LLC4. Above And Below Contracting, LLC5. Capital Paving & Construction, LLC
0010Removal of improvements (2022010)LS1$10,684$3,645.00$3,389.17$7,150.00$3,389.17
0020Shaping slopes, class III (2153000)100F9$1,481.05$1,600.00$1,481.05$1,595.00$1,481.05
0030Gravel (A) or crushed stone (B) (3105002)TON690$16.00$88.00$90.43$50.96$31.12
0040Bituminous pavement mixture PG64-22 (surface leveling) (4020520)TON15,848.30$72.00$75.65$80.59$83.43$90.13
0050Misc.high tensile strength synthetic fiber bituminous pavement (surface level) (PG64-22) (4029910)TON1,002.70$100.00$102.00$90.97$111.51$118.83
0060Misc.replacement of damaged pavement (4029910)TON41.40$95.00$88.00$296.94$116.50$507.50
0070Tack coat (4071005)GAL19,144$2.55$2.50$3.40$2.61$2.50
0080Construction signs (6161005)SF1,741$7.70$7.75$6.00$7.15$6.50
0090Channelizer (trim-line) (6161025)EACH150$8.00$8.60$22.00$5.50$5.00
0100Changeable message sign without communication interface, contractor furnished retained (6161098A)EACH2$1,420.00$1,525.00$3,000.00$1,320.00$1,200.00
0110Mobilization (6181000)LS1$155,000$120,000$126,700$83,261$104,029
01204 in. white class 1 pavement marking paint (18-mil, type P beads) (6206000D)LF175,192$0.11$0.12$0.14$0.13$0.11
01304 in. yellow class 1 pavement marking paint (18-mil, type P beads) (6206001D)LF164,470$0.11$0.13$0.13$0.14$0.12
0140Coldmilling bituminous pavement for removal of surfacing (3 in. thick or less) (6221001)SY7,267$3.50$3.20$3.83$14.99$4.09
0150Modified coldmilling (depth transitions) (6224010)SY1,292$10.35$15.15$14.84$14.11$18.33
0160Misc.removal of damaged pavement (6229905)SY250$7.10$22.20$25.65$36.65$85.67
0170MGS guardrail, 8 FT. posts, 6 FT. - 3 in. spacing (6061061)LF2,325$30.62$32.95$30.62$33.00$30.62
0180Type A crashworthy end terminal (MASH) (6063014)EACH12$3,426.82$3,685.00$3,426.82$3,520.00$3,426.82
0190Gravel (A) or crushed stone (B) (3105002)TON710$15.50$86.00$79.90$65.84$30.57
0200Bituminous pavement mixture PG64-22 (surface leveling) (4020520)TON17,004.20$73.25$76.95$79.73$83.43$89.55
0210Misc.replacement of damaged pavement (4029910)TON41.40$95.00$88.00$296.94$116.50$581.77
0220Tack coat (4071005)GAL19,893$2.55$2.55$3.40$2.61$2.50
0230Adjusting manhole (6042010)EACH3$300.00$806.00$188.19$1,100.00$546.86
0240Construction signs (6161005)SF1,862$7.50$8.00$6.00$7.15$6.50
0250Channelizer (trim-line) (6161025)EACH150$8.00$8.60$22.00$5.50$5.00
0260Changeable message sign without communication interface, contractor furnished retained (6161098A)EACH2$1,200.00$1,290.00$3,000.00$1,320.00$1,200.00
0270Mobilization (6181000)LS1$104,000$125,000$67,345$77,789$163,421
0280Preformed thermoplastic pavement marking, 24 in. white (6200015)LF24$28.00$26.90$20.00$27.50$25.00
0290Preformed thermoplastic pavement marking, R/R crossing marker (6200033)EACH2$2,500.00$1,450.00$1,300.00$1,485.00$1,350.00
03004 in. white class 1 pavement marking paint (18-mil, type P beads) (6206000D)LF187,651$0.11$0.13$0.14$0.14$0.12
03104 in. yellow class 1 pavement marking paint (18-mil, type P beads) (6206001D)LF167,243$0.11$0.14$0.13$0.15$0.13
0320Coldmilling bituminous pavement for removal of surfacing (3 in. thick or less) (6221001)SY5,258$2.75$2.55$3.12$14.99$5.27
0330Modified coldmilling (depth transitions) (6224010)SY909$14.75$13.90$11.63$14.11$19.31
0340Misc.removal of damaged pavement (6229905)SY250$7.10$22.20$25.65$36.65$99.94
0350Gravel (A) or crushed stone (B) (3105002)TON65$20.00$111.50$95.64$50.96$163.84
0360Bituminous pavement mixture PG64-22 (surface leveling) (4020520)TON1,486.40$68.00$73.20$79.15$80.65$94.93
0370Misc.replacement of damaged pavement (4029910)TON8.30$98.00$102.50$296.94$122.24$432.35
0380Tack coat (4071005)GAL1,730$2.55$2.55$3.40$2.61$2.44
0390Construction signs (6161005)SF506$7.00$7.50$6.00$7.15$6.50
0400Channelizer (trim-line) (6161025)EACH100$6.00$6.45$20.00$5.50$5.00
0410Mobilization (6181000)LS1$12,000$20,000$12,100$12,096$17,095
04204 in. white class 1 pavement marking paint (18-mil, type P beads) (6206000D)LF17,435$0.17$0.13$0.15$0.14$0.12
04304 in. yellow class 1 pavement marking paint (18-mil, type P beads) (6206001D)LF15,891$0.17$0.14$0.14$0.15$0.13
0440Modified coldmilling (depth transitions) (6224010)SY70$47.75$30.20$11.63$14.11$84.56
0450Misc.removal of damaged pavement (6229905)SY50$7.10$37.00$25.65$36.65$63.29
MoDOT contract 251114-D04: unit prices by line

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from MoDOT's tabulation for this contract. MoDOT letting tabulation PDFs (vendor ranking and bid tabulation), January 2020 to October 2026. About one bid in eight did not match its published total and is left out. Item codes from before mid 2021 are written in the current MoDOT format so one item groups across years.

Every contract let that day: MoDOT letting of November 14, 2025. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy