MoDOT contract 260417-F06 bid tabulation

JSL0285 - ROUTE I-44 - ST. LOUIS CITY COUNTY. Let by Missouri DOT on April 17, 2026, St Louis City, St. Louis. 3 bids received; low bid $342,249 by R. V. Wagner, Inc..

Owner
Missouri DOT
Letting
17 APR 2026
Pay items
11
Data through
16 OCT 2026

Bidders

RankBidderTotal bidAgainst the low bid
1R. V. Wagner, Inc.$342,249Low
2Lamke Trenching & Excavating, Inc.$387,667+13%
3Diamond Surface, Inc.$782,156+129%
MoDOT contract 260417-F06: bids by rank

Bid tabulation

LinePay itemUnitQuantity1. R. V. Wagner, Inc.2. Lamke Trenching & Excavating, Inc.3. Diamond Surface, Inc.
0010Furnishing and placing concrete material for full depth pavement repair (6131010)SY266.70$322.00$425.00$1,195.00
0020Subgrade compaction (6 in. depth) (pavement repair) (6131012)SY267$7.00$1.00$10.00
0030Type 1 or 5 aggregate for base (4 in. thick) (pavement repair) (6131013)SY267$12.00$1.00$15.00
0040Full depth pavement repair saw cut (for perimeter and internal saw cuts) (6131014)LF2,400$5.60$6.00$10.00
0050Dowel bar (drilling, furnishing and installation) for full depth pavement repair (6131015)EACH400$17.00$5.00$12.50
0060Changeable message sign without communication interface, contractor furnished retained (6161098A)EACH2$2,400.00$2,200.00$2,750.00
0070Misc.temporary traffic control (6169901)LS1$43,500$10,236$45,000
0080Mobilization (6181000)LS1$21,000$100,000$165,115
00906 in. white class 2 pavement marking paint (25-mil, type L beads) (6205902B)LF6,311$0.95$0.80$1.00
01006 in. yellow class 2 pavement marking paint (25-mil, type L beads) (6205903B)LF3,513$0.95$0.80$1.00
0110Diamond grinding (concrete pavement) (6223010)SY13,489$11.30$10.00$15.00
MoDOT contract 260417-F06: unit prices by line

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from MoDOT's tabulation for this contract. MoDOT letting tabulation PDFs (vendor ranking and bid tabulation), January 2020 to October 2026. About one bid in eight did not match its published total and is left out. Item codes from before mid 2021 are written in the current MoDOT format so one item groups across years.

Every contract let that day: MoDOT letting of April 17, 2026. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy