MoDOT contract 251114-F02 bid tabulation
J6S3557 - ROUTE 67 - ST. LOUIS COUNTY. Let by Missouri DOT on November 14, 2025, St Louis, St. Louis. 4 bids received; low bid $13,515,221 by Gershenson Construction Co., Inc..
- Owner
- Missouri DOT
- Letting
- 14 NOV 2025
- Pay items
- 166
- Data through
- 16 OCT 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Gershenson Construction Co., Inc. | $13,515,221 | Low |
| 2 | Byrne & Jones Enterprises, Inc. dba Byrne & Jones Construction | $14,489,708 | +7.0% |
| 3 | Pace Construction Company, LLC | $14,644,444 | +8.0% |
| 4 | N.B. West Contracting Company | $14,750,000 | +9.0% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Gershenson Construction Co., Inc. | 2. Byrne & Jones Enterprises, Inc. dba Byrne & Jones Construction | 3. Pace Construction Company, LLC | 4. N.B. West Contracting Company |
|---|---|---|---|---|---|---|---|
| 0010 | Removal of improvements (2022010) | LS | 1 | $1,400,000 | $1,800,000 | $1,920,000 | $1,076,000 |
| 0020 | Class 3 excavation (2063000) | CY | 123 | $16.00 | $315.00 | $150.00 | $29.00 |
| 0030 | Culvert cleanout (2063500) | EACH | 116 | $250.00 | $1,127.32 | $1,800.00 | $2,155.00 |
| 0040 | Misc.modified linear grading class II (2079909) | STA | 190 | $2,100.00 | $2,500.00 | $111.00 | $3,289.00 |
| 0050 | Shaping slopes, class III (2153000) | 100F | 5 | $1,600.00 | $1,600.00 | $1,600.00 | $1,600.00 |
| 0060 | Type 5 aggregate for base (4 in. thick) (3040504) | SY | 21,172 | $15.15 | $12.00 | $21.50 | $17.50 |
| 0070 | Gravel (A) or crushed stone (B) (3105003) | SY | 19 | $54.50 | $500.00 | $56.75 | $121.00 |
| 0080 | Bituminous pavement mixture PG64-22, (BP-1) (4011209) | TON | 1,848 | $116.00 | $120.00 | $109.00 | $115.00 |
| 0090 | Misc.asphaltic concrete mixture PG 76-22 (SP125CLP mix), fiber reinforced (4039910) | TON | 16,129 | $129.00 | $120.00 | $123.00 | $155.00 |
| 0100 | Tack coat - non-tracking (4071007) | GAL | 16,481 | $1.00 | $4.50 | $3.75 | $3.05 |
| 0110 | Concrete pavement ( 8 in. non-reinf) (5021108) | SY | 302.70 | $128.00 | $150.00 | $225.00 | $228.00 |
| 0120 | Concrete pavement (9 in. non-reinforced 15 FT. joints) (5021309) | SY | 542.40 | $110.00 | $155.00 | $205.00 | $96.00 |
| 0130 | Concrete pavement (11 1/2 in. non-reinforced, 15 FT. joints) (5021335) | SY | 3,466.70 | $128.00 | $130.00 | $160.00 | $145.00 |
| 0140 | Adjusting basin or inlet (6042020) | EACH | 13 | $2,800.00 | $1,000.00 | $4,500.00 | $1,771.00 |
| 0150 | Pipe collar, type A (6044011) | EACH | 1 | $2,000.00 | $1,000.00 | $5,790.00 | $1,719.00 |
| 0160 | Misc.pullbox adjust to grade (6049902) | EACH | 3 | $915.00 | $915.00 | $915.00 | $915.00 |
| 0170 | Misc.sanitary manhole adjust to grade (6049902) | EACH | 9 | $805.00 | $500.00 | $1,440.00 | $2,850.00 |
| 0180 | Misc.storm manhole adjust to grade (6049902) | EACH | 12 | $805.00 | $500.00 | $1,250.00 | $3,162.00 |
| 0190 | Misc.utility concrete encasement (6049902) | EACH | 6 | $2,150.00 | $2,600.00 | $250.00 | $1,512.00 |
| 0200 | Truncated domes (6081012) | SF | 1,558 | $27.00 | $30.00 | $75.00 | $15.00 |
| 0210 | 6 in. concrete median strip (6083006) | SY | 565.20 | $175.00 | $145.00 | $100.00 | $73.00 |
| 0220 | Paved approach, 8 in. (6085008) | SY | 5,758.20 | $108.00 | $128.00 | $132.50 | $140.00 |
| 0230 | Concrete sidewalk, 4 in. (6086004) | SY | 10,320.20 | $56.00 | $48.00 | $55.00 | $68.00 |
| 0240 | Concrete sidewalk, 7 in. (6086007) | SY | 55.70 | $82.00 | $110.00 | $230.00 | $222.00 |
| 0250 | Misc.concrete curb ramp (6089902) | EACH | 160 | $2,700.00 | $3,200.00 | $6,375.00 | $4,200.00 |
| 0260 | Misc.island tubular marker (6089902) | EACH | 65 | $185.00 | $185.00 | $185.00 | $185.00 |
| 0270 | Misc.concrete sidewalk, 6 in. (6089905) | SY | 171.10 | $79.00 | $70.00 | $170.75 | $150.00 |
| 0280 | Concrete curb (6 in. height and under) type S (6091010) | LF | 3,414 | $52.00 | $28.00 | $42.00 | $60.00 |
| 0290 | Curb and gutter type B (6091052) | LF | 3,915 | $57.00 | $42.70 | $65.00 | $70.00 |
| 0300 | Integral curb (6 in. height and under) type A (6092011) | LF | 1,275 | $30.00 | $32.22 | $54.00 | $95.00 |
| 0310 | Concrete curb low profile type E (6092031) | LF | 38 | $60.00 | $45.00 | $181.00 | $144.00 |
| 0320 | Rock lining (6097000) | CY | 6 | $220.00 | $500.00 | $293.00 | $276.00 |
| 0330 | Misc.variable height curb (30 in. max. height) (6099903) | LF | 1,888 | $106.00 | $40.00 | $25.60 | $63.00 |
| 0340 | Impact attenuator 40 MPH (sand barrel array) (6122008) | EACH | 2 | $2,300.00 | $2,300.00 | $2,300.00 | $2,300.00 |
| 0350 | Replacement sand barrel (6122020) | EACH | 8 | $500.00 | $500.00 | $500.00 | $500.00 |
| 0360 | Impact attenuator (relocation) (6122030) | EACH | 8 | $1,000.00 | $1,000.00 | $1,000.00 | $1,000.00 |
| 0370 | Truck mounted attenuator (TMA) (6123001) | LS | 1 | $5,000.00 | $18,000 | $80,000 | $17,280 |
| 0380 | Furnishing and placing concrete material for full depth pavement repair (6131010) | SY | 891 | $365.00 | $350.00 | $362.00 | $430.00 |
| 0390 | Subgrade compaction (6 in. depth) (pavement repair) (6131012) | SY | 891 | $1.00 | $10.00 | $10.00 | $1.00 |
| 0400 | Type 1 or 5 aggregate for base (4 in. thick) (pavement repair) (6131013) | SY | 891 | $1.00 | $20.00 | $10.00 | $1.00 |
| 0410 | Full depth pavement repair saw cut (for perimeter and internal saw cuts) (6131014) | LF | 1,613 | $10.00 | $10.00 | $10.00 | $14.00 |
| 0420 | Dowel bar (drilling, furnishing and installation) for full depth pavement repair (6131015) | EACH | 1,070 | $1.00 | $10.00 | $10.00 | $23.00 |
| 0430 | Curved vane grate and frame (2 FT. X 2 FT. or 600MM X 600MM) (6141120) | EACH | 1 | $1,580.00 | $1,200.00 | $2,600.00 | $533.00 |
| 0440 | Curved vane grate and frame (4 FT. X 2 FT. or 1200MM X 600MM) (6141121) | EACH | 2 | $2,075.00 | $1,850.00 | $4,260.00 | $1,040.00 |
| 0450 | Manhole frame and cover, type 4 (6143014) | EACH | 2 | $500.00 | $1,100.00 | $420.00 | $522.00 |
| 0460 | Changeable message sign without communication interface, contractor furnished retained (6161098A) | EACH | 2 | $2,800.00 | $2,800.00 | $2,800.00 | $2,800.00 |
| 0470 | Misc.temporary traffic control (6169901) | LS | 1 | $35,000 | $100,000 | $26,954 | $26,954 |
| 0480 | Concrete traffic barrier, type A (6171000) | LF | 213 | $237.00 | $250.00 | $221.75 | $328.00 |
| 0490 | Concrete traffic barrier, type C (6173000) | LF | 4,078 | $159.00 | $150.00 | $148.25 | $193.00 |
| 0500 | Concrete traffic barrier, type D (6173100) | LF | 49 | $350.00 | $500.00 | $410.75 | $362.00 |
| 0510 | Temporary traffic barrier, contractor furnished retained (6173600D) | LF | 4,912 | $24.00 | $24.00 | $24.00 | $24.00 |
| 0520 | Relocating temporary traffic barrier (6175010A) | LF | 5,380 | $2.00 | $11.00 | $11.00 | $11.00 |
| 0530 | Mobilization (6181000) | LS | 1 | $1,570,000 | $2,000,000 | $1,358,823 | $1,120,720 |
| 0540 | Preformed thermoplastic pavement marking, 24 in. white (6200015) | LF | 1,649 | $18.00 | $18.00 | $18.00 | $18.00 |
| 0550 | Preformed thermoplastic pavement marking, left/right arrow (6200021) | EACH | 22 | $280.00 | $280.00 | $280.00 | $280.00 |
| 0560 | Preformed thermoplastic pavement marking, straight arrow (6200024) | EACH | 1 | $250.00 | $250.00 | $250.00 | $250.00 |
| 0570 | Preformed thermoplastic pavement marking, combination STR/LT/RT (6200027) | EACH | 6 | $450.00 | $450.00 | $450.00 | $450.00 |
| 0580 | Preformed thermoplastic pavement marking, 24 in. X 36 in., yield line triangle (6200042A) | EACH | 47 | $75.00 | $75.00 | $75.00 | $75.00 |
| 0590 | 4 in. yellow class 2 pavement marking paint (25-mil, type L beads) (6205901B) | LF | 43,144 | $0.25 | $0.25 | $0.25 | $0.25 |
| 0600 | 6 in. white class 2 pavement marking paint (25-mil, type L beads) (6205902B) | LF | 57,954 | $0.32 | $0.32 | $0.32 | $0.32 |
| 0610 | 12 in. white class 2 pavement marking paint (25-mil, type L beads) (6205906B) | LF | 5,264 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0620 | Misc.temporary pavement marking paint (6209901) | LS | 1 | $10,000 | $10,000 | $10,000 | $0.15 |
| 0630 | Misc.curb reflectors (6209902) | EACH | 195 | $65.00 | $65.00 | $65.00 | $125.00 |
| 0640 | Coldmilling bituminous pavement for removal of surfacing (3 in. thick or less) (6221001) | SY | 164,620 | $3.25 | $3.18 | $2.50 | $3.50 |
| 0650 | Coldmilling concrete pavement for removal of surface (6221011) | SY | 932 | $9.40 | $9.30 | $7.50 | $3.27 |
| 0660 | Contractor furnished surveying and staking (6274000) | LS | 1 | $60,000 | $50,000 | $20,000 | $39,018 |
| 0670 | Class B-1 concrete (7034001) | CY | 3 | $1,720.00 | $1,000.00 | $272.00 | $0.00 |
| 0680 | Reinforcing steel (7061000) | LB | 270 | $3.00 | $50.00 | $5.50 | $12.00 |
| 0690 | Misc.modular block retaining wall (7209904) | SF | 296 | $95.00 | $65.00 | $85.00 | $105.00 |
| 0700 | 12 in. pipe group C (7250412) | LF | 5 | $330.00 | $1,150.00 | $551.00 | $540.00 |
| 0710 | 18 in. pipe group C (7250418) | LF | 58 | $153.00 | $250.00 | $265.00 | $312.00 |
| 0720 | 24 in. pipe group C (7250424) | LF | 75 | $201.00 | $205.00 | $228.00 | $147.00 |
| 0730 | 12 in. pipe group A (7261012) | LF | 51 | $165.00 | $175.00 | $207.00 | $290.00 |
| 0740 | Precast concrete manhole - 48 in. (7310048) | FT | 3 | $960.00 | $1,200.00 | $2,050.00 | $1,767.00 |
| 0750 | Precast concrete drop inlet 3 FT X 2 FT-6 in. (7311030) | FT | 12 | $795.00 | $880.00 | $925.50 | $3,159.00 |
| 0760 | Precast concrete drop inlet 4 FT X 2 FT (7311042) | FT | 7 | $965.00 | $1,375.00 | $1,323.50 | $1,065.00 |
| 0770 | Misc.curb inlet top repair/replacement (7319902) | EACH | 17 | $2,690.00 | $2,500.00 | $3,800.00 | $1,860.00 |
| 0780 | Misc.grated inlet repair/replacement (7319902) | EACH | 6 | $3,870.00 | $2,500.00 | $6,500.00 | $2,172.00 |
| 0790 | 12 in. or allowed substitute group C flared end section (7320812A) | EACH | 1 | $900.00 | $700.00 | $2,020.00 | $772.00 |
| 0800 | Misc.6.5FT X 8FT drainage flume (7329902) | EACH | 5 | $6,136.00 | $5,000.00 | $2,290.00 | $10,300 |
| 0810 | Mulching (8025006) | ACRE | 0.50 | $5,000.00 | $5,000.00 | $12,500 | $4,500.00 |
| 0820 | Turf type tall fescue sodding (8031000A) | SY | 5,127 | $12.50 | $12.50 | $17.50 | $8.00 |
| 0830 | Seeding - cool season grasses (8051000A) | ACRE | 0.50 | $5,000.00 | $5,000.00 | $12,500 | $4,500.00 |
| 0840 | Rock ditch check (8061005) | LF | 30 | $50.00 | $20.00 | $28.50 | $65.00 |
| 0850 | Alternate ditch check (8061006) | LF | 40 | $50.00 | $20.00 | $15.00 | $26.00 |
| 0860 | Curb inlet check (8061007A) | EACH | 72 | $25.00 | $125.00 | $160.00 | $103.00 |
| 0870 | Sediment removal (8061016) | CY | 314 | $1.00 | $200.00 | $25.00 | $25.00 |
| 0880 | Silt fence (8061019) | LF | 19,510 | $0.50 | $3.05 | $2.90 | $2.00 |
| 0890 | MGS guardrail (6061060) | LF | 2,697 | $36.00 | $36.00 | $36.00 | $36.00 |
| 0900 | MGS bridge approach transition section (regular/no curb) (6061069) | EACH | 5 | $4,500.00 | $4,500.00 | $4,500.00 | $4,500.00 |
| 0910 | MGS end anchor (6061080) | EACH | 9 | $2,100.00 | $2,100.00 | $2,100.00 | $2,100.00 |
| 0920 | Type A crashworthy end terminal (MASH) (6063014) | EACH | 9 | $3,900.00 | $3,900.00 | $3,900.00 | $3,900.00 |
| 0930 | Lighting pole, 45 FT. or 13.5 M, type at design 3 (9011064) | EACH | 13 | $3,446.00 | $3,446.00 | $3,446.00 | $3,446.00 |
| 0940 | Luminaire, LED-B (9011312) | EACH | 10 | $384.00 | $384.00 | $384.00 | $384.00 |
| 0950 | Luminaire, LED-C (9011313) | EACH | 20 | $525.00 | $525.00 | $525.00 | $525.00 |
| 0960 | Conduit, 2 in. rigid, in trench (9013002) | LF | 370 | $14.75 | $14.75 | $14.75 | $14.75 |
| 0970 | Conduit, 3 in. rigid, in trench (9013003) | LF | 80 | $16.00 | $16.00 | $16.00 | $16.00 |
| 0980 | Conduit, 3 in. rigid, pushed (9014003) | LF | 1,430 | $18.50 | $18.50 | $18.50 | $18.50 |
| 0990 | Trenching type II (9015020) | LF | 3,890 | $5.80 | $5.80 | $5.80 | $5.80 |
| 1000 | Pull box, preformed class 1 (9016110) | EACH | 16 | $1,420.00 | $1,420.00 | $1,420.00 | $1,420.00 |
| 1010 | Cable, 6 AWG 1 conductor (9017006) | LF | 6,440 | $2.10 | $2.10 | $2.10 | $2.10 |
| 1020 | Cable, 10 AWG 1 conductor, pole and bracket (9017110) | LF | 1,300 | $1.00 | $1.00 | $1.00 | $1.00 |
| 1030 | Wire, 6 AWG, bare neutral (9017206) | LF | 3,220 | $1.95 | $1.95 | $1.95 | $1.95 |
| 1040 | Cable-conduit, 1 in., 2 conductors and 1 bare neutral, 6 AWG (9017404) | LF | 3,520 | $5.40 | $5.40 | $5.40 | $5.40 |
| 1050 | Pole foundation (45 FT. or 13.5 M mounting height) (9018245) | EACH | 13 | $2,032.00 | $2,032.00 | $2,032.00 | $2,032.00 |
| 1060 | Signal head, type 3B (9020513) | EACH | 14 | $1,206.00 | $1,206.00 | $1,206.00 | $1,206.00 |
| 1070 | Signal head, type 4B (9020514) | EACH | 1 | $1,384.00 | $1,384.00 | $1,384.00 | $1,384.00 |
| 1080 | SH-flat sheet - signal sign (9020833) | SF | 49 | $42.00 | $42.00 | $42.00 | $42.00 |
| 1090 | Signal sign, mounting hardware (9020834) | EACH | 11 | $437.00 | $437.00 | $437.00 | $437.00 |
| 1100 | Post, signal 8 FT. (9022708) | EACH | 3 | $1,219.00 | $1,219.00 | $1,219.00 | $1,219.00 |
| 1110 | Post, type C, 40 FT. arm or 12.2 M arm (9023240) | EACH | 2 | $13,283 | $13,283 | $13,283 | $13,283 |
| 1120 | Post, type C, 55 FT. arm (9023255) | EACH | 2 | $15,872 | $15,872 | $15,872 | $15,872 |
| 1130 | Controller assembly housing, NEMA TS2 controller (9024283) | EACH | 1 | $19,832 | $19,832 | $19,832 | $19,832 |
| 1140 | Conduit, 3 in., trench with tracer wire (9025300) | LF | 710 | $16.00 | $16.00 | $16.00 | $16.00 |
| 1150 | Conduit, 3 in., pushed with tracer wire (9027300) | LF | 360 | $23.25 | $23.25 | $23.25 | $23.25 |
| 1160 | Cable, 4 AWG 1 conductor, power (9028204) | LF | 660 | $2.50 | $2.50 | $2.50 | $2.50 |
| 1170 | Cable, 6 AWG 1 conductor, power (9028206) | LF | 1,020 | $2.00 | $2.00 | $2.00 | $2.00 |
| 1180 | Cable, 16 AWG 2 conductor (9028308) | LF | 1,110 | $1.05 | $1.05 | $1.05 | $1.05 |
| 1190 | Cable, 16 AWG 5 conductor (9028310) | LF | 1,120 | $1.75 | $1.75 | $1.75 | $1.75 |
| 1200 | Cable, 16 AWG 7 conductor (9028311) | LF | 2,870 | $2.15 | $2.15 | $2.15 | $2.15 |
| 1210 | Pull box, preformed class 2 (9028811) | EACH | 4 | $2,442.00 | $2,442.00 | $2,442.00 | $2,442.00 |
| 1220 | Pull box, concrete, double, type A (9028821) | EACH | 1 | $5,910.00 | $5,910.00 | $5,910.00 | $5,910.00 |
| 1230 | Base, concrete (9029100) | CY | 16.40 | $2,788.00 | $2,788.00 | $2,788.00 | $2,788.00 |
| 1240 | Misc.traffic signal maintenance & programming (9029901) | LS | 1 | $9,776.00 | $9,776.00 | $9,776.00 | $9,776.00 |
| 1250 | Misc.accessible pedestrian push button and signing (9029902) | EACH | 6 | $781.00 | $781.00 | $781.00 | $781.00 |
| 1260 | Misc.atc traffic signal controller (9029902) | EACH | 1 | $3,819.00 | $3,819.00 | $3,819.00 | $3,819.00 |
| 1270 | Misc.combination pad mounted 120V/240V power supply and lighting controller with UPS - TS2 traffic signal cabinet (9029902) | EACH | 1 | $25,504 | $25,504 | $25,504 | $25,504 |
| 1280 | Misc.countdown pedestrian signal head, type 1S (9029902) | EACH | 6 | $643.00 | $643.00 | $643.00 | $643.00 |
| 1290 | Misc.network connected signal monitor (9029902) | EACH | 1 | $1,504.00 | $1,504.00 | $1,504.00 | $1,504.00 |
| 1300 | Misc.SL district traffic signal detection system (9029902) | EACH | 1 | $40,199 | $40,199 | $40,199 | $40,199 |
| 1310 | Misc.temporary generator for signal power (9029902) | EACH | 1 | $388.00 | $388.00 | $388.00 | $388.00 |
| 1320 | Square steel sign post (4IN.) base (9031005) | EACH | 3 | $3,800.00 | $3,800.00 | $3,800.00 | $3,800.00 |
| 1330 | Concrete footings, embedded (9031010) | CY | 11 | $3,600.00 | $3,600.00 | $3,600.00 | $3,600.00 |
| 1340 | Structural steel posts (9031210) | LB | 4,270 | $10.00 | $10.00 | $10.00 | $10.00 |
| 1350 | Pipe posts (9031220) | LB | 3,640 | $10.00 | $10.00 | $10.00 | $10.00 |
| 1360 | 4 in. square steel post (9031230) | LF | 59 | $150.00 | $150.00 | $150.00 | $150.00 |
| 1370 | 2 in. PSST post - 12 GA. (9031270A) | LF | 556 | $32.00 | $32.00 | $32.00 | $32.00 |
| 1380 | Driven post anchor for 2 in. PSST - 7 GA. (9031273A) | EACH | 17 | $350.00 | $350.00 | $350.00 | $350.00 |
| 1390 | Concrete post anchor for 2 in. PSST. - 7 GA. (9031274) | EACH | 13 | $400.00 | $400.00 | $400.00 | $400.00 |
| 1400 | SH-flat sheet (9035004A) | SF | 1,183 | $38.00 | $38.00 | $38.00 | $38.00 |
| 1410 | ST-structural (9035011A) | SF | 3,686 | $40.00 | $40.00 | $40.00 | $40.00 |
| 1420 | SHF-flat sheet fluorescent (9035069A) | SF | 297 | $42.00 | $42.00 | $42.00 | $42.00 |
| 1430 | STF-structural fluorescent (9035071A) | SF | 278 | $42.00 | $42.00 | $42.00 | $42.00 |
| 1440 | Misc.112 FT. span sign truss, sign #2 (9039901) | LS | 1 | $194,000 | $194,000 | $194,000 | $194,000 |
| 1450 | Misc.113 FT. span sign truss, sign #7 (9039901) | LS | 1 | $195,000 | $195,000 | $195,000 | $195,000 |
| 1460 | Misc.26 FT. cantilever tubular sign truss, sign #173 (9039901) | LS | 1 | $73,000 | $73,000 | $73,000 | $73,000 |
| 1470 | Misc.28 FT. cantilever sign truss, sign #1 (9039901) | LS | 1 | $95,000 | $95,000 | $95,000 | $95,000 |
| 1480 | Misc.28 FT. cantilever sign, sign #3 (9039901) | LS | 1 | $95,000 | $95,000 | $95,000 | $95,000 |
| 1490 | Misc.30 FT. cantilever sign, sign #6 (9039901) | LS | 1 | $98,000 | $98,000 | $98,000 | $98,000 |
| 1500 | Misc.54 FT. span sign truss, sign #24 (9039901) | LS | 1 | $162,000 | $162,000 | $162,000 | $162,000 |
| 1510 | Misc.57 FT. span tubular sign truss, sign #178 (9039901) | LS | 1 | $152,000 | $152,000 | $152,000 | $152,000 |
| 1520 | Misc.barrier mounts for PSST posts (9039902) | EACH | 54 | $425.00 | $425.00 | $425.00 | $425.00 |
| 1530 | Misc.ITS asset management tool (9109901) | LS | 1 | $2,654.00 | $2,654.00 | $2,654.00 | $2,654.00 |
| 1540 | Misc.CCTV camera assembly (9109902) | EACH | 1 | $4,754.00 | $4,754.00 | $4,754.00 | $4,754.00 |
| 1550 | Misc.CCTV extension pole, 20' metallic finish (9109902) | EACH | 1 | $2,514.00 | $2,514.00 | $2,514.00 | $2,514.00 |
| 1560 | Misc.fiber optic fusion splice (9109902) | EACH | 70 | $135.00 | $135.00 | $135.00 | $135.00 |
| 1570 | Misc.fiber optic jumper (9109902) | EACH | 4 | $48.50 | $48.50 | $48.50 | $48.50 |
| 1580 | Misc.fiber optic pigtail (9109902) | EACH | 10 | $29.50 | $29.50 | $29.50 | $29.50 |
| 1590 | Misc.install CCTV camera assembly (9109902) | EACH | 1 | $970.00 | $970.00 | $970.00 | $970.00 |
| 1600 | Misc.install modot furnished IP-addressable power strip (9109902) | EACH | 1 | $123.00 | $123.00 | $123.00 | $123.00 |
| 1610 | Misc.ITS pull box with concrete pad, preformed class 5 (9109902) | EACH | 2 | $2,951.00 | $2,951.00 | $2,951.00 | $2,951.00 |
| 1620 | Misc.modot buried cable drivable delineator post (9109902) | EACH | 2 | $181.50 | $181.50 | $181.50 | $181.50 |
| 1630 | Misc.wall-mounted interconnect center (9109902) | EACH | 1 | $908.40 | $908.40 | $908.40 | $908.40 |
| 1640 | Misc.CCTV camera cable (9109903) | LF | 50 | $2.85 | $2.85 | $2.85 | $2.85 |
| 1650 | Misc.fiber optic cable, 24 strand, single mode (9109903) | LF | 1,590 | $7.55 | $7.55 | $7.55 | $7.55 |
| 1660 | Misc.modot ITS assets relocation (9109903) | LF | 100 | $17.00 | $17.00 | $17.00 | $17.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from MoDOT's tabulation for this contract. MoDOT letting tabulation PDFs (vendor ranking and bid tabulation), January 2020 to October 2026. About one bid in eight did not match its published total and is left out. Item codes from before mid 2021 are written in the current MoDOT format so one item groups across years.
Every contract let that day: MoDOT letting of November 14, 2025. Compiled by Mirage Metrics.