MoDOT contract 250314-D04 bid tabulation
J5S3540 - ROUTE 47 - WASHINGTON COUNTY. Let by Missouri DOT on March 14, 2025, Washington, Central. 3 bids received; low bid $588,738 by Udt, LLC.
- Owner
- Missouri DOT
- Letting
- 14 MAR 2025
- Pay items
- 32
- Data through
- 16 OCT 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Udt, LLC | $588,738 | Low |
| 2 | Widel, Inc. | $716,371 | +22% |
| 3 | Plattin Creek Excavating, LLC dba PCX Construction, LLC | $902,971 | +53% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Udt, LLC | 2. Widel, Inc. | 3. Plattin Creek Excavating, LLC dba PCX Construction, LLC |
|---|---|---|---|---|---|---|
| 0010 | Signet dbe reporting (1081000) | LS | 1 | $1,000.00 | $1,000.00 | $1,000.00 |
| 0020 | Removal of improvements (2022010) | LS | 1 | $8,964.24 | $13,500 | $11,700 |
| 0030 | Linear grading class 1 (2071000) | STA | 1.40 | $1,960.71 | $2,200.00 | $3,260.00 |
| 0040 | Shaping slopes, class III (2153000) | 100F | 4 | $1,484.00 | $1,100.00 | $1,250.00 |
| 0050 | Type 1 aggregate for base (4 in. thick) (3040143) | SY | 273 | $28.00 | $55.00 | $20.00 |
| 0060 | Misc.optional pavement (4019905) | SY | 273.20 | $183.20 | $135.00 | $120.00 |
| 0070 | Furnishing type 2 rock blanket (6113020) | CY | 524 | $55.00 | $70.00 | $52.00 |
| 0080 | Placing type 2 rock blanket (6113040) | CY | 524 | $56.58 | $11.50 | $94.00 |
| 0090 | Changeable message sign without communication interface, contractor furnished, contractor retained (6161098A) | EACH | 2 | $3,600.00 | $2,550.00 | $2,000.00 |
| 0100 | Misc.temporary traffic control (6169901) | LS | 1 | $9,360.00 | $16,000 | $12,900 |
| 0110 | Mobilization (6181000) | LS | 1 | $55,000 | $90,000 | $80,000 |
| 0120 | 4 in. white standard waterborne pavement marking paint, type P beads (6206000C) | LF | 1,434 | $1.00 | $0.60 | $0.50 |
| 0130 | 4 in. yellow standard waterborne pavement marking paint, type P beads (6206001C) | LF | 1,434 | $1.00 | $0.60 | $0.50 |
| 0140 | Permanent erosion control geotextile (6240103A) | SY | 786 | $5.00 | $5.25 | $3.00 |
| 0150 | Portland cement concrete shoulder rumble strip (6262000A) | STA | 2.80 | $3,300.00 | $3,300.00 | $8,000.00 |
| 0160 | Contractor furnished surveying and staking (6274000) | LS | 1 | $7,200.00 | $6,000.00 | $9,000.00 |
| 0170 | Seeding - cool season grasses (8051000A) | ACRE | 1 | $12,000 | $4,200.00 | $7,850.00 |
| 0180 | Rock ditch check (8061005) | LF | 144 | $36.00 | $19.00 | $13.00 |
| 0190 | Type B berm (8061010A) | LF | 260 | $36.00 | $30.00 | $6.00 |
| 0200 | Sediment removal (8061016) | CY | 12 | $40.00 | $90.00 | $167.00 |
| 0210 | MGS guardrail, 8 FT. posts, 6 FT. - 3 in. spacing (6061061) | LF | 388 | $36.00 | $40.00 | $30.00 |
| 0220 | MGS bridge approach transition section (regular/no curb) (6061069) | EACH | 4 | $4,570.91 | $4,500.00 | $4,200.00 |
| 0230 | Type A crashworthy end terminal (MASH) (6063014) | EACH | 4 | $4,069.20 | $4,100.00 | $3,800.00 |
| 0240 | Removal of existing bridge deck (2162500) | SF | 4,980 | $1.80 | $10.00 | $16.00 |
| 0250 | Bridge approach slab (minor road) (5031011A) | SY | 127 | $250.00 | $150.00 | $120.00 |
| 0260 | Slab on steel (7034212) | SY | 574 | $155.00 | $365.00 | $609.00 |
| 0270 | Type H barrier (7034216) | LF | 361 | $145.00 | $155.00 | $110.00 |
| 0280 | Protective coating - concrete bents and piers (epoxy) (7110200) | LS | 1 | $14,400 | $9,000.00 | $12,000 |
| 0290 | Strengthening existing beams (7121250) | LS | 1 | $10,251 | $40,000 | $58,600 |
| 0300 | Cleaning and coating existing bearings (7123100) | EACH | 4 | $14,400 | $1,600.00 | $3,000.00 |
| 0310 | Slab drain (7123610) | EACH | 28 | $600.00 | $300.00 | $340.00 |
| 0320 | Non-destructive testing (7126000) | LF | 25 | $100.00 | $150.00 | $25.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from MoDOT's tabulation for this contract. MoDOT letting tabulation PDFs (vendor ranking and bid tabulation), January 2020 to October 2026. About one bid in eight did not match its published total and is left out. Item codes from before mid 2021 are written in the current MoDOT format so one item groups across years.
Every contract let that day: MoDOT letting of March 14, 2025. Compiled by Mirage Metrics.