Hartman and Company, Inc.: MoDOT bid record
Hartman and Company, Inc. submitted 63 bids on Missouri DOT contracts in the data, from 15 MAY 2020 to 16 OCT 2026, and was the low bidder on 33 of them (52%). When it was not low, its total sat a median +9.0% above the low bid.
- Owner
- Missouri DOT
- Low bid volume
- $82,343,796
- Latest bid
- 16 OCT 2026
- Data through
- 16 OCT 2026
By year
| Year | Bids | Low bids | Win rate |
|---|---|---|---|
| 2020 | 10 | 2 | 20% |
| 2021 | 8 | 5 | 63% |
| 2022 | 3 | 3 | 100% |
| 2023 | 11 | 7 | 64% |
| 2024 | 11 | 7 | 64% |
| 2025 | 9 | 4 | 44% |
| 2026 | 11 | 5 | 45% |
By district
| District | Bids | Low bids | Win rate |
|---|---|---|---|
| Southwest | 55 | 33 | 60% |
| Southeast | 6 | 0 | 0% |
| Central | 2 | 0 | 0% |
Pay items where it is most often lowest
| Pay item | Code | Unit | Lines bid | Lowest on the line | Its median price | All bidders' median |
|---|---|---|---|---|---|---|
| Construction signs | 6161005 | SF | 75 | 53 (71%) | $7.50 | $7.00 |
| Advanced warning rail system | 6161008 | EACH | 53 | 42 (79%) | $75.00 | $51.40 |
| Silt fence | 8061019 | LF | 69 | 38 (55%) | $3.20 | $3.45 |
| Additional mobilization for seeding | 6181020 | EACH | 35 | 35 (100%) | $600.00 | $600.00 |
| MGS guardrail | 6061060 | LF | 44 | 32 (73%) | $27.00 | $30.00 |
| MGS bridge approach transition section (regular/no curb) | 6061069 | EACH | 43 | 31 (72%) | $3,750.00 | $3,800.00 |
| Type A crashworthy end terminal (MASH) | 6063014 | EACH | 50 | 28 (56%) | $3,250.00 | $3,300.00 |
| 4 in. white standard waterborne pavement marking paint, type P beads | 6206000C | LF | 43 | 28 (65%) | $0.55 | $0.20 |
| Type III moveable barricade | 6161030 | EACH | 40 | 26 (65%) | $185.00 | $156.69 |
| Channelizer (trim line) | 6161025 | EACH | 36 | 26 (72%) | $20.00 | $18.00 |
| Mulching | 8025006 | ACRE | 38 | 21 (55%) | $1,875.00 | $2,500.00 |
| Seeding - cool season grasses | 8051000A | ACRE | 40 | 20 (50%) | $3,417.50 | $3,600.47 |
A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.
Who it meets most
| Firm | Contracts in common | That firm ranked ahead |
|---|---|---|
| Emery Sapp & Sons, Inc. | 30 | 6 of 30 |
| Capital Paving & Construction, LLC | 24 | 5 of 24 |
| West Plains Bridge & Grading, LLC | 17 | 8 of 17 |
| KCI Construction Company | 16 | 1 of 16 |
| Mera Excavating, LLC | 13 | 6 of 13 |
| Phillips Hardy, Inc. | 11 | 1 of 11 |
| Lehman Construction, LLC | 11 | 4 of 11 |
| Gene Haile Excavating, Inc. | 10 | 5 of 10 |
| Radmacher Brothers Excavating Co., Inc. | 10 | 2 of 10 |
| Louis-Company, LLC | 9 | 1 of 9 |
Latest bids
| Let | Contract | District | Project | Rank | Its bid | Against the low bid |
|---|---|---|---|---|---|---|
| 16 OCT 2026 | 261016-G07 | Southwest | JSR0138 - ROUTE N - POLK COUNTY | 4 of 9 | $1,194,000 | +6.0% |
| 16 OCT 2026 | 261016-G11 | Southwest | JSU0080 - ROUTE 266 - GREENE COUNTY | 3 of 7 | $3,475,000 | +3.0% |
| 15 MAY 2026 | 260515-G05 | Southwest | JSR0075 - ROUTE H, NN - NEWTON COUNTY | 2 of 5 | $387,000 | +7.0% |
| 15 MAY 2026 | 260515-G06 | Southwest | JSR0110-ROUTE 7-BENTON COUNTY | 1 of 4 | $3,760,000 | Low, 3.0% under the second |
| 15 MAY 2026 | 260515-G08 | Southwest | JSR0134- ROUTE D - BATES COUNTY | 1 of 5 | $3,499,999 | Low, 3.0% under the second |
| 15 MAY 2026 | 260515-G09 | Southwest | JSR0140 - ROUTE E - VERNON COUNTY | 2 of 5 | $1,375,000 | +2.0% |
| 15 MAY 2026 | 260515-G10 | Southwest | JSR0143 - ROUTE H - MCDONALD COUNTY | 1 of 3 | $1,075,000 | Low, 13% under the second |
| 17 APR 2026 | 260417-G01 | Southwest | J8S0736E - ROUTE CC - CHRISTIAN COUNTY | 2 of 4 | $2,795,000 | +10% |
| 20 FEB 2026 | 260220-G01 | Southwest | JSR0049, JSR0183 - ROUTE 13 - POLK COUNTY | 1 of 2 | $4,750,000 | Low, 11% under the second |
| 20 FEB 2026 | 260220-G04 | Southwest | JSR0366 - ROUTE Y - WEBESTER COUNTY | 1 of 3 | $2,336,408 | Low, 38% under the second |
| 16 JAN 2026 | 260116-G04 | Southwest | JSR0137, JSR0142 - ROUTE BB, H - JASPER COUNTY | 2 of 5 | $2,188,300 | +7.0% |
| 14 NOV 2025 | 251114-G07 | Southwest | J7S3379, JSR0172-ROUTES 43, 59-MCDONALD COUNTY | 2 of 4 | $5,340,001 | +4.0% |
| 14 NOV 2025 | 251114-G11 | Southwest | JSR0119 - ROUTE 248 - BARRY COUNTY | 2 of 2 | $3,770,000 | +1.0% |
| 17 OCT 2025 | 251017-G04 | Southwest | J8S3158 - OR 65 - GREENE COUNTY | 1 of 2 | $2,780,000 | Low, 3.0% under the second |
| 19 SEP 2025 | 250919-H03 | Southeast | J9S3691-ROUTE AF-WRIGHT COUNTY | 4 of 8 | $2,217,000 | +15% |
| 16 MAY 2025 | 250516-G01 | Southwest | J7S3059B - ROUTE FF - JASPER COUNTY | 1 of 6 | $2,930,000 | Low, 6.0% under the second |
| 16 MAY 2025 | 250516-G02 | Southwest | J7S3531, J7S3506, J7S3531B - VARIOUS ROUTES - BARTON, DADE, JASPER, NEWTON COUNTIES | 1 of 4 | $2,332,661 | Low, 24% under the second |
| 14 MAR 2025 | 250314-G03 | Southwest | J8S3156 - ROUTE CRD 127 - GREENE COUNTY | 1 of 3 | $4,610,000 | Low, 6.0% under the second |
| 21 FEB 2025 | 250221-D06 | Central | JCD0101 - ROUTES OR 44 - LACLEDE COUNTY | 2 of 4 | $1,291,000 | +5.0% |
| 17 JAN 2025 | 250117-H06 | Southeast | JSE0027, JSE0028, JSE0029 - ROUTE 137 - TEXAS COUNTY | 3 of 3 | $4,569,720 | +15% |
| 15 NOV 2024 | 241115-G05 | Southwest | JSR0094 - ROUTE 13 - STONE COUNTY | 3 of 5 | $1,797,087 | +12% |
| 15 NOV 2024 | 241115-G3A | Southwest | J8S3238 - ROUTE 125 - GREENE COUNTY | 1 of 6 | $6,166,000 | Low, 3.0% under the second |
| 15 NOV 2024 | 241115-G3B | Southwest | JSRM0039 - ROUTE CC - WEBSTER COUNTY | 1 of 6 | $74,000 | Low, -12% under the second |
| 20 SEP 2024 | 240920-H01 | Southeast | J9P3687 - ROUTE 19 - SHANNON COUNTY | 2 of 7 | $2,240,000 | +14% |
| 16 AUG 2024 | 240816-G02 | Southwest | J7S0532 - ROUTE 90 - MCDONALD COUNTY | 1 of 4 | $2,295,000 | Low, 1.0% under the second |
How this record was read
MoDOT letting tabulation PDFs (vendor ranking and bid tabulation), January 2020 to October 2026. About one bid in eight did not match its published total and is left out. Item codes from before mid 2021 are written in the current MoDOT format so one item groups across years.
- Every bid counted here matched its published total to within one dollar; MoDOT's rank decides who was low.
- The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
- A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.
A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.