MoDOT contract 260515-G08 bid tabulation
JSR0134- ROUTE D - BATES COUNTY. Let by Missouri DOT on May 15, 2026, Bates, Southwest. 5 bids received; low bid $3,499,999 by Hartman and Company, Inc..
- Owner
- Missouri DOT
- Letting
- 15 MAY 2026
- Pay items
- 69
- Data through
- 16 OCT 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Hartman and Company, Inc. | $3,499,999 | Low |
| 2 | Louis-Company, LLC | $3,613,693 | +3.0% |
| 3 | Capital Paving & Construction, LLC | $3,777,624 | +8.0% |
| 4 | Realm Construction Inc. | $3,799,797 | +9.0% |
| 5 | Clarkson Construction Company | $4,181,192 | +19% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Hartman and Company, Inc. | 2. Louis-Company, LLC | 3. Capital Paving & Construction, LLC | 4. Realm Construction Inc. | 5. Clarkson Construction Company |
|---|---|---|---|---|---|---|---|---|
| 0010 | Clearing and grubbing (2013000) | ACRE | 2 | $1,360.00 | $19,529 | $3,900.00 | $9,377.25 | $7,500.00 |
| 0020 | Removal of improvements (2022010) | LS | 1 | $55,200 | $19,036 | $25,000 | $32,631 | $24,322 |
| 0030 | Unclassified excavation (2035000) | CY | 3,787 | $14.10 | $19.29 | $12.00 | $10.95 | $21.50 |
| 0040 | Embankment in place (2035500) | CY | 6,168 | $19.70 | $27.41 | $45.00 | $25.55 | $33.89 |
| 0050 | Compacting embankment (2036000) | CY | 2,848 | $8.10 | $7.24 | $11.00 | $7.00 | $0.10 |
| 0060 | Shaping slopes, class III (2153000) | 100F | 23 | $1,600.00 | $1,848.29 | $1,700.00 | $1,150.00 | $1,000.00 |
| 0070 | Type 5 aggregate for base (6 in. thick) (3040506) | SY | 6,535 | $16.10 | $21.91 | $15.00 | $17.45 | $22.10 |
| 0080 | Type A2 shoulder (4010150) | SY | 1,663.60 | $71.30 | $86.82 | $82.00 | $93.85 | $67.50 |
| 0090 | Misc.optional pavement (4019905) | SY | 4,871.50 | $66.30 | $80.73 | $68.00 | $103.75 | $91.30 |
| 0100 | Furnishing type 2 rock blanket (6113020) | CY | 1,087 | $89.90 | $95.02 | $62.00 | $87.90 | $90.35 |
| 0110 | Placing type 2 rock blanket (6113040) | CY | 1,087 | $17.30 | $20.59 | $29.00 | $33.95 | $47.97 |
| 0120 | Construction signs (6161005) | SF | 2,334 | $8.00 | $9.75 | $8.37 | $9.20 | $8.00 |
| 0130 | Channelizer (trim-line) (6161025) | EACH | 110 | $10.00 | $34.12 | $29.29 | $46.00 | $40.00 |
| 0140 | Type 3 moveable barricade (6161030) | EACH | 45 | $150.00 | $194.96 | $167.36 | $172.50 | $150.00 |
| 0150 | Direction indicator barricade (6161033) | EACH | 64 | $100.00 | $109.67 | $94.14 | $115.00 | $100.00 |
| 0160 | Flashing arrow panel (6161040) | EACH | 4 | $1,200.00 | $2,132.43 | $1,830.47 | $1,380.00 | $1,200.00 |
| 0170 | Sequential flashing warning light (6161055) | EACH | 64 | $100.00 | $97.48 | $83.68 | $115.00 | $100.00 |
| 0180 | Changeable message sign with communication interface, contractor furnished retained (6161099) | EACH | 8 | $5,000.00 | $5,788.01 | $4,968.41 | $5,750.00 | $5,000.00 |
| 0190 | Concrete traffic barrier, type D (6173100) | LF | 400 | $166.50 | $170.59 | $198.73 | $134.45 | $190.81 |
| 0200 | Mobilization (6181000) | LS | 1 | $195,878 | $166,000 | $279,000 | $404,813 | $400,000 |
| 0210 | Additional mobilization for seeding (6181020) | EACH | 4 | $600.00 | $600.00 | $600.00 | $600.00 | $600.00 |
| 0220 | 6 in. white class 2 pavement marking paint (25-mil, type L beads) (6205902B) | LF | 1,182 | $0.35 | $0.85 | $0.73 | $0.40 | $0.35 |
| 0230 | 6 in. yellow class 2 pavement marking paint (25-mil, type L beads) (6205903B) | LF | 1,092 | $0.35 | $0.85 | $0.73 | $0.40 | $0.35 |
| 0240 | 4 in. white class 1 pavement marking paint (18-mil, type P beads) (6206000D) | LF | 1,438 | $0.25 | $0.61 | $0.52 | $0.30 | $0.25 |
| 0250 | 4 in. yellow class 1 pavement marking paint (18-mil, type P beads) (6206001D) | LF | 1,977 | $0.25 | $0.61 | $0.52 | $0.60 | $0.25 |
| 0260 | Permanent erosion control geotextile (6240103A) | SY | 1,630 | $6.10 | $3.86 | $1.48 | $2.10 | $3.86 |
| 0270 | Contractor furnished surveying and staking (6274000) | LS | 1 | $20,000 | $42,649 | $25,637 | $19,550 | $35,000 |
| 0280 | Mulching (8025006) | ACRE | 3.50 | $1,400.00 | $1,705.94 | $1,435.66 | $1,610.00 | $600.00 |
| 0290 | Seeding - cool season grasses (8051000A) | ACRE | 2.80 | $2,800.00 | $3,411.88 | $2,871.32 | $3,220.00 | $2,450.00 |
| 0300 | Rock ditch check (8061005) | LF | 16 | $125.50 | $60.93 | $51.27 | $149.60 | $28.50 |
| 0310 | Sediment removal (8061016) | CY | 63 | $21.80 | $250.81 | $35.00 | $57.00 | $67.36 |
| 0320 | Temporary seeding (8061017) | ACRE | 0.70 | $1,800.00 | $2,193.34 | $1,845.85 | $2,070.00 | $2,450.00 |
| 0330 | Silt fence (8061019) | LF | 4,667 | $2.90 | $3.53 | $2.97 | $3.35 | $3.20 |
| 0340 | MGS guardrail (6061060) | LF | 3,625 | $28.00 | $34.39 | $29.29 | $32.20 | $28.00 |
| 0350 | MGS bridge approach transition section (regular/no curb) (6061069) | EACH | 10 | $3,600.00 | $4,776.68 | $3,765.53 | $5,692.50 | $3,800.00 |
| 0360 | MGS end anchor (6061080) | EACH | 5 | $1,400.00 | $2,462.06 | $1,464.37 | $1,552.50 | $1,350.00 |
| 0370 | Type A crashworthy end terminal (MASH) (6063014) | EACH | 9 | $3,200.00 | $3,871.66 | $3,347.14 | $3,478.75 | $3,025.00 |
| 0380 | Concrete footings, embedded (9031010) | CY | 8.10 | $1,500.00 | $1,242.55 | $1,568.97 | $1,150.00 | $1,000.00 |
| 0390 | I-beam posts (9031210) | LB | 3,010 | $5.00 | $5.92 | $5.23 | $8.05 | $7.00 |
| 0400 | Pipe posts (9031220) | LB | 1,790 | $6.00 | $7.43 | $6.28 | $9.20 | $8.00 |
| 0410 | Breakaway assembly (perforated square steel tube) (9031241) | EACH | 11 | $450.00 | $404.17 | $470.69 | $430.10 | $374.00 |
| 0420 | 2.25 in. PSST post insert (6 FT.) - 12 GA. (9031272A) | EACH | 11 | $130.00 | $168.47 | $135.98 | $118.45 | $103.00 |
| 0430 | 2.5 in. PSST post - 12 GA. (9031280) | LF | 176 | $22.00 | $22.03 | $23.01 | $28.75 | $25.00 |
| 0440 | Concrete post anchor for 2.5 in. PSST. - 7 GA. (9031285) | EACH | 11 | $250.00 | $1,213.22 | $261.50 | $345.00 | $300.00 |
| 0450 | SH-flat sheet (9035004A) | SF | 254 | $22.00 | $25.72 | $23.01 | $28.75 | $25.00 |
| 0460 | ST-structural (9035011A) | SF | 404 | $32.00 | $35.36 | $33.47 | $34.50 | $30.00 |
| 0470 | Removal of miscellaneous acm (non-friable) (2024043) | SF | 21 | $350.00 | $426.49 | $358.91 | $402.50 | $350.00 |
| 0480 | Class 1 excavation (2061000) | CY | 80 | $62.10 | $32.92 | $590.00 | $115.20 | $148.53 |
| 0490 | Removal of bridges (2160500) | LS | 1 | $125,000 | $193,000 | $150,000 | $132,986 | $262,517 |
| 0500 | Bridge approach slab (minor road) (5031011A) | SY | 153 | $177.50 | $137.69 | $175.00 | $312.70 | $431.78 |
| 0510 | Rock sockets (3 FT 0 in. dia.) (7011204) | LF | 108 | $768.50 | $720.33 | $1,350.00 | $261.25 | $948.55 |
| 0520 | Video camera inspection (7011300) | EACH | 9 | $483.50 | $609.27 | $50.00 | $555.85 | $400.00 |
| 0530 | Foundation inspection holes (7011400) | LF | 198 | $98.00 | $119.42 | $161.00 | $112.70 | $104.00 |
| 0540 | Sonic logging testing (7011600) | EACH | 9 | $950.00 | $1,218.53 | $4,000.00 | $1,092.50 | $1,200.00 |
| 0550 | Galvanized structural steel piles (12 in) (7021212) | LF | 170 | $186.50 | $154.56 | $226.00 | $129.75 | $177.58 |
| 0560 | Dynamic pile testing (7025001) | EACH | 2 | $3,700.00 | $6,264.20 | $4,800.00 | $4,255.00 | $5,350.00 |
| 0570 | Dynamic pile restrike testing (7025004) | EACH | 2 | $2,000.00 | $2,437.06 | $2,500.00 | $2,300.00 | $4,506.83 |
| 0580 | Pre-bore for piling (7026000) | LF | 25 | $553.50 | $303.54 | $450.00 | $286.50 | $316.08 |
| 0590 | Pile point reinforcement (7027000) | EACH | 10 | $156.00 | $140.13 | $117.00 | $120.75 | $124.99 |
| 0600 | Class B concrete (substructure) (7032003) | CY | 142.60 | $1,530.00 | $1,277.58 | $1,000.00 | $2,081.35 | $1,548.26 |
| 0610 | Slab on steel (7034212) | SY | 988 | $497.00 | $379.40 | $600.00 | $376.05 | $593.13 |
| 0620 | Type D barrier (7034219A) | LF | 515 | $148.50 | $152.97 | $147.00 | $148.05 | $137.55 |
| 0630 | Reinforcing steel (bridges) (7061060) | LB | 26,670 | $1.60 | $0.95 | $2.99 | $1.65 | $1.96 |
| 0640 | Fabricated structural low alloy steel (I-beam) A709, grade 50 (7121111) | LB | 210,220 | $2.83 | $2.75 | $2.00 | $2.30 | $2.51 |
| 0650 | Slab drain (7123610) | EACH | 20 | $643.00 | $486.29 | $365.00 | $930.00 | $988.41 |
| 0660 | Finished field coat (system L) (7125116) | LS | 1 | $91,800 | $36,556 | $76,910 | $53,186 | $52,555 |
| 0670 | Vertical drain at end bents (7151001) | EACH | 2 | $4,380.00 | $4,490.26 | $3,500.00 | $3,023.35 | $4,280.06 |
| 0680 | Plain neoprene bearing pad (7161000) | EACH | 10 | $225.00 | $171.81 | $210.00 | $449.45 | $135.36 |
| 0690 | Laminated neoprene bearing pad (7161002) | EACH | 30 | $415.50 | $98.70 | $160.00 | $316.60 | $147.26 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from MoDOT's tabulation for this contract. MoDOT letting tabulation PDFs (vendor ranking and bid tabulation), January 2020 to October 2026. About one bid in eight did not match its published total and is left out. Item codes from before mid 2021 are written in the current MoDOT format so one item groups across years.
Every contract let that day: MoDOT letting of May 15, 2026. Compiled by Mirage Metrics.