MoDOT contract 260515-G09 bid tabulation

JSR0140 - ROUTE E - VERNON COUNTY. Let by Missouri DOT on May 15, 2026, Vernon, Southwest. 5 bids received; low bid $1,346,525 by Emery Sapp & Sons, Inc..

Owner
Missouri DOT
Letting
15 MAY 2026
Pay items
44
Data through
16 OCT 2026

Bidders

RankBidderTotal bidAgainst the low bid
1Emery Sapp & Sons, Inc.$1,346,525Low
2Hartman and Company, Inc.$1,375,000+2.0%
3Louis-Company, LLC$1,457,690+8.0%
4Mera Excavating, LLC$1,502,339+12%
5Crossland Construction Company Inc.$1,648,959+22%
MoDOT contract 260515-G09: bids by rank

Bid tabulation

LinePay itemUnitQuantity1. Emery Sapp & Sons, Inc.2. Hartman and Company, Inc.3. Louis-Company, LLC4. Mera Excavating, LLC5. Crossland Construction Company Inc.
0010Clearing and grubbing (2013000)ACRE1$3,350.00$5,800.00$7,491.78$3,490.03$60,000
0020Removal of improvements (2022010)LS1$14,000$1,940.00$2,341.18$167.08$25,000
0030Unclassified excavation (2035000)CY1,075$20.00$10.80$23.01$9.54$20.38
0040Compacting embankment (2036000)CY654$6.00$6.40$12.17$14.84$20.94
0050Type 1 aggregate for base (6 in. thick) (3040163)SY1,492$20.50$18.10$23.02$20.31$16.07
0060Misc.optional pavement (4019905)SY1,491.20$85.00$65.60$93.60$92.83$72.13
0070Furnishing type 2 rock blanket (6113020)CY236$73.00$83.10$99.15$77.02$90.70
0080Placing type 2 rock blanket (6113040)CY236$26.00$30.30$31.74$28.54$39.81
0090Construction signs (6161005)SF754$8.00$7.50$9.75$8.72$8.25
0100Type 3 moveable barricade (6161030)EACH10$171.00$160.00$207.99$262.72$176.00
0110Changeable message sign with communication interface, contractor furnished retained (6161099)EACH3$4,000.00$3,750.00$4,874.80$5,547.34$4,123.00
0120Mobilization (6181000)LS1$127,000$107,985$90,099$137,622$150,000
0130Additional mobilization for seeding (6181020)EACH4$600.00$600.00$600.00$600.00$600.00
01404 in. white class 1 pavement marking paint (18-mil, type P beads) (6206000D)LF1,686$0.54$0.50$0.65$1.67$0.55
01504 in. yellow class 1 pavement marking paint (18-mil, type P beads) (6206001D)LF343$0.54$0.50$0.65$1.95$0.55
0160Permanent erosion control geotextile (6240103A)SY354$3.60$11.00$3.12$2.55$6.21
0170Contractor furnished surveying and staking (6274000)LS1$18,500$10,800$19,499$22,762$16,494
0180Mulching (8025006)ACRE1.40$1,490.00$1,400.00$1,819.92$4,368.30$1,587.00
0190Seeding - cool season grasses (8051000A)ACRE1.10$2,985.00$2,800.00$3,639.85$4,330.09$3,169.00
0200Rock ditch check (8061005)LF96$20.00$23.00$45.50$20.03$15.31
0210Sediment removal (8061016)CY30$14.00$38.70$62.43$2.78$64.62
0220Temporary seeding (8061017)ACRE0.30$2,250.00$2,100.00$2,729.90$7,125.38$2,382.00
0230Silt fence (8061019)LF1,712$3.20$3.00$3.90$4.11$4.33
0240Type C berm (8061050)LF372$50.00$57.10$45.50$4.11$21.40
0250MGS guardrail (6061060)LF275$30.00$28.00$43.74$34.70$37.00
0260MGS bridge approach transition section (regular/no curb) (6061069)EACH4$4,045.00$2,760.00$4,921.15$4,772.50$4,850.00
0270Type A crashworthy end terminal (MASH) (6063014)EACH4$3,725.00$3,030.00$4,044.07$4,313.50$3,420.00
0280Class 1 excavation (2061000)CY50$50.00$91.00$37.46$13.47$74.81
0290Removal of bridges (2160500)LS1$46,700$31,200$51,949$49,690$53,478
0300Bridge approach slab (minor road) (5031011A)SY109$185.00$167.00$121.87$231.73$197.32
0310Galvanized structural steel piles (12 in) (7021212)LF200$135.00$170.50$151.19$165.53$117.61
0320Galvanized cast-in-place concrete piles (20 in) (7021320)LF320$280.00$521.00$298.36$341.76$298.18
0330Pre-bore for piling (7026000)LF467$190.00$221.50$233.99$393.36$298.96
0340Pile point reinforcement (7027000)EACH8$154.00$149.50$149.49$662.11$165.00
0350Pile point reinforcement (7027000)EACH10$588.00$917.50$1,039.96$868.60$770.00
0360Class B concrete (substructure) (7032003)CY36.20$1,900.00$1,730.00$1,901.98$1,729.27$2,913.80
0370Type D barrier (7034219A)LF327$160.00$153.00$160.74$155.90$161.68
0380Slab on concrete beam (7034222)SY452$507.00$531.50$587.62$483.20$645.42
039021 in., prestressed concrete spread box beam (7056049)LF448$465.00$515.50$550.90$542.48$591.17
0400Reinforcing steel (bridges) (7061060)LB3,710$2.30$2.30$2.48$2.86$2.84
0410Slab drain (7123610)EACH26$700.00$561.00$491.77$425.19$657.00
0420Vertical drain at end bents (7151001)EACH2$3,700.00$2,860.00$6,329.15$2,551.73$4,636.00
0430Plain neoprene bearing pad (7161000)EACH6$320.00$409.50$278.68$254.90$274.00
0440Laminated neoprene bearing pad (7161002)EACH12$400.00$440.00$245.26$291.62$437.00
MoDOT contract 260515-G09: unit prices by line

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from MoDOT's tabulation for this contract. MoDOT letting tabulation PDFs (vendor ranking and bid tabulation), January 2020 to October 2026. About one bid in eight did not match its published total and is left out. Item codes from before mid 2021 are written in the current MoDOT format so one item groups across years.

Every contract let that day: MoDOT letting of May 15, 2026. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy