MoDOT contract 251114-G07 bid tabulation
J7S3379, JSR0172-ROUTES 43, 59-MCDONALD COUNTY. Let by Missouri DOT on November 14, 2025, Mcdonald, Southwest. 4 bids received; low bid $5,125,000 by West Plains Bridge & Grading, LLC.
- Owner
- Missouri DOT
- Letting
- 14 NOV 2025
- Pay items
- 78
- Data through
- 16 OCT 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | West Plains Bridge & Grading, LLC | $5,125,000 | Low |
| 2 | Hartman and Company, Inc. | $5,340,001 | +4.0% |
| 3 | Louis-Company, LLC | $5,769,758 | +13% |
| 4 | Crossland Construction Company Inc. | $5,937,735 | +16% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. West Plains Bridge & Grading, LLC | 2. Hartman and Company, Inc. | 3. Louis-Company, LLC | 4. Crossland Construction Company Inc. |
|---|---|---|---|---|---|---|---|
| 0010 | Clearing and grubbing (2013000) | ACRE | 1 | $5,500.00 | $9,500.00 | $14,991 | $78,565 |
| 0020 | Removal of improvements (2022010) | LS | 1 | $20,000 | $29,900 | $13,954 | $28,151 |
| 0030 | Unclassified excavation (2035000) | CY | 4,849 | $28.00 | $11.50 | $19.49 | $18.01 |
| 0040 | Compacting embankment (2036000) | CY | 1,601 | $2.75 | $12.70 | $8.44 | $11.48 |
| 0050 | Compacting in cut (2037075) | STA | 7.50 | $1,175.00 | $1,250.00 | $1,146.36 | $1,057.00 |
| 0060 | Linear grading class 2 (2072000) | STA | 7.50 | $950.00 | $4,090.00 | $1,750.33 | $2,330.00 |
| 0070 | Furnishing rock fill (2142000) | CY | 8,440 | $48.00 | $60.30 | $72.03 | $45.86 |
| 0080 | Placing rock fill (2143000) | CY | 8,440 | $10.00 | $5.70 | $19.84 | $13.12 |
| 0090 | Shaping slopes, class III (2153000) | 100F | 2 | $1,450.00 | $3,640.00 | $2,051.18 | $2,581.00 |
| 0100 | Type 1 aggregate for base (6 in. thick) (3040163) | SY | 2,005 | $15.50 | $18.90 | $15.49 | $17.86 |
| 0110 | Misc.optional pavement (4019905) | SY | 2,005 | $67.00 | $61.30 | $76.38 | $66.56 |
| 0120 | Misc.furnishing fhwa type VI rock blanket (6119907) | CY | 11,592 | $61.25 | $57.40 | $94.45 | $74.43 |
| 0130 | Misc.placing fwha type VI rock blanket (6119907) | CY | 11,592 | $14.00 | $12.50 | $11.96 | $18.04 |
| 0140 | Misc.placing river gravel (6119907) | CY | 1,798 | $12.94 | $17.10 | $27.38 | $35.97 |
| 0150 | Misc.skimming river gravel (6119907) | CY | 1,798 | $18.62 | $15.40 | $27.38 | $29.47 |
| 0160 | Construction signs (6161005) | SF | 744 | $8.00 | $8.00 | $9.80 | $8.63 |
| 0170 | Buoys (boats keep out) (6161012) | EACH | 8 | $680.00 | $933.00 | $306.24 | $1,062.00 |
| 0180 | Buoys (no wake) (6161013) | EACH | 8 | $680.00 | $933.00 | $306.24 | $1,062.00 |
| 0190 | Special sign assembly (boats keep out) (6161014) | EACH | 4 | $2,500.00 | $2,000.00 | $1,959.96 | $1,725.00 |
| 0200 | Channelizer (trim-line) (6161025) | EACH | 50 | $18.00 | $40.00 | $22.05 | $19.00 |
| 0210 | Type 3 moveable barricade (6161030) | EACH | 8 | $190.00 | $225.00 | $208.25 | $183.00 |
| 0220 | Changeable message sign with communication interface, contractor furnished retained (6161099) | EACH | 4 | $4,950.00 | $5,500.00 | $5,512.38 | $4,852.00 |
| 0230 | Mobilization (6181000) | LS | 1 | $306,011 | $547,200 | $103,087 | $436,641 |
| 0240 | Additional mobilization for seedingmisc (6181020) | EACH | 5 | $600.00 | $600.00 | $600.00 | $600.00 |
| 0250 | 4 in. white class 1 pavement marking paint (18-mil, type P beads) (6206000D) | LF | 2,459 | $0.25 | $0.70 | $0.31 | $0.27 |
| 0260 | 4 in. yellow class 1 pavement marking paint (18-mil, type P beads) (6206001D) | LF | 1,740 | $0.25 | $0.70 | $0.31 | $0.27 |
| 0270 | Permanent erosion control geotextile (6240103A) | SY | 6,871 | $2.75 | $3.90 | $3.67 | $2.05 |
| 0280 | Contractor furnished surveying and staking (6274000) | LS | 1 | $60,000 | $7,700.00 | $42,874 | $45,696 |
| 0290 | Mulching (8025006) | ACRE | 4 | $1,500.00 | $1,500.00 | $1,837.46 | $2,022.00 |
| 0300 | Seeding - cool season grasses (8051000A) | ACRE | 3.60 | $2,900.00 | $2,900.00 | $3,552.43 | $3,127.00 |
| 0310 | Rock ditch check (8061005) | LF | 84 | $16.00 | $38.90 | $42.87 | $16.02 |
| 0320 | Sediment removal (8061016) | CY | 26 | $6.00 | $65.90 | $63.11 | $67.90 |
| 0330 | Temporary seeding (8061017) | ACRE | 0.40 | $2,000.00 | $2,000.00 | $2,449.95 | $2,156.00 |
| 0340 | Silt fence (8061019) | LF | 1,467 | $3.00 | $3.00 | $3.67 | $3.23 |
| 0350 | Type C berm (8061050) | LF | 500 | $35.00 | $99.40 | $28.79 | $17.83 |
| 0360 | MGS guardrail (6061060) | LF | 400 | $28.50 | $26.00 | $55.43 | $48.79 |
| 0370 | MGS bridge approach transition section (regular/no curb) (6061069) | EACH | 4 | $4,150.00 | $3,800.00 | $3,895.42 | $3,428.00 |
| 0380 | Type A crashworthy end terminal (MASH) (6063014) | EACH | 4 | $3,500.00 | $3,200.00 | $4,073.04 | $3,585.00 |
| 0390 | Trenching type I (9105001) | LF | 610 | $17.00 | $21.00 | $25.72 | $22.64 |
| 0400 | Conduit, 4 in., rigid, in trench (9105202) | LF | 610 | $16.50 | $15.00 | $18.37 | $16.17 |
| 0410 | Misc.installing tier 22 fiber optic cable vault (9109902) | EACH | 2 | $1,595.00 | $1,780.00 | $2,174.33 | $1,986.00 |
| 0420 | Class 1 excavation (2061000) | CY | 80 | $48.00 | $77.00 | $41.02 | $72.78 |
| 0430 | Removal of bridges (2160500) | LS | 1 | $193,100 | $138,000 | $340,416 | $310,711 |
| 0440 | Bridge approach slab (minor road) (5031011A) | SY | 126 | $175.00 | $135.50 | $226.28 | $303.99 |
| 0450 | Drilled shafts (4 FT. 6 in. dia.) (7011107) | LF | 56 | $1,150.00 | $1,040.00 | $1,728.26 | $1,651.90 |
| 0460 | Rock sockets (4 FT 0 in. dia.) (7011206) | LF | 72 | $1,400.00 | $1,330.00 | $936.40 | $1,438.59 |
| 0470 | Video camera inspection (7011300) | EACH | 6 | $225.00 | $1,050.00 | $61.25 | $1,132.00 |
| 0480 | Foundation inspection holes (7011400) | LF | 132 | $190.00 | $148.00 | $189.87 | $159.56 |
| 0490 | Sonic logging testing (7011600) | EACH | 6 | $2,700.00 | $1,040.00 | $1,041.23 | $1,123.00 |
| 0500 | Galvanized structural steel piles (12 in) (7021212) | LF | 300 | $135.00 | $140.00 | $114.08 | $147.35 |
| 0510 | Pile point reinforcement (7027000) | EACH | 10 | $300.00 | $158.00 | $153.12 | $140.00 |
| 0520 | Class B concrete (substructure) (7032003) | CY | 138.80 | $1,500.00 | $1,540.00 | $1,468.99 | $1,998.84 |
| 0530 | Type D barrier (7034219A) | LF | 919 | $130.00 | $139.50 | $157.04 | $132.65 |
| 0540 | Slab on concrete NU-girder (7034221) | SY | 1,494 | $500.00 | $506.00 | $459.40 | $525.00 |
| 0550 | NU 43, prestressed concrete NU-girder (7056022) | LF | 1,740 | $460.00 | $520.50 | $484.07 | $495.97 |
| 0560 | Reinforcing steel (bridges) (7061060) | LB | 39,900 | $2.40 | $2.00 | $1.06 | $1.65 |
| 0570 | Conduit system on structure (7071000) | LS | 1 | $9,000.00 | $13,300 | $16,231 | $14,824 |
| 0580 | Slab drain (7123610) | EACH | 80 | $535.00 | $523.50 | $483.84 | $791.00 |
| 0590 | Vertical drain at end bents (7151001) | EACH | 2 | $1,765.00 | $3,570.00 | $2,537.01 | $5,644.00 |
| 0600 | Plain neoprene bearing pad (7161000) | EACH | 8 | $175.00 | $390.50 | $121.27 | $258.00 |
| 0610 | Laminated neoprene bearing pad (7161002) | EACH | 24 | $250.00 | $403.00 | $160.47 | $292.00 |
| 0620 | Removal of improvements (2022010) | LS | 1 | $1,500.00 | $27,100 | $3,771.87 | $31,668 |
| 0630 | Misc.linear grading class 2 for shoulders (2129900) | 100F | 11 | $2,220.00 | $500.00 | $1,790.11 | $3,099.54 |
| 0640 | Gravel (A) or crushed stone (B) (3105002) | TON | 4 | $110.00 | $110.00 | $265.76 | $605.28 |
| 0650 | Paved ditch (6091060) | SY | 1,685.90 | $105.00 | $93.00 | $102.72 | $110.70 |
| 0660 | Construction signs (6161005) | SF | 312 | $6.00 | $9.00 | $7.35 | $6.47 |
| 0670 | Channelizer (trim-line) (6161025) | EACH | 55 | $8.00 | $20.00 | $9.80 | $8.63 |
| 0680 | Changeable message sign with communication interface, contractor furnished retained (6161099) | EACH | 2 | $1,100.00 | $1,500.00 | $1,224.98 | $1,078.14 |
| 0690 | Mobilization (6181000) | LS | 1 | $80,000 | $28,900 | $134,551 | $31,978 |
| 0700 | Pavement edge treatment (6191000) | LF | 1,106 | $4.50 | $7.00 | $8.95 | $22.90 |
| 0710 | Contractor furnished surveying and staking (6274000) | LS | 1 | $7,500.00 | $7,700.00 | $12,250 | $3,967.54 |
| 0720 | 18 in. pipe group C (7250418) | LF | 32 | $92.00 | $250.00 | $170.20 | $123.07 |
| 0730 | Rock ditch check (8061005) | LF | 160 | $16.00 | $25.00 | $42.87 | $17.22 |
| 0740 | Sediment removal (8061016) | CY | 16 | $6.00 | $200.00 | $102.56 | $110.34 |
| 0750 | 2.5 in. PSST post - 12 GA. (9031280) | LF | 32 | $30.00 | $30.00 | $16.05 | $14.12 |
| 0760 | Concrete post anchor for 2.5 in. PSST. - 7 GA. (9031285) | EACH | 2 | $250.00 | $250.00 | $489.99 | $431.00 |
| 0770 | SH-flat sheet (9035004A) | SF | 18 | $30.00 | $30.00 | $22.42 | $19.41 |
| 0780 | SHF-flat sheet fluorescent (9035069A) | SF | 13 | $30.00 | $30.00 | $24.84 | $21.81 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from MoDOT's tabulation for this contract. MoDOT letting tabulation PDFs (vendor ranking and bid tabulation), January 2020 to October 2026. About one bid in eight did not match its published total and is left out. Item codes from before mid 2021 are written in the current MoDOT format so one item groups across years.
Every contract let that day: MoDOT letting of November 14, 2025. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.