MoDOT contract 260515-G06 bid tabulation
JSR0110-ROUTE 7-BENTON COUNTY. Let by Missouri DOT on May 15, 2026, Benton, Southwest. 4 bids received; low bid $3,760,000 by Hartman and Company, Inc..
- Owner
- Missouri DOT
- Letting
- 15 MAY 2026
- Pay items
- 118
- Data through
- 16 OCT 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Hartman and Company, Inc. | $3,760,000 | Low |
| 2 | Capital Paving & Construction, LLC | $3,865,455 | +3.0% |
| 3 | RL Persons Construction, Inc. | $4,479,995 | +19% |
| 4 | Emery Sapp & Sons, Inc. | $4,667,567 | +24% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Hartman and Company, Inc. | 2. Capital Paving & Construction, LLC | 3. RL Persons Construction, Inc. | 4. Emery Sapp & Sons, Inc. |
|---|---|---|---|---|---|---|---|
| 0010 | Clearing and grubbing (2013000) | ACRE | 1 | $6,500.00 | $12,569 | $7,200.00 | $12,133 |
| 0020 | Removal of improvements (2022010) | LS | 1 | $172,000 | $208,401 | $120,500 | $238,371 |
| 0030 | Unclassified excavation (2035000) | CY | 12,464 | $9.00 | $19.46 | $31.00 | $47.54 |
| 0040 | Compacting embankment (2036000) | CY | 5,807 | $10.00 | $7.45 | $4.50 | $5.01 |
| 0050 | Compacting in cut (2037075) | STA | 19 | $963.00 | $3,352.34 | $1,300.00 | $792.16 |
| 0060 | Class 3 excavation (2063000) | CY | 778 | $35.00 | $32.65 | $93.50 | $8.27 |
| 0070 | Linear grading class 1 (2071000) | STA | 7.90 | $2,000.00 | $1,619.37 | $1,715.00 | $1,271.90 |
| 0080 | Type 5 aggregate for base (4 in. thick) (3040504) | SY | 5,958.90 | $15.10 | $8.06 | $11.95 | $9.96 |
| 0090 | Type 5 aggregate for base (6 in. thick) (3040506) | SY | 14,040 | $15.50 | $12.41 | $15.50 | $16.64 |
| 0100 | Bituminous pavement mixture PG64-22, (BP-1) (4011209) | TON | 638.80 | $150.00 | $156.75 | $185.00 | $167.62 |
| 0110 | Bituminous pavement mixture PG64-22 (base) (4013000) | TON | 1,882.60 | $138.00 | $144.21 | $170.00 | $154.21 |
| 0120 | Tack coat (4071005) | GAL | 590.90 | $3.80 | $3.97 | $4.65 | $4.25 |
| 0130 | Concrete pavement ( 8 in. non-reinf) (5021108) | SY | 318.90 | $89.70 | $104.03 | $125.00 | $103.89 |
| 0140 | Misc.10 in. red tint concrete pavement (5029905) | SY | 61.80 | $229.00 | $190.52 | $182.00 | $184.88 |
| 0150 | Misc.8 in. red tint concrete pavement truck apron (5029905) | SY | 1,727.70 | $119.50 | $132.75 | $142.00 | $125.08 |
| 0160 | Misc.concrete pavement (10 in. non-reinforced 15 FT. joints, roundabout (5029905) | SY | 10,837.50 | $107.50 | $103.25 | $115.00 | $117.15 |
| 0170 | Pipe collar, type A (6044011) | EACH | 1 | $2,920.00 | $2,367.05 | $850.00 | $4,656.83 |
| 0180 | Truncated domes (6081012) | SF | 60 | $32.30 | $35.36 | $35.00 | $28.84 |
| 0190 | 8 in. concrete median strip (6083008) | SY | 903.30 | $112.00 | $136.59 | $115.00 | $117.75 |
| 0200 | Curb and gutter type B (6091052) | LF | 1,652 | $41.10 | $48.45 | $60.00 | $44.24 |
| 0210 | Integral curb (over 6 in. height) type A (6092021) | LF | 215 | $32.80 | $25.43 | $30.85 | $3.91 |
| 0220 | Rock lining (6097000) | CY | 8 | $226.50 | $136.99 | $135.00 | $233.16 |
| 0230 | Misc.truck apron curb (6099903) | LF | 396 | $25.50 | $53.95 | $27.50 | $0.62 |
| 0240 | Furnishing type 2 rock blanket (6113020) | CY | 1,438 | $42.20 | $35.90 | $72.95 | $26.10 |
| 0250 | Placing type 2 rock blanket (6113040) | CY | 1,438 | $20.00 | $15.00 | $20.20 | $25.89 |
| 0260 | Impact attenuator 55 MPH (sand barrel array) (6122012) | EACH | 2 | $2,400.00 | $2,507.97 | $2,930.00 | $2,681.91 |
| 0270 | Replacement sand barrel (6122020) | EACH | 4 | $200.00 | $209.00 | $245.00 | $223.49 |
| 0280 | Manhole frame and cover, type 3 (6143013) | EACH | 5 | $1,080.00 | $1,552.37 | $660.00 | $674.11 |
| 0290 | Construction signs (6161005) | SF | 1,150 | $8.00 | $8.36 | $13.00 | $8.94 |
| 0300 | Channelizer (trim-line) (6161025) | EACH | 185 | $45.00 | $47.02 | $75.00 | $50.29 |
| 0310 | Type 3 moveable barricade (6161030) | EACH | 86 | $150.00 | $156.75 | $185.00 | $167.62 |
| 0320 | Direction indicator barricade (6161033) | EACH | 60 | $90.00 | $94.05 | $110.00 | $100.57 |
| 0330 | Flashing arrow panel (6161040) | EACH | 6 | $1,200.00 | $1,253.99 | $1,465.00 | $1,340.95 |
| 0340 | Sequential flashing warning light (6161055) | EACH | 60 | $60.00 | $62.70 | $73.25 | $67.05 |
| 0350 | Changeable message sign with communication interface, contractor furnished retained (6161099) | EACH | 4 | $6,000.00 | $6,269.93 | $7,325.00 | $6,704.76 |
| 0360 | Temporary long-term rumble strips (6162002) | EACH | 8 | $1,200.00 | $1,253.99 | $1,465.00 | $1,340.95 |
| 0370 | Temporary traffic barrier, contractor furnished retained (6173600D) | LF | 620 | $28.00 | $51.79 | $36.25 | $31.29 |
| 0380 | Mobilization (6181000) | LS | 1 | $192,563 | $146,636 | $241,748 | $376,186 |
| 0390 | Additional mobilization for seeding (6181020) | EACH | 4 | $600.00 | $600.00 | $600.00 | $600.00 |
| 0400 | Preformed thermoplastic pavement marking, 24 in. white (6200015) | LF | 264 | $20.00 | $20.90 | $24.40 | $22.35 |
| 0410 | Preformed thermoplastic pavement marking, 24 in. yellow (6200018) | LF | 91 | $20.00 | $20.90 | $24.40 | $22.35 |
| 0420 | Preformed thermoplastic pavement marking, 24 in. X 36 in., yield line triangle (6200042A) | EACH | 33 | $110.00 | $114.95 | $135.00 | $122.92 |
| 0430 | Temporary removable marking tape 4 in., white (6205301B) | LF | 3,680 | $2.00 | $2.09 | $2.50 | $2.23 |
| 0440 | Temporary removable marking tape 4 in., yellow (6205303B) | LF | 3,680 | $2.00 | $2.09 | $2.50 | $2.23 |
| 0450 | 4 in. yellow class 2 pavement marking paint (25-mil, type L beads) (6205901B) | LF | 3,486 | $0.30 | $0.31 | $0.40 | $0.34 |
| 0460 | 6 in. white class 2 pavement marking paint (25-mil, type L beads) (6205902B) | LF | 4,184 | $0.40 | $0.42 | $0.50 | $0.45 |
| 0470 | 6 in. yellow class 2 pavement marking paint (25-mil, type L beads) (6205903B) | LF | 2,213 | $0.40 | $0.42 | $0.50 | $0.45 |
| 0480 | 12 in. white class 2 pavement marking paint (25-mil, type L beads) (6205906B) | LF | 57 | $3.00 | $3.13 | $3.75 | $3.35 |
| 0490 | Pavement marking removal (6207001) | LF | 7,352 | $0.50 | $0.52 | $0.65 | $0.56 |
| 0500 | Misc.island marking face & top of curb, white (6209903) | LF | 198 | $1.50 | $1.57 | $1.85 | $1.68 |
| 0510 | Misc.island marking face & top of curb, yellow (6209903) | LF | 1,710 | $1.50 | $1.57 | $1.85 | $1.68 |
| 0520 | Permanent erosion control geotextile (6240103A) | SY | 2,023 | $4.80 | $3.57 | $5.25 | $4.52 |
| 0530 | Misc.transverse rumble strips (6269905) | SY | 100 | $120.00 | $105.54 | $120.00 | $390.69 |
| 0540 | Contractor furnished surveying and staking (6274000) | LS | 1 | $38,900 | $30,305 | $27,000 | $21,285 |
| 0550 | 15 in. pipe group C (7250415) | LF | 311 | $62.80 | $62.66 | $115.00 | $80.47 |
| 0560 | 15 in. pipe group A (7261015) | LF | 475 | $76.50 | $59.57 | $100.55 | $123.95 |
| 0570 | 24 in. pipe group A (7261024) | LF | 56 | $99.50 | $83.47 | $160.00 | $113.15 |
| 0580 | 30 in. pipe group A (7261030) | LF | 23 | $253.50 | $187.85 | $190.00 | $222.21 |
| 0590 | Precast concrete drop inlet 5 FT X 3 FT (7311053) | FT | 26 | $1,100.00 | $1,015.96 | $765.50 | $1,156.33 |
| 0600 | 15 in. or allowed substitute group A flared end section (7320615A) | EACH | 3 | $666.50 | $391.48 | $1,020.00 | $496.89 |
| 0610 | 24 in. or allowed substitute group A flared end section (7320624A) | EACH | 2 | $969.50 | $592.31 | $2,445.00 | $694.49 |
| 0620 | 30 in. or allowed substitute group A flared end section (7320630A) | EACH | 1 | $1,870.00 | $1,010.87 | $3,685.00 | $1,032.02 |
| 0630 | 15 in. or allowed substitute group C flared end section (7320815A) | EACH | 6 | $849.00 | $313.87 | $1,020.00 | $542.24 |
| 0640 | Mulching (8025006) | ACRE | 4.10 | $800.00 | $835.99 | $680.00 | $893.96 |
| 0650 | Seeding - cool season grasses (8051000A) | ACRE | 2.90 | $2,700.00 | $2,821.47 | $3,300.00 | $3,017.15 |
| 0660 | Sediment trap excavation (8061003) | CY | 20 | $86.30 | $48.72 | $20.25 | $67.04 |
| 0670 | Sediment trap rock (8061004) | CY | 20 | $85.80 | $100.82 | $120.00 | $106.15 |
| 0680 | Alternate ditch check (8061006) | LF | 252 | $10.00 | $10.45 | $12.25 | $11.17 |
| 0690 | Curb inlet check (8061007A) | EACH | 5 | $50.00 | $52.25 | $61.05 | $55.87 |
| 0700 | Sediment removal (8061016) | CY | 65 | $33.10 | $92.99 | $46.50 | $49.42 |
| 0710 | Temporary seeding (8061017) | ACRE | 1.20 | $900.00 | $940.49 | $1,100.00 | $1,005.72 |
| 0720 | Silt fence (8061019) | LF | 1,713 | $3.00 | $3.13 | $3.70 | $3.35 |
| 0730 | Type 3 turf reinforcement mat (8064130) | SY | 1,976 | $4.00 | $4.18 | $4.90 | $4.47 |
| 0740 | Type 3B erosion control blanket (8064140) | SY | 10,667 | $1.50 | $1.57 | $1.85 | $1.68 |
| 0750 | Relocated pole (9011010) | EACH | 2 | $2,000.00 | $2,084.75 | $2,450.00 | $2,229.33 |
| 0760 | Lighting pole, 30 FT. or 9.0 M, type at (9011030) | EACH | 10 | $3,970.00 | $4,148.61 | $4,900.00 | $4,436.32 |
| 0770 | Bracket arm, 10 FT. or 3.0 M (9011110) | EACH | 4 | $1,190.00 | $1,238.31 | $1,445.00 | $1,324.19 |
| 0780 | Bracket arm, 15 FT. or 4.6 M (9011115) | EACH | 6 | $1,280.00 | $1,332.36 | $1,560.00 | $1,424.76 |
| 0790 | Luminaire, LED-A (9011311) | EACH | 10 | $435.00 | $454.57 | $535.00 | $486.09 |
| 0800 | Luminaire, LED-B (9011312) | EACH | 4 | $520.00 | $543.39 | $635.00 | $581.08 |
| 0810 | Base mounted control station 240 volt - 4 circuit (9012230) | EACH | 1 | $14,100 | $14,776 | $17,250 | $15,801 |
| 0820 | Conduit, 2 in. rigid, in trench (9013002) | LF | 45 | $26.50 | $27.69 | $32.50 | $29.61 |
| 0830 | Conduit, 4 in. rigid, pushed (9014004) | LF | 228 | $46.00 | $48.07 | $56.15 | $51.40 |
| 0840 | Trenching type II (9015020) | LF | 1,789 | $16.30 | $17.03 | $19.90 | $18.21 |
| 0850 | Pull box, concrete, standard (9016120) | EACH | 7 | $3,600.00 | $3,756.74 | $4,390.00 | $4,017.27 |
| 0860 | Cable, 2 AWG 1 conductor (9017002) | LF | 207 | $5.10 | $5.28 | $6.20 | $5.64 |
| 0870 | Cable, 10 AWG 1 conductor, pole and bracket (9017110) | LF | 960 | $1.80 | $1.88 | $2.20 | $2.01 |
| 0880 | Cable-conduit, 1 in., 2 conductors and 1 bare neutral, 4 AWG (9017402) | LF | 2,450 | $11.00 | $11.49 | $13.50 | $12.29 |
| 0890 | Pole foundation (30 FT. or 9.0 M mounting height) (9018230) | EACH | 11 | $3,310.00 | $3,458.91 | $4,045.00 | $3,698.79 |
| 0900 | Power supply assembly, type 2, 240/120 volt service, lighting only (9018612) | EACH | 1 | $8,700.00 | $9,075.73 | $10,500 | $9,705.15 |
| 0910 | Signal head, type 3S (9020213) | EACH | 2 | $2,140.00 | $2,231.05 | $2,610.00 | $2,385.77 |
| 0920 | Signal head, type 3B (9020513) | EACH | 4 | $2,290.00 | $2,387.80 | $2,800.00 | $2,553.39 |
| 0930 | Signal head, type 1S, pedestrian (9020811) | EACH | 2 | $885.00 | $924.82 | $1,080.00 | $988.96 |
| 0940 | SH-flat sheet - signal sign (9020833) | SF | 54 | $21.20 | $22.10 | $26.00 | $23.63 |
| 0950 | Signal sign, mounting hardware (9020834) | EACH | 6 | $287.50 | $300.43 | $355.00 | $321.27 |
| 0960 | Post, type C, 30 FT. arm or 9.1 M arm (9023230) | EACH | 1 | $16,500 | $17,268 | $20,250 | $18,466 |
| 0970 | Post, type C, 40 FT. arm or 12.2 M arm (9023240) | EACH | 1 | $19,100 | $19,975 | $23,500 | $21,360 |
| 0980 | Accessible pedestrian signal (9024921) | EACH | 2 | $1,050.00 | $1,097.24 | $1,285.00 | $1,173.34 |
| 0990 | Conduit, 2 in., trench with tracer wire (9025200) | LF | 60 | $26.80 | $28.01 | $32.75 | $29.95 |
| 1000 | Conduit, 3 in., trench with tracer wire (9025300) | LF | 90 | $28.20 | $29.42 | $34.40 | $31.46 |
| 1010 | Conduit, 3 in., pushed with tracer wire (9027300) | LF | 110 | $49.50 | $51.73 | $60.50 | $55.31 |
| 1020 | Cable, 2 AWG 1 conductor, power (9028202) | LF | 230 | $5.10 | $5.28 | $6.20 | $5.64 |
| 1030 | Cable, 16 AWG 2 conductor (9028308) | LF | 340 | $1.80 | $1.88 | $2.20 | $2.01 |
| 1040 | Cable, 16 AWG 5 conductor (9028310) | LF | 350 | $2.40 | $2.46 | $2.90 | $2.63 |
| 1050 | Cable, 16 AWG 7 conductor (9028311) | LF | 810 | $2.70 | $2.82 | $3.30 | $3.02 |
| 1060 | Wire, 6 AWG, solid neutral (9028400) | LF | 220 | $2.70 | $2.82 | $3.30 | $3.02 |
| 1070 | Power supply assembly, type 2 (9028620) | EACH | 1 | $10,400 | $10,831 | $12,500 | $11,582 |
| 1080 | Pull box, preformed class 2 (9028811) | EACH | 2 | $2,090.00 | $2,178.80 | $2,550.00 | $2,329.90 |
| 1090 | Pull box, concrete, standard (9028820) | EACH | 1 | $3,600.00 | $3,756.74 | $4,390.00 | $4,017.27 |
| 1100 | Pull box, concrete, double, type A (9028821) | EACH | 1 | $5,700.00 | $5,909.41 | $6,910.00 | $6,319.24 |
| 1110 | Base, concrete (9029100) | CY | 7.60 | $1,990.00 | $2,079.53 | $2,430.00 | $2,223.74 |
| 1120 | Misc.2070 controller (9029902) | EACH | 1 | $38,200 | $39,866 | $46,500 | $42,631 |
| 1130 | 2.5 in. PSST post - 12 GA. (9031280) | LF | 1,360 | $12.40 | $12.96 | $15.15 | $13.86 |
| 1140 | Driven post anchor for 2.5 in. PSST - 7 GA. (9031281A) | EACH | 67 | $320.00 | $334.40 | $395.00 | $357.59 |
| 1150 | Concrete post anchor for 2.5 in. PSST. - 7 GA. (9031285) | EACH | 18 | $440.00 | $459.80 | $550.00 | $491.68 |
| 1160 | SH-flat sheet (9035004A) | SF | 141 | $20.70 | $21.63 | $25.00 | $23.13 |
| 1170 | ST-structural (9035011A) | SF | 54 | $32.80 | $34.28 | $40.05 | $36.65 |
| 1180 | SHF-flat sheet fluorescent (9035069A) | SF | 673 | $22.50 | $23.51 | $27.50 | $25.14 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from MoDOT's tabulation for this contract. MoDOT letting tabulation PDFs (vendor ranking and bid tabulation), January 2020 to October 2026. About one bid in eight did not match its published total and is left out. Item codes from before mid 2021 are written in the current MoDOT format so one item groups across years.
Every contract let that day: MoDOT letting of May 15, 2026. Compiled by Mirage Metrics.