MoDOT contract 251017-G04 bid tabulation
J8S3158 - OR 65 - GREENE COUNTY. Let by Missouri DOT on October 17, 2025, Greene, Southwest. 2 bids received; low bid $2,780,000 by Hartman and Company, Inc..
- Owner
- Missouri DOT
- Letting
- 17 OCT 2025
- Pay items
- 75
- Data through
- 16 OCT 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Hartman and Company, Inc. | $2,780,000 | Low |
| 2 | Louis-Company, LLC | $2,867,826 | +3.0% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Hartman and Company, Inc. | 2. Louis-Company, LLC |
|---|---|---|---|---|---|
| 0010 | Signet dbe reporting (1081000) | LS | 1 | $1,000.00 | $1,000.00 |
| 0020 | 24 in. survey pin (1091032) | EACH | 10 | $200.00 | $495.33 |
| 0030 | Clearing and grubbing (2013000) | ACRE | 1 | $10,400 | $15,154 |
| 0040 | Removal of improvements (2022010) | LS | 1 | $30,200 | $17,790 |
| 0050 | Unclassified excavation (2035000) | CY | 6,983 | $7.00 | $20.00 |
| 0060 | Embankment in place (2035500) | CY | 4,615 | $32.10 | $18.00 |
| 0070 | Compacting embankment (2036000) | CY | 5,264 | $8.50 | $4.33 |
| 0080 | Compacting in cut (2037075) | STA | 12.60 | $1,950.00 | $821.45 |
| 0090 | Class 3 excavation (2063000) | CY | 42 | $160.00 | $29.62 |
| 0100 | Type 1 aggregate for base (4 in. thick) (3040143) | SY | 541 | $14.80 | $16.90 |
| 0110 | Type 5 aggregate for base (4 in. thick) (3040504) | SY | 2,172 | $13.50 | $13.83 |
| 0120 | Gravel (A) or crushed stone (B) (3105002) | TON | 24.50 | $182.50 | $83.89 |
| 0130 | Misc.optional pavement (4019905) | SY | 2,126.30 | $47.80 | $66.87 |
| 0140 | Concrete curb ramp (6081010) | SY | 98.50 | $175.50 | $189.06 |
| 0150 | Truncated domes (6081012) | SF | 54 | $68.50 | $80.01 |
| 0160 | Concrete sidewalk, 4 in. (6086004) | SY | 441.80 | $70.00 | $81.00 |
| 0170 | Curb and gutter type B (6091052) | LF | 37 | $159.50 | $200.00 |
| 0180 | Integral curb (over 6 in. height) type A (6092021) | LF | 606 | $55.90 | $90.53 |
| 0190 | Furnishing type 1 rock ditch liner (6096010A) | CY | 5 | $81.40 | $182.78 |
| 0200 | Placing type 1 rock ditch liner (6096041) | CY | 5 | $336.50 | $165.88 |
| 0210 | Rock lining (6097000) | CY | 2 | $942.50 | $1,083.27 |
| 0220 | Misc.modified paved ditch W/ steel plate (6099902) | EACH | 1 | $14,700 | $26,460 |
| 0230 | Furnishing type 2 rock blanket (6113020) | CY | 722 | $60.60 | $75.95 |
| 0240 | Placing type 2 rock blanket (6113040) | CY | 722 | $25.80 | $22.98 |
| 0250 | Slope protection (6116010A) | SY | 2 | $2,480.00 | $3,967.75 |
| 0260 | Construction signs (6161005) | SF | 1,179 | $6.50 | $9.91 |
| 0270 | Channelizer (trim-line) (6161025) | EACH | 50 | $22.80 | $19.81 |
| 0280 | Type 3 moveable barricade (6161030) | EACH | 10 | $190.00 | $191.94 |
| 0290 | Changeable message sign with communication interface, contractor furnished retained (6161099) | EACH | 6 | $5,800.00 | $5,572.44 |
| 0300 | Misc.ADA compliant moveable barricade (6169902) | EACH | 20 | $100.00 | $191.94 |
| 0310 | Mobilization (6181000) | LS | 1 | $269,733 | $394,943 |
| 0320 | 4 in. white class 1 pavement marking paint (18-mil, type P beads) (6206000D) | LF | 1,313 | $0.60 | $0.50 |
| 0330 | 4 in. yellow class 1 pavement marking paint (18-mil, type P beads) (6206001D) | LF | 1,910 | $0.60 | $0.50 |
| 0340 | Permanent erosion control geotextile (6240103A) | SY | 1,606 | $5.70 | $2.79 |
| 0350 | Contractor furnished surveying and staking (6274000) | LS | 1 | $14,100 | $37,150 |
| 0360 | 12 in. pipe group C (7250412) | LF | 17 | $274.50 | $271.32 |
| 0370 | 18 in. pipe group C (7250418) | LF | 66 | $187.00 | $105.78 |
| 0380 | 18 in. or allowed substitute group C flared end section (7320818A) | EACH | 2 | $977.00 | $1,485.59 |
| 0390 | Mulching (8025006) | ACRE | 2.80 | $5,100.00 | $2,228.98 |
| 0400 | Seeding - cool season grasses (8051000A) | ACRE | 1.40 | $4,700.00 | $4,148.38 |
| 0410 | Rock ditch check (8061005) | LF | 132 | $18.70 | $43.34 |
| 0420 | Alternate ditch check (8061006) | LF | 92 | $14.10 | $22.29 |
| 0430 | Curb inlet check (8061007A) | EACH | 1 | $252.50 | $1,857.48 |
| 0440 | Sediment removal (8061016) | CY | 41 | $78.70 | $40.46 |
| 0450 | Temporary seeding (8061017) | ACRE | 1.40 | $2,530.00 | $1,857.49 |
| 0460 | Silt fence (8061019) | LF | 1,760 | $3.20 | $3.71 |
| 0470 | MGS guardrail (6061060) | LF | 112.50 | $38.00 | $47.06 |
| 0480 | MGS bridge approach transition section (extended curb) (6061068) | EACH | 2 | $4,000.00 | $4,953.29 |
| 0490 | MGS bridge approach transition section (regular/no curb) (6061069) | EACH | 2 | $3,920.00 | $4,854.22 |
| 0500 | Type A crashworthy end terminal (MASH) (6063014) | EACH | 4 | $3,470.00 | $4,290.78 |
| 0510 | Misc.guardrail post in concrete (6069902) | EACH | 56 | $150.00 | $185.75 |
| 0520 | Misc.pedestrian hand rail (6069903) | LF | 225 | $19.30 | $23.84 |
| 0530 | 2 in. PSST post - 12 GA. (9031270A) | LF | 24 | $11.70 | $18.57 |
| 0540 | Driven post anchor for 2 in. PSST - 7 GA. (9031273A) | EACH | 2 | $242.00 | $154.79 |
| 0550 | SH-flat sheet (9035004A) | SF | 9 | $18.40 | $43.34 |
| 0560 | SHF-flat sheet fluorescent (9035069A) | SF | 9 | $19.70 | $55.72 |
| 0570 | Class 1 excavation (2061000) | CY | 40 | $118.50 | $62.21 |
| 0580 | Removal of bridges (2160500) | LS | 1 | $77,400 | $150,000 |
| 0590 | Bridge approach slab (minor road) (5031011A) | SY | 140 | $543.00 | $341.00 |
| 0600 | (120 in.) pedestrian fence (structures) (6071068) | LF | 214 | $238.00 | $278.62 |
| 0610 | Galvanized structural steel piles (12 in) (7021212) | LF | 304 | $176.00 | $111.96 |
| 0620 | Galvanized cast-in-place concrete piles (20 in) (7021320) | LF | 800 | $327.00 | $315.00 |
| 0630 | Pre-bore for piling (7026000) | LF | 120 | $247.00 | $230.59 |
| 0640 | Pile point reinforcement (7027000) | EACH | 24 | $517.50 | $516.38 |
| 0650 | Class B concrete (substructure) (7032003) | CY | 50.20 | $2,850.00 | $1,978.19 |
| 0660 | Type D barrier (7034219A) | LF | 452 | $145.00 | $165.64 |
| 0670 | Slab on concrete NU-girder (with transparent forms) (7034234) | SY | 739 | $627.50 | $525.00 |
| 0680 | Misc.pedestrian curb (7039903) | LF | 215 | $70.30 | $100.20 |
| 0690 | NU 35, prestressed concrete NU-girder (7056021) | LF | 778 | $507.50 | $415.41 |
| 0700 | Reinforcing steel (bridges) (7061060) | LB | 6,610 | $1.70 | $1.32 |
| 0710 | Conduit system on structure (7071000) | LS | 1 | $11,500 | $43,341 |
| 0720 | Vertical drain at end bents (7151001) | EACH | 2 | $4,230.00 | $3,470.48 |
| 0730 | Plain neoprene bearing pad (7161000) | EACH | 4 | $801.00 | $238.08 |
| 0740 | Laminated neoprene bearing pad (7161002) | EACH | 16 | $524.50 | $351.52 |
| 0750 | Laminated neoprene bearing pad (tapered) (7161003) | EACH | 4 | $1,090.00 | $669.50 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from MoDOT's tabulation for this contract. MoDOT letting tabulation PDFs (vendor ranking and bid tabulation), January 2020 to October 2026. About one bid in eight did not match its published total and is left out. Item codes from before mid 2021 are written in the current MoDOT format so one item groups across years.
Every contract let that day: MoDOT letting of October 17, 2025. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.