MoDOT contract 250516-G01 bid tabulation
J7S3059B - ROUTE FF - JASPER COUNTY. Let by Missouri DOT on May 16, 2025, Jasper, Southwest. 6 bids received; low bid $2,930,000 by Hartman and Company, Inc..
- Owner
- Missouri DOT
- Letting
- 16 MAY 2025
- Pay items
- 131
- Data through
- 16 OCT 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Hartman and Company, Inc. | $2,930,000 | Low |
| 2 | APAC-Central, Inc. | $3,104,487 | +6.0% |
| 3 | D & E Plumbing and Heating, Inc. | $3,164,418 | +8.0% |
| 4 | Emery Sapp & Sons, Inc. | $3,209,392 | +10% |
| 5 | Crossland Construction Company Inc. | $3,232,970 | +10% |
| 6 | KCI Construction Company | $3,474,000 | +19% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Hartman and Company, Inc. | 2. APAC-Central, Inc. | 3. D & E Plumbing and Heating, Inc. | 4. Emery Sapp & Sons, Inc. | 5. Crossland Construction Company Inc. | 6. KCI Construction Company |
|---|---|---|---|---|---|---|---|---|---|
| 0010 | Signet dbe reporting (1081000) | LS | 1 | $1,000.00 | $1,000.00 | $1,000.00 | $1,000.00 | $1,000.00 | $1,000.00 |
| 0020 | Clearing and grubbing (2013000) | ACRE | 3 | $15,900 | $4,925.50 | $6,000.00 | $16,884 | $6,251.00 | $9,200.00 |
| 0030 | Removal of improvements (2022010) | LS | 1 | $85,000 | $45,750 | $40,000 | $54,831 | $45,823 | $78,720 |
| 0040 | Class A excavation (2031000) | CY | 4,479 | $11.30 | $9.90 | $10.00 | $16.14 | $5.35 | $25.00 |
| 0050 | Embankment in place (2035500) | CY | 5,605 | $19.70 | $18.55 | $30.00 | $35.27 | $24.22 | $29.00 |
| 0060 | Compacting embankment (2036000) | CY | 3,807 | $5.40 | $2.82 | $5.00 | $3.34 | $5.07 | $25.00 |
| 0070 | Class 3 excavation (2063000) | CY | 343 | $43.20 | $12.60 | $20.00 | $8.41 | $9.20 | $22.00 |
| 0080 | Linear grading class 1 (2071000) | STA | 2 | $3,160.00 | $4,400.00 | $2,000.00 | $2,669.81 | $2,963.00 | $1,100.00 |
| 0090 | Misc.ADA linear grading (2079903) | LF | 347 | $24.30 | $14.20 | $30.00 | $5.14 | $13.85 | $80.00 |
| 0100 | Subgrade compaction (6-inch depth) (2101006A) | 100F | 5.40 | $1,420.00 | $511.85 | $1,000.00 | $1,405.11 | $1,696.60 | $1,700.00 |
| 0110 | Type 1 aggregate for base (4 in. thick) (3040143) | SY | 273 | $20.80 | $12.40 | $10.00 | $9.95 | $19.91 | $22.00 |
| 0120 | Type 5 aggregate for base (4 in. thick) (3040504) | SY | 1,551 | $12.70 | $14.70 | $10.00 | $14.90 | $14.90 | $14.00 |
| 0130 | Type 5 aggregate for base (6 in. thick) (3040506) | SY | 7,550 | $9.40 | $12.20 | $12.00 | $11.80 | $9.33 | $15.00 |
| 0140 | Misc.optional pavement (4019905) | SY | 1,667.10 | $71.60 | $74.35 | $75.00 | $55.68 | $90.06 | $91.00 |
| 0150 | Concrete pavement (9 in. non-reinforced 15 FT. joints) (5021309) | SY | 5,883.40 | $67.70 | $80.30 | $105.00 | $78.66 | $85.64 | $85.00 |
| 0160 | Concrete curb ramp (6081010) | SY | 45 | $265.00 | $212.00 | $170.00 | $138.48 | $155.30 | $240.00 |
| 0170 | Truncated domes (6081012) | SF | 66 | $41.70 | $24.55 | $40.00 | $27.75 | $39.28 | $33.00 |
| 0180 | Paved approach, 8 in. (6085008) | SY | 1,123 | $108.50 | $90.20 | $110.00 | $77.77 | $100.87 | $100.00 |
| 0190 | Concrete sidewalk, 4 in. (6086004) | SY | 227.90 | $70.50 | $57.15 | $60.00 | $63.01 | $86.55 | $66.00 |
| 0200 | Concrete curb (over 6 in. height) type S (6091011) | LF | 148 | $87.20 | $56.50 | $80.00 | $60.39 | $55.89 | $61.00 |
| 0210 | Concrete gutter type A (6091041) | LF | 370 | $68.00 | $48.75 | $70.00 | $52.20 | $120.72 | $39.00 |
| 0220 | Curb and gutter type A (6091051) | LF | 741 | $55.10 | $40.65 | $60.00 | $33.14 | $50.20 | $43.00 |
| 0230 | Rock lining (6097000) | CY | 96 | $83.70 | $21.45 | $100.00 | $88.59 | $116.72 | $139.00 |
| 0240 | Misc.STD upright C&G (city of joplin) (6099903) | LF | 798 | $62.20 | $39.70 | $40.00 | $37.43 | $45.91 | $37.00 |
| 0250 | Furnishing type 2 rock blanket (6113020) | CY | 229 | $34.20 | $56.70 | $50.00 | $57.43 | $43.97 | $80.00 |
| 0260 | Placing type 2 rock blanket (6113040) | CY | 229 | $24.60 | $5.25 | $50.00 | $30.52 | $48.40 | $37.00 |
| 0270 | Impact attenuator 45 MPH (sand barrel array) (6122009) | EACH | 1 | $2,500.00 | $2,678.60 | $2,500.00 | $2,792.95 | $2,818.00 | $4,900.00 |
| 0280 | Curved vane grate and frame (2 FT. X 2 FT. or 600MM X 600MM) (6141120) | EACH | 3 | $2,230.00 | $1,777.60 | $700.00 | $3,804.45 | $819.00 | $590.00 |
| 0290 | Curved vane grate and frame (4 FT. X 2 FT. or 1200MM X 600MM) (6141121) | EACH | 6 | $2,770.00 | $2,368.90 | $1,200.00 | $3,688.52 | $1,324.00 | $1,056.00 |
| 0300 | Manhole frame and cover, type 4 (6143014) | EACH | 1 | $1,360.00 | $398.10 | $500.00 | $694.58 | $779.00 | $395.00 |
| 0310 | Misc.ADA compliant manhole frame and cover (6149902) | EACH | 1 | $3,390.00 | $429.76 | $500.00 | $694.58 | $810.00 | $395.00 |
| 0320 | Construction signs (6161005) | SF | 571 | $8.00 | $8.50 | $8.00 | $8.94 | $9.02 | $8.25 |
| 0330 | Channelizer (trim-line) (6161025) | EACH | 40 | $21.00 | $23.35 | $10.00 | $24.58 | $24.00 | $18.00 |
| 0340 | Type 3 moveable barricade (6161030) | EACH | 15 | $185.00 | $153.80 | $125.00 | $162.00 | $209.00 | $175.00 |
| 0350 | Flashing arrow panel (6161040) | EACH | 1 | $1,500.00 | $1,590.95 | $750.00 | $1,675.77 | $1,691.00 | $925.00 |
| 0360 | Changeable message sign with communication interface, contractor furnished retained (6161099) | EACH | 4 | $4,550.00 | $3,712.15 | $1,000.00 | $3,910.12 | $5,129.00 | $3,600.00 |
| 0370 | Temporary traffic barrier, contractor furnished retained (6173600D) | LF | 654 | $35.00 | $37.50 | $35.00 | $47.64 | $36.07 | $32.00 |
| 0380 | Mobilization (6181000) | LS | 1 | $152,501 | $239,280 | $200,000 | $139,146 | $300,000 | $336,363 |
| 0390 | Additional mobilization for seeding (6181020) | EACH | 2 | $600.00 | $600.00 | $600.00 | $600.00 | $600.00 | $600.00 |
| 0400 | Preformed thermoplastic pavement marking, 24 in. white (6200015) | LF | 180 | $28.00 | $37.15 | $22.00 | $39.10 | $31.56 | $22.00 |
| 0410 | Preformed thermoplastic pavement marking, 24 in. yellow (6200018) | LF | 74 | $28.00 | $37.15 | $22.00 | $39.10 | $31.56 | $22.00 |
| 0420 | Preformed thermoplastic pavement marking, left/right arrow (6200021) | EACH | 6 | $290.00 | $371.25 | $350.00 | $391.01 | $327.00 | $350.00 |
| 0430 | Preformed thermoplastic pavement marking, combination STR/LT/RT (6200027) | EACH | 1 | $560.00 | $371.25 | $600.00 | $391.01 | $631.00 | $600.00 |
| 0440 | Preformed thermoplastic pavement marking, 30 in white midblock (6200036) | EACH | 21 | $240.00 | $307.60 | $215.00 | $323.97 | $271.00 | $215.00 |
| 0450 | 4 in. white standard waterborne pavement marking paint, type P beads (6206000C) | LF | 943 | $1.00 | $0.65 | $0.35 | $0.67 | $1.10 | $0.35 |
| 0460 | 4 in. yellow standard waterborne pavement marking paint, type P beads (6206001C) | LF | 4,951 | $0.95 | $0.65 | $0.35 | $0.67 | $1.05 | $0.35 |
| 0470 | Permanent erosion control geotextile (6240103A) | SY | 344 | $18.70 | $2.00 | $8.00 | $3.39 | $4.91 | $1.74 |
| 0480 | Contractor furnished surveying and staking (6274000) | LS | 1 | $24,900 | $26,135 | $28,585 | $11,972 | $32,220 | $12,000 |
| 0490 | Misc.type D barrier transition (moment slab) (7039903) | LF | 355 | $182.50 | $188.50 | $280.00 | $348.50 | $224.07 | $165.00 |
| 0500 | 15 in. pipe group B (7250315A) | LF | 762 | $70.50 | $59.15 | $40.00 | $86.07 | $98.64 | $76.00 |
| 0510 | Corrugated metallic-coated steel pipe-arch type B-6/B-6A (7252006) | LF | 104 | $274.00 | $59.15 | $150.00 | $143.78 | $229.23 | $185.00 |
| 0520 | 15 in. pipe group A (7261015) | LF | 215 | $94.30 | $59.15 | $50.00 | $101.84 | $99.04 | $83.00 |
| 0530 | Precast concrete manhole - 48 in. (7310048) | FT | 9 | $1,040.00 | $2,512.15 | $1,000.00 | $1,328.85 | $1,244.65 | $1,370.00 |
| 0540 | Precast concrete drop inlet 2 FT X 2 FT (7311022) | FT | 13 | $1,290.00 | $2,039.15 | $900.00 | $1,741.80 | $1,026.51 | $1,200.00 |
| 0550 | Precast concrete drop inlet 4 FT X 2 FT (7311042) | FT | 24 | $1,330.00 | $2,512.15 | $850.00 | $1,848.79 | $1,077.15 | $1,200.00 |
| 0560 | 15 in. or allowed substitute group B flared end section (7320015A) | EACH | 2 | $1,680.00 | $2,739.90 | $600.00 | $912.10 | $584.00 | $3,080.00 |
| 0570 | 15 in. or allowed substitute group A flared end section (7320615A) | EACH | 1 | $2,410.00 | $952.20 | $600.00 | $548.08 | $584.00 | $3,080.00 |
| 0580 | B6 flared end section (7321006) | EACH | 4 | $2,920.00 | $2,454.60 | $1,700.00 | $1,252.05 | $2,506.00 | $4,400.00 |
| 0590 | Mulching (8025006) | ACRE | 5.40 | $1,750.00 | $2,019.25 | $1,875.00 | $1,955.06 | $6,199.00 | $1,875.00 |
| 0600 | Turf type tall fescue sodding (8031000A) | SY | 71 | $30.00 | $263.85 | $12.00 | $33.52 | $31.75 | $245.00 |
| 0610 | Seeding - cool season grasses (8051000A) | ACRE | 4.40 | $3,000.00 | $2,584.65 | $2,400.00 | $3,351.53 | $6,199.00 | $2,400.00 |
| 0620 | Rock ditch check (8061005) | LF | 330 | $13.50 | $16.15 | $20.00 | $15.09 | $13.45 | $15.00 |
| 0630 | Curb inlet check (8061007A) | EACH | 15 | $100.00 | $177.70 | $150.00 | $111.72 | $282.00 | $165.00 |
| 0640 | Sediment removal (8061016) | CY | 74 | $51.20 | $42.00 | $10.00 | $21.20 | $26.76 | $22.00 |
| 0650 | Temporary seeding (8061017) | ACRE | 1 | $2,000.00 | $2,853.85 | $1,500.00 | $2,234.35 | $6,199.00 | $2,650.00 |
| 0660 | Silt fence (8061019) | LF | 1,738 | $3.00 | $4.10 | $5.00 | $3.35 | $4.51 | $3.65 |
| 0670 | Type 2 turf reinforcement mat (8064129) | SY | 3,777 | $4.90 | $3.70 | $3.40 | $5.42 | $5.64 | $3.40 |
| 0680 | Lighting pole, 30 FT. or 9.0 M, type at (9011030) | EACH | 1 | $4,140.00 | $4,347.00 | $4,140.00 | $4,625.10 | $3,229.00 | $4,140.00 |
| 0690 | Bracket arm, 15 FT. or 4.6 M (9011115) | EACH | 1 | $1,650.00 | $1,727.25 | $1,645.00 | $1,837.76 | $1,691.00 | $1,645.00 |
| 0700 | Luminaire, LED-A (9011311) | EACH | 1 | $355.00 | $372.75 | $355.00 | $396.60 | $342.00 | $355.00 |
| 0710 | Base mounted control station 240 volt - 4 circuit (9012230) | EACH | 1 | $10,100 | $10,652 | $10,145 | $11,334 | $1.00 | $10,145 |
| 0720 | Conduit, 2 in. rigid, in trench (9013002) | LF | 20 | $20.80 | $21.80 | $20.75 | $23.18 | $16.91 | $20.75 |
| 0730 | Conduit, 3 in. rigid, in trench (9013003) | LF | 40 | $25.50 | $26.80 | $25.50 | $28.49 | $19.16 | $25.50 |
| 0740 | Conduit, 3 in. rigid, pushed (9014003) | LF | 80 | $35.50 | $37.30 | $35.50 | $39.66 | $42.83 | $35.50 |
| 0750 | Pull box, concrete, standard (9016120) | EACH | 2 | $3,300.00 | $3,465.00 | $3,300.00 | $3,686.68 | $5,072.00 | $3,300.00 |
| 0760 | Cable, 1 AWG 1 conductor (9017001) | LF | 60 | $5.50 | $5.80 | $5.50 | $6.15 | $4.51 | $5.50 |
| 0770 | Cable, 10 AWG 1 conductor, pole and bracket (9017110) | LF | 90 | $1.50 | $1.60 | $1.50 | $1.68 | $1.87 | $1.50 |
| 0780 | Cable-conduit, 1 in., 2 conductors and 1 bare neutral, 8 AWG (9017407) | LF | 120 | $6.90 | $7.20 | $6.85 | $7.66 | $6.76 | $6.85 |
| 0790 | Pole foundation (30 FT. or 9.0 M mounting height) (9018230) | EACH | 1 | $2,300.00 | $2,409.75 | $2,295.00 | $2,563.92 | $1,837.00 | $2,295.00 |
| 0800 | Power supply assembly, type 2, 240/120 volt service, lighting and signals (9018613) | EACH | 1 | $4,850.00 | $5,092.50 | $4,850.00 | $5,418.31 | $10,145 | $4,850.00 |
| 0810 | Signal head, type 3S (9020213) | EACH | 2 | $1,030.00 | $1,076.25 | $1,025.00 | $1,145.11 | $1,125.00 | $1,025.00 |
| 0820 | Signal head, type 4S (9020214) | EACH | 1 | $1,580.00 | $1,653.75 | $1,575.00 | $1,759.56 | $1,262.00 | $1,575.00 |
| 0830 | Signal head, type 3B (9020513) | EACH | 8 | $1,200.00 | $1,254.75 | $1,195.00 | $1,335.03 | $1,443.00 | $1,195.00 |
| 0840 | Signal head, type 4B (9020514) | EACH | 3 | $1,710.00 | $1,790.25 | $1,705.00 | $1,904.79 | $1,605.00 | $1,705.00 |
| 0850 | Signal head, type 1S, pedestrian (9020811) | EACH | 4 | $610.00 | $640.50 | $610.00 | $681.49 | $780.00 | $610.00 |
| 0860 | SH-flat sheet - signal sign (9020833) | SF | 68 | $22.80 | $23.90 | $22.75 | $25.41 | $45.09 | $22.75 |
| 0870 | Signal sign, mounting hardware (9020834) | EACH | 8 | $215.00 | $225.75 | $215.00 | $240.20 | $338.00 | $215.00 |
| 0880 | Luminaire LED-A, 120 volt compatible (9022651) | EACH | 1 | $350.00 | $367.50 | $350.00 | $391.01 | $342.00 | $350.00 |
| 0890 | Post, signal 8 FT. (9022708) | EACH | 3 | $1,300.00 | $1,365.00 | $1,300.00 | $1,452.33 | $1,279.00 | $1,300.00 |
| 0900 | Post, signal 15 FT. (9022715) | EACH | 1 | $2,100.00 | $2,205.00 | $2,100.00 | $2,346.08 | $2,281.00 | $2,100.00 |
| 0910 | Post, type CL, 40 FT. arm or 12.2 M arm (9023140) | EACH | 1 | $19,700 | $20,664 | $19,680 | $21,986 | $18,063 | $19,680 |
| 0920 | Post, type C, 35 FT. arm or 10.7 M arm (9023235) | EACH | 2 | $15,500 | $16,275 | $15,500 | $17,316 | $14,554 | $15,500 |
| 0930 | Post, type C, 55 FT. arm (9023255) | EACH | 1 | $20,700 | $21,698 | $20,665 | $23,086 | $18,486 | $20,665 |
| 0940 | Accessible pedestrian signal (9024921) | EACH | 4 | $1,080.00 | $1,128.75 | $1,075.00 | $1,200.96 | $1,826.00 | $1,075.00 |
| 0950 | Conduit, 2 in., trench with tracer wire (9025200) | LF | 30 | $15.30 | $16.05 | $15.25 | $17.03 | $19.16 | $15.25 |
| 0960 | Conduit, 3 in., trench with tracer wire (9025300) | LF | 103 | $22.00 | $23.10 | $22.00 | $24.58 | $21.42 | $22.00 |
| 0970 | Conduit, 4 in., trench with tracer wire (9025400) | LF | 98 | $28.90 | $30.30 | $28.85 | $32.23 | $22.54 | $28.85 |
| 0980 | Conduit, 4 in., pushed with tracer wire (9027400) | LF | 368 | $39.50 | $41.50 | $39.50 | $44.13 | $42.83 | $39.50 |
| 0990 | Cable, 10 AWG 1 conductor, pole and bracket (9028100) | LF | 100 | $1.50 | $1.60 | $1.50 | $1.68 | $1.86 | $1.50 |
| 1000 | Cable, 1 AWG 1 conductor, power (9028201) | LF | 140 | $5.50 | $5.80 | $5.50 | $6.15 | $4.51 | $5.50 |
| 1010 | Cable, 12 AWG 2 conductor (9028302) | LF | 270 | $1.90 | $1.95 | $1.85 | $2.07 | $2.25 | $1.85 |
| 1020 | Cable, 16 AWG 2 conductor (9028308) | LF | 410 | $1.50 | $1.60 | $1.50 | $1.68 | $2.25 | $1.50 |
| 1030 | Cable, 16 AWG 5 conductor (9028310) | LF | 410 | $2.30 | $2.45 | $2.30 | $2.57 | $2.82 | $2.30 |
| 1040 | Cable, 16 AWG 7 conductor (9028311) | LF | 2,140 | $2.80 | $2.95 | $2.80 | $3.13 | $3.10 | $2.80 |
| 1050 | Pull box, concrete, standard (9028820) | EACH | 3 | $3,300.00 | $3,465.00 | $3,300.00 | $3,686.68 | $6,763.00 | $3,300.00 |
| 1060 | Pull box, concrete, double type B (9028824) | EACH | 1 | $5,200.00 | $5,407.50 | $5,150.00 | $5,753.46 | $9,017.00 | $5,150.00 |
| 1070 | Base, concrete (9029100) | CY | 15.60 | $1,410.00 | $1,475.25 | $1,405.00 | $1,569.63 | $4,395.97 | $1,405.00 |
| 1080 | Misc.radar detection system, contractor furnished, contractor installed (9029901) | LS | 1 | $50,500 | $53,025 | $50,500 | $56,417 | $56,359 | $50,500 |
| 1090 | Misc.signal communication (9029901) | LS | 1 | $2,360.00 | $2,478.00 | $2,360.00 | $2,636.54 | $3,156.00 | $2,360.00 |
| 1100 | Misc.signal controller and cabinet, type 2070 (9029902) | EACH | 1 | $43,000 | $45,150 | $43,000 | $48,039 | $22,543 | $43,000 |
| 1110 | Misc.uninterruptable power supply (UPS) (9029902) | EACH | 1 | $14,800 | $15,509 | $14,770 | $16,501 | $5,636.00 | $14,770 |
| 1120 | 2 in. PSST post - 12 GA. (9031270A) | LF | 45 | $13.00 | $14.10 | $13.00 | $14.53 | $14.65 | $59.69 |
| 1130 | Driven post anchor for 2 in. PSST - 12 GA. (9031271A) | EACH | 3 | $290.00 | $313.95 | $300.00 | $323.97 | $327.00 | $785.21 |
| 1140 | SH-flat sheet (9035004A) | SF | 33 | $20.00 | $21.65 | $20.00 | $22.34 | $22.54 | $47.43 |
| 1150 | CCTV camera assembly, installed (9103700) | EACH | 1 | $5,800.00 | $6,116.25 | $5,825.00 | $6,507.55 | $9,580.97 | $5,825.00 |
| 1160 | Conduit, 2 in., rigid, in trench (9105200) | LF | 135 | $15.30 | $16.05 | $15.25 | $17.03 | $19.16 | $15.25 |
| 1170 | Conduit, 3 in., rigid, pushed (9107201) | LF | 80 | $35.50 | $37.30 | $35.50 | $39.66 | $21.42 | $35.50 |
| 1180 | Cable, 1 AWG, 1 conductor, power (9108201) | LF | 140 | $5.50 | $5.80 | $5.50 | $6.15 | $4.51 | $5.50 |
| 1190 | Pull box, concrete, standard (9108820) | EACH | 4 | $3,300.00 | $3,465.00 | $3,300.00 | $3,686.69 | $5,072.00 | $3,300.00 |
| 1200 | Misc.48 port fiber distribution unit (9109902) | EACH | 1 | $855.00 | $897.75 | $855.00 | $955.18 | $4,509.00 | $855.00 |
| 1210 | Misc.install modot furnished ethernet switch (9109902) | EACH | 1 | $185.00 | $194.25 | $185.00 | $206.68 | $902.00 | $185.00 |
| 1220 | Misc.ITS cabinet, type 332 (9109902) | EACH | 1 | $8,500.00 | $8,925.00 | $8,500.00 | $9,495.99 | $15,780 | $8,500.00 |
| 1230 | Misc.ubiquiti nanobeam gen 2 radio (9109902) | EACH | 2 | $750.00 | $787.50 | $750.00 | $837.88 | $1,014.00 | $750.00 |
| 1240 | Misc.cable, CCTV, ethernet cat 5 (9109903) | LF | 300 | $2.20 | $2.30 | $2.15 | $2.40 | $5.64 | $2.15 |
| 1250 | Misc.cable, radio, ethernet cat 5 (9109903) | LF | 620 | $2.20 | $2.30 | $2.15 | $2.40 | $5.64 | $2.15 |
| 1260 | Class 4 excavation (2063300) | CY | 370 | $76.10 | $37.35 | $40.00 | $11.66 | $28.54 | $71.00 |
| 1270 | Class 4 excavation in rock (2063400) | CY | 305 | $205.00 | $113.15 | $40.00 | $0.01 | $56.24 | $326.00 |
| 1280 | Misc.dewatering (2069901) | LS | 1 | $51,400 | $53,030 | $2,000.00 | $35,162 | $16,908 | $18,000 |
| 1290 | Class B-1 concrete (culverts-bridge) (7034040) | CY | 311.60 | $702.50 | $954.55 | $1,200.00 | $1,378.29 | $1,250.00 | $1,025.00 |
| 1300 | Reinforcing steel (culverts-bridge) (7061020) | LB | 47,730 | $1.70 | $3.20 | $2.00 | $1.80 | $1.26 | $1.30 |
| 1310 | Mechanically stabilized earth wall systems (7201000) | SF | 2,229 | $121.50 | $133.00 | $130.00 | $137.97 | $87.24 | $123.50 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from MoDOT's tabulation for this contract. MoDOT letting tabulation PDFs (vendor ranking and bid tabulation), January 2020 to October 2026. About one bid in eight did not match its published total and is left out. Item codes from before mid 2021 are written in the current MoDOT format so one item groups across years.
Every contract let that day: MoDOT letting of May 16, 2025. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.