D & E Plumbing and Heating, Inc.: MoDOT bid record

D & E Plumbing and Heating, Inc. submitted 26 bids on Missouri DOT contracts in the data, from 17 JAN 2020 to 16 OCT 2026, and was the low bidder on 11 of them (42%). When it was not low, its total sat a median +24% above the low bid.

Owner
Missouri DOT
Low bid volume
$62,471,500
Latest bid
16 OCT 2026
Data through
16 OCT 2026
26Bids
11Low bids
42Win rate, percent
+24%Median gap to the low bid when not low, 15 bids

By year

YearBidsLow bidsWin rate
202011100%
20213133%
20225480%
20236233%
2024400%
20254250%
20263133%
D & E Plumbing and Heating, Inc., MoDOT: bids and low bids by year of letting

Pay items where it is most often lowest

Pay itemCodeUnitLines bidLowest on the lineIts median priceAll bidders' median
Construction signs6161005SF3732 (86%)$7.00$7.00
Sediment removal8061016CY3830 (79%)$10.00$25.69
2.5 in. PSST post - 12 GA.9031280LF2722 (81%)$14.10$23.48
Cable, 16 AWG 2 conductor9028308LF2121 (100%)$2.00$1.77
Concrete sidewalk, 4 in.6086004SY3520 (57%)$61.00$79.31
SH-flat sheet - signal sign9020833SF2020 (100%)$22.00$39.00
Signal sign, mounting hardware9020834EACH1919 (100%)$95.00$199.96
SH-flat sheet9035004ASF2018 (90%)$19.42$28.00
Flashing arrow panel6161040EACH2417 (71%)$1,150.00$1,000.00
Cable, 16 AWG 5 conductor9028310LF1817 (94%)$2.22$2.15
Signal head, type 1S, pedestrian9020811EACH1717 (100%)$755.00$784.03
Base, concrete9029100CY1816 (89%)$1,475.00$2,100.00
D & E Plumbing and Heating, Inc., MoDOT: pay items where its unit price was the lowest on the line

A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.

Who it meets most

D & E Plumbing and Heating, Inc., MoDOT: the firms on the same contracts most often

Latest bids

LetContractDistrictProjectRankIts bidAgainst the low bid
16 OCT 2026261016-G11SouthwestJSU0080 - ROUTE 266 - GREENE COUNTY7 of 7$5,426,967+61%
18 SEP 2026260918-G01SouthwestJ8S0745, J8S3133, J8S3153 - ROUTE D - GREENE COUNTY1 of 6$6,565,904Low, 1.0% under the second
17 APR 2026260417-G01SouthwestJ8S0736E - ROUTE CC - CHRISTIAN COUNTY4 of 4$3,728,929+46%
14 NOV 2025251114-G02SouthwestJ7S2185B-G, JSR0314 - ROUTE 66 - JASPER COUNTY1 of 3$33,698,257Low, 75% under the second
17 OCT 2025251017-G02SouthwestJ8S0836D - ROUTE MM - GREENE COUNTY3 of 3$26,748,478+18%
15 AUG 2025250815-G02SouthwestSignal upgrades and add turn lane and ADA Improvements1 of 3$1,480,862Low, 13% under the second
16 MAY 2025250516-G01SouthwestJ7S3059B - ROUTE FF - JASPER COUNTY3 of 6$3,164,418+8.0%
15 NOV 2024241115-G02SouthwestJ8S0736F, JSU0216 - ROUTE CC, MAIN STREET - CHRISITAN COUNTY2 of 4$5,890,424+2.0%
16 AUG 2024240816-G05SouthwestJSR0010 - ROUTE 265 - STONE COUNTY3 of 4$506,677+20%
15 MAR 2024240315-G03SouthwestJSR0056 - ROUTES 248, 376, 76 - TANEY COUNTY4 of 4$3,269,283+31%
15 MAR 2024240315-G06SouthwestJSU0101 - ROUTE 65 - GREENE COUNTY5 of 5$2,749,732+31%
19 MAY 2023230519-G04SouthwestJ8S3194 - ROUTE ZZ - GREEN COUNTY6 of 6$2,450,569+31%
19 MAY 2023230519-G06SouthwestJSU0054 - ROUTE ZZ - GREEN COUNTY7 of 7$1,746,052+35%
17 MAR 2023230317-G01SouthwestJ7P3527, J8S3200 - VARIOUS ROUTES - LAWRENCE, GREENE COUNTIES1 of 2$2,914,868Low, 15% under the second
17 MAR 2023230317-G04SouthwestJ8P3087E, J8P3087F, J8S3165, J8S3173 - ROUTE 13 - GREENE COUNTY1 of 4$13,325,352Low, 2.0% under the second
17 FEB 2023230217-G05SouthwestJ7S3395 - RTE. 76, 376 - STONE, TANEY COUNTIES2 of 3$2,294,219+24%
20 JAN 2023230120-G07SouthwestJ8S3138, J8S3138B, JSU0020 - ROUTE 160 - GREENE COUNTY2 of 3$9,869,071+2.0%
21 OCT 2022221021-G01SouthwestJ7P3372C - ROUTE 249 - JASPER COUNTY8 of 10$2,991,493+67%
20 MAY 2022220520-G02SouthwestJ7P3419-VARIOUS ROUTES-JASPER, NEWTON COUNTIES1 of 1$1,571,182Low
20 MAY 2022220520-G05SouthwestJ7S3421-VARIOUS ROUTES-STONE, TANEY COUNTIES1 of 1$841,782Low
18 FEB 2022220218-G01SouthwestJ7P3101B, J7S3367B, J7S3439-VARIOUS ROUTES-WEBSTER COUNTY1 of 3$723,029Low, 11% under the second
18 FEB 2022220218-G14SouthwestJ7S3367F - ROUTE HH - NEWTON COUNTY1 of 2$262,232Low, 4.0% under the second
17 DEC 2021211217-G03SouthwestJ8S3222 - ROUTE KK - GREENE COUNTY2 of 7$215,639+9.0%
19 MAR 2021210319-G04SouthwestJ8P3129 - ROUTE 60,413 - GREENE COUNTY1 of 4$1,029,287Low, 1.0% under the second
19 FEB 2021210219-G04SouthwestJ7P3283,J7S3250 - ROUTE 171,O - JASPER COUNTY2 of 7$474,429+4.0%
D & E Plumbing and Heating, Inc.: latest MoDOT bids in the data

How this record was read

MoDOT letting tabulation PDFs (vendor ranking and bid tabulation), January 2020 to October 2026. About one bid in eight did not match its published total and is left out. Item codes from before mid 2021 are written in the current MoDOT format so one item groups across years.

  • Every bid counted here matched its published total to within one dollar; MoDOT's rank decides who was low.
  • The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
  • A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.

A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy