MoDOT contract 251114-H09 bid tabulation

JSEM0114 - ROUTE 95 - WRIGHT COUNTY. Let by Missouri DOT on November 14, 2025, Wright, Southeast. 6 bids received; low bid $347,398 by H.R. Quadri Contractors, LLC.

Owner
Missouri DOT
Letting
14 NOV 2025
Pay items
16
Data through
16 OCT 2026

Bidders

MoDOT contract 251114-H09: bids by rank

Bid tabulation

LinePay itemUnitQuantity1. H.R. Quadri Contractors, LLC2. Gene Haile Excavating, Inc.3. Widel, Inc.4. Mera Excavating, LLC5. Courtney Construction, LLC dba Courtney Excavating & Construction6. Putz Construction, LLC
0010Clearing and grubbing (2013000)ACRE1$5,000.00$5,500.00$3,250.00$3,358.86$14,349$15,000
0020Removal of improvements (2022010)LS1$4,000.00$5,000.00$12,000$1,561.82$11,726$60,000
0030Linear grading class 2 (2072000)STA14.20$10.00$1,550.00$250.00$948.82$167.89$1,800.00
0040Gravel (A) or crushed stone (B) (3105002)TON345$1.00$35.00$60.00$36.67$68.78$42.00
0050Misc.furnishing and placing type 2 rock blanket (6119910)TON6,369$45.00$50.00$60.00$65.63$60.34$68.00
0060Construction signs (6161005)SF160$10.00$10.00$17.50$14.62$11.50$11.00
0070Channelizer (trim-line) (6161025)EACH50$25.00$20.00$25.00$16.49$17.25$11.00
0080Changeable message sign without communication interface, contractor furnished retained (6161098A)EACH2$3,000.00$2,500.00$3,000.00$3,097.43$2,875.00$2,420.00
0090Mobilization (6181000)LS1$30,400$64,501$35,000$20,622$55,000$50,000
0100Permanent erosion control geotextile (6240103A)SY8,392$1.00$3.00$2.25$1.59$2.33$2.75
0110Contractor furnished surveying and staking (6274000)LS1$2,000.00$4,000.00$4,000.00$4,224.18$2,875.00$5,000.00
0120Mulching (8025006)ACRE1$1.00$1,750.00$1,750.00$3,535.68$13,761$1,650.00
0130Seeding - cool season grasses (8051000A)ACRE1$1.00$3,250.00$5,000.00$6,289.68$11,691$3,190.00
0140Sediment removal (8061016)CY19$1.00$25.00$45.00$11.91$250.95$40.00
0150Silt fence (8061019)LF1,023$1.00$3.50$3.50$6.09$8.45$3.50
0160Type C berm (8061050)LF620$1.00$15.00$15.00$4.56$124.99$25.00
MoDOT contract 251114-H09: unit prices by line

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from MoDOT's tabulation for this contract. MoDOT letting tabulation PDFs (vendor ranking and bid tabulation), January 2020 to October 2026. About one bid in eight did not match its published total and is left out. Item codes from before mid 2021 are written in the current MoDOT format so one item groups across years.

Every contract let that day: MoDOT letting of November 14, 2025. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy