Courtney Construction, LLC dba Courtney Excavating & Construction: MoDOT bid record
Courtney Construction, LLC dba Courtney Excavating & Construction submitted 12 bids on Missouri DOT contracts in the data, from 17 MAY 2024 to 18 SEP 2026, and was the low bidder on 3 of them (25%). When it was not low, its total sat a median +69% above the low bid.
- Owner
- Missouri DOT
- Low bid volume
- $542,145
- Latest bid
- 18 SEP 2026
- Data through
- 16 OCT 2026
By year
| Year | Bids | Low bids | Win rate |
|---|---|---|---|
| 2024 | 2 | 0 | 0% |
| 2025 | 7 | 3 | 43% |
| 2026 | 3 | 0 | 0% |
By district
| District | Bids | Low bids | Win rate |
|---|---|---|---|
| Southeast | 7 | 2 | 29% |
| St. Louis | 2 | 1 | 50% |
| Central | 2 | 0 | 0% |
| Kansas City | 1 | 0 | 0% |
Pay items where it is most often lowest
| Pay item | Code | Unit | Lines bid | Lowest on the line | Its median price | All bidders' median |
|---|---|---|---|---|---|---|
| Seeding - cool season grasses | 8051000A | ACRE | 8 | 2 (25%) | $8,864.55 | $3,600.47 |
| Mulching | 8025006 | ACRE | 7 | 2 (29%) | $13,761 | $2,500.00 |
| Linear grading class 2 | 2072000 | STA | 5 | 2 (40%) | $3,230.96 | $1,725.00 |
| Construction signs | 6161005 | SF | 6 | 1 (17%) | $13.80 | $7.00 |
| Permanent erosion control geotextile | 6240103A | SY | 6 | 1 (17%) | $6.00 | $4.00 |
| Class A excavation | 2031000 | CY | 6 | 1 (17%) | $65.57 | $20.00 |
| Changeable message sign without communication interface, contractor furnished retained | 6161098A | EACH | 6 | 1 (17%) | $2,987.50 | $2,800.00 |
| Alternate ditch check | 8061006 | LF | 5 | 1 (20%) | $87.60 | $11.40 |
A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.
Who it meets most
| Firm | Contracts in common | That firm ranked ahead |
|---|---|---|
| H.R. Quadri Contractors, LLC | 7 | 5 of 7 |
| Mera Excavating, LLC | 5 | 5 of 5 |
| Widel, Inc. | 5 | 5 of 5 |
| Putz Construction, LLC | 4 | 1 of 4 |
| Gene Haile Excavating, Inc. | 3 | 3 of 3 |
| RL Persons Construction, Inc. | 2 | 2 of 2 |
| Young's General Contracting, Inc. | 2 | 1 of 2 |
| K.J.U., Inc. dba K.J. Unnerstall Construction Co. | 2 | 1 of 2 |
| Pace Construction Company, LLC | 2 | 0 of 2 |
| Elements Construction Concepts, Inc. | 1 | 1 of 1 |
Latest bids
| Let | Contract | District | Project | Rank | Its bid | Against the low bid |
|---|---|---|---|---|---|---|
| 18 SEP 2026 | 260918-D08 | Central | JCD0340 - ROUTE B - DENT COUNTY | 4 of 6 | $336,583 | +53% |
| 18 SEP 2026 | 260918-D11 | Central | JCD0219B-ROUTE 54 - COLE COUNTY | 6 of 6 | $608,204 | +69% |
| 15 MAY 2026 | 260515-C08 | Kansas City | JKU0147 - ROUTE 150 - JACKSON COUNTY | 3 of 4 | $216,299 | +43% |
| 14 NOV 2025 | 251114-F06 | St. Louis | JSLM0079 - ROUTE 100 - FRANKLIN COUNTY | 7 of 10 | $159,120 | +39% |
| 14 NOV 2025 | 251114-H09 | Southeast | JSEM0114 - ROUTE 95 - WRIGHT COUNTY | 5 of 6 | $638,731 | +84% |
| 15 AUG 2025 | 250815-F05 | St. Louis | JSLM0063 - ROUTE 50 - ST LOUIS COUNTY | 1 of 4 | $158,568 | Low, 83% under the second |
| 15 AUG 2025 | 250815-H05 | Southeast | JSEM0106-ROUTE KK-WAYNE COUNTY | 6 of 7 | $260,621 | +75% |
| 16 MAY 2025 | 250516-H11 | Southeast | JSEM0081 - ROUTE 95 - OZARK COUNTY | 1 of 2 | $196,429 | Low, 47% under the second |
| 18 APR 2025 | 250418-H02 | Southeast | J9P3835 - ROUTE 60 - CARTER, HOWELL, SHANNON COUNTIES | 5 of 6 | $1,313,425 | +76% |
| 17 JAN 2025 | 250117-H10 | Southeast | JSEM0069 - ROUTE 60 - WRIGHT COUNTY | 1 of 3 | $187,148 | Low, 11% under the second |
| 21 JUN 2024 | 240621-H02 | Southeast | JSEM0059 - ROUTE 67 - BUTLER COUNTY | 4 of 8 | $251,608 | +32% |
| 17 MAY 2024 | 240517-H09 | Southeast | JSEM0040 - ROUTE 5 - DOUGLAS COUNTY | 5 of 5 | $324,804 | +120% |
How this record was read
MoDOT letting tabulation PDFs (vendor ranking and bid tabulation), January 2020 to October 2026. About one bid in eight did not match its published total and is left out. Item codes from before mid 2021 are written in the current MoDOT format so one item groups across years.
- Every bid counted here matched its published total to within one dollar; MoDOT's rank decides who was low.
- The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
- A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.
A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.