H.R. Quadri Contractors, LLC: MoDOT bid record
H.R. Quadri Contractors, LLC submitted 44 bids on Missouri DOT contracts in the data, from 17 JAN 2020 to 18 SEP 2026, and was the low bidder on 26 of them (59%). When it was not low, its total sat a median +23% above the low bid.
- Owner
- Missouri DOT
- Low bid volume
- $52,648,031
- Latest bid
- 18 SEP 2026
- Data through
- 16 OCT 2026
By year
| Year | Bids | Low bids | Win rate |
|---|---|---|---|
| 2020 | 4 | 2 | 50% |
| 2021 | 8 | 5 | 63% |
| 2022 | 5 | 2 | 40% |
| 2023 | 7 | 5 | 71% |
| 2024 | 7 | 5 | 71% |
| 2025 | 7 | 3 | 43% |
| 2026 | 6 | 4 | 67% |
By district
| District | Bids | Low bids | Win rate |
|---|---|---|---|
| Southeast | 38 | 23 | 61% |
| Central | 6 | 3 | 50% |
Pay items where it is most often lowest
| Pay item | Code | Unit | Lines bid | Lowest on the line | Its median price | All bidders' median |
|---|---|---|---|---|---|---|
| Construction signs | 6161005 | SF | 34 | 25 (74%) | $7.75 | $7.00 |
| Channelizer (trim line) | 6161025 | EACH | 26 | 23 (88%) | $18.00 | $18.00 |
| Silt fence | 8061019 | LF | 30 | 21 (70%) | $2.95 | $3.45 |
| Additional mobilization for seeding | 6181020 | EACH | 21 | 21 (100%) | $600.00 | $600.00 |
| Rock ditch check | 8061005 | LF | 28 | 20 (71%) | $12.50 | $20.00 |
| Seeding - cool season grasses | 8051000A | ACRE | 22 | 16 (73%) | $2,635.00 | $3,600.47 |
| Permanent erosion control geotextile | 6240103A | SY | 26 | 15 (58%) | $3.00 | $4.00 |
| Gravel (A) or crushed stone (B) | 3105002 | TON | 18 | 15 (83%) | $40.00 | $55.00 |
| SH-flat sheet | 9035004A | SF | 16 | 13 (81%) | $32.00 | $28.00 |
| 4 in. white standard waterborne pavement marking paint, type P beads | 6206000C | LF | 19 | 12 (63%) | $0.15 | $0.20 |
| Mulching | 8025006 | ACRE | 16 | 12 (75%) | $1,487.50 | $2,500.00 |
| Tack coat | 4071005 | GAL | 15 | 12 (80%) | $3.40 | $2.90 |
A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.
Who it meets most
| Firm | Contracts in common | That firm ranked ahead |
|---|---|---|
| Putz Construction, LLC | 17 | 4 of 17 |
| RL Persons Construction, Inc. | 13 | 6 of 13 |
| Pace Construction Company, LLC | 8 | 2 of 8 |
| Mera Excavating, LLC | 7 | 2 of 7 |
| Courtney Construction, LLC dba Courtney Excavating & Construction | 7 | 2 of 7 |
| Widel, Inc. | 6 | 1 of 6 |
| Joe's Bridge & Grading, Inc. | 5 | 2 of 5 |
| Robertson Contractors, Inc. | 5 | 2 of 5 |
| Above And Below Contracting, LLC | 4 | 0 of 4 |
| Lehman Construction, LLC | 4 | 2 of 4 |
Latest bids
| Let | Contract | District | Project | Rank | Its bid | Against the low bid |
|---|---|---|---|---|---|---|
| 18 SEP 2026 | 260918-D08 | Central | JCD0340 - ROUTE B - DENT COUNTY | 1 of 6 | $219,812 | Low, 27% under the second |
| 15 MAY 2026 | 260515-D03 | Central | JCD0135-ROUTE 47-WASHINGTON COUNTY | 1 of 4 | $6,356,214 | Low, 24% under the second |
| 15 MAY 2026 | 260515-D06 | Central | JCD0338, JCD0339, JCD0341- ROUTE 119, 72, FF - DENT COUNTY | 1 of 5 | $169,986 | Low, 15% under the second |
| 17 APR 2026 | 260417-H09 | Southeast | JSE0179-VARIOUS ROUTES-VARIOUS COUNTIES | 1 of 2 | $1 | Low, 5.0% under the second |
| 17 APR 2026 | 260417-H11 | Southeast | Rank vendor id vendor name total bid percent of low bid | 2 of 4 | $74,124 | +53% |
| 16 JAN 2026 | 260116-D02 | Central | J5S3556 - ROUTE T - WASHINGTON COUNTY | 3 of 5 | $224,000 | +50% |
| 14 NOV 2025 | 251114-H09 | Southeast | JSEM0114 - ROUTE 95 - WRIGHT COUNTY | 1 of 6 | $347,398 | Low, 39% under the second |
| 15 AUG 2025 | 250815-H03 | Southeast | JSE0150 - ROUTE Y - SCOTT COUNTY | 3 of 6 | $2,698,635 | +15% |
| 15 AUG 2025 | 250815-H05 | Southeast | JSEM0106-ROUTE KK-WAYNE COUNTY | 1 of 7 | $148,840 | Low, 39% under the second |
| 16 MAY 2025 | 250516-H08 | Southeast | JSE0108 - ROUTE M - OREGON COUNTY | 1 of 2 | $3,722,369 | Low, 1.0% under the second |
| 18 APR 2025 | 250418-H02 | Southeast | J9P3835 - ROUTE 60 - CARTER, HOWELL, SHANNON COUNTIES | 2 of 6 | $844,678 | +13% |
| 21 FEB 2025 | 250221-H03 | Southeast | JSE0152 - ROUTE B - ST FRANCOIS COUNTY | 2 of 2 | $2,244,102 | +5.0% |
| 17 JAN 2025 | 250117-H10 | Southeast | JSEM0069 - ROUTE 60 - WRIGHT COUNTY | 3 of 3 | $215,000 | +15% |
| 15 NOV 2024 | 241115-H01 | Southeast | J9P3545 - ROUTE 21 - IRON COUNTY | 1 of 2 | $4,412,323 | Low, 5.0% under the second |
| 16 AUG 2024 | 240816-D03 | Central | JCDM0060-ROUTE 17-MILLER COUNTY | 2 of 7 | $124,348 | +18% |
| 21 JUN 2024 | 240621-H02 | Southeast | JSEM0059 - ROUTE 67 - BUTLER COUNTY | 5 of 8 | $394,250 | +106% |
| 17 MAY 2024 | 240517-H09 | Southeast | JSEM0040 - ROUTE 5 - DOUGLAS COUNTY | 1 of 5 | $147,897 | Low, 27% under the second |
| 17 MAY 2024 | 240517-H10 | Southeast | JSEM0048-ROUTE HH-NEW MADRID COUNTY | 1 of 7 | $58,800 | Low, 19% under the second |
| 19 APR 2024 | 240419-H04 | Southeast | J9P3739 - ROUTE 61 - STE. GENEVIEVE | 1 of 3 | $1,131,595 | Low, 20% under the second |
| 19 APR 2024 | 240419-H06 | Southeast | J9P3834 - VARIOUS ROUTES - VARIOUS COUNTIES | 1 of 3 | $1,090,000 | Low |
| 15 DEC 2023 | 231215-H04 | Southeast | J9S3449B - ROUTE M - STE. GENEVIEVE COUNTY | 4 of 6 | $794,829 | +27% |
| 20 OCT 2023 | 231020-H04 | Southeast | J9S3610B - ROUTE 221 - ST FRANCOIS COUNTY | 1 of 5 | $120,864 | Low, 13% under the second |
| 18 AUG 2023 | 230818-H01 | Southeast | J9P3614-ROUTE 160-HOWELL, OREGON COUNTIES | 1 of 2 | $8,260,100 | Low, 8.0% under the second |
| 21 APR 2023 | 230421-H04 | Southeast | J9P3747 - ROUTE 14 - DOUGLAS COUNTY | 5 of 5 | $1,318,406 | +77% |
| 21 APR 2023 | 230421-H08 | Southeast | J9P3837-ROUTE 60 - SHANNON, CARTER COUNTIES | 1 of 5 | $581,931 | Low, 13% under the second |
How this record was read
MoDOT letting tabulation PDFs (vendor ranking and bid tabulation), January 2020 to October 2026. About one bid in eight did not match its published total and is left out. Item codes from before mid 2021 are written in the current MoDOT format so one item groups across years.
- Every bid counted here matched its published total to within one dollar; MoDOT's rank decides who was low.
- The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
- A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.
A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.