MoDOT contract 261016-G10 bid tabulation
JSR0270, JSR0346-ROUTE 65-TANEY COUNTY. Let by Missouri DOT on October 16, 2026, Taney, Southwest. 3 bids received; low bid $10,241,273 by APAC-Central, Inc..
- Owner
- Missouri DOT
- Letting
- 16 OCT 2026
- Pay items
- 67
- Data through
- 16 OCT 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | APAC-Central, Inc. | $10,241,273 | Low |
| 2 | Emery Sapp & Sons, Inc. | $11,688,802 | +14% |
| 3 | Capital Paving & Construction, LLC | $11,717,388 | +14% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. APAC-Central, Inc. | 2. Emery Sapp & Sons, Inc. | 3. Capital Paving & Construction, LLC |
|---|---|---|---|---|---|---|
| 0010 | Removal of improvements (2022010) | LS | 1 | $11,500 | $4,500.00 | $11,498 |
| 0020 | Misc.permanent aggregate edge treatment (3049910) | TON | 5,028 | $27.53 | $46.65 | $28.21 |
| 0030 | Bituminous pavement mixture PG70-22, (BP-1) (4011207) | TON | 3,729.50 | $78.48 | $87.00 | $86.99 |
| 0040 | Bituminous pavement mixture PG64-22 (surface leveling) (4020520) | TON | 7,788.30 | $83.92 | $86.75 | $89.81 |
| 0050 | Asphaltic concrete mixture PG 70-22 (SP095C mix) (4030003) | TON | 58,260.80 | $83.74 | $93.65 | $100.00 |
| 0060 | Tack coat (4071005) | GAL | 79,439 | $3.41 | $2.80 | $2.51 |
| 0070 | Prime-liquid asphalt MC 800 (4081018) | GAL | 14,833 | $3.56 | $3.60 | $4.12 |
| 0080 | Ultrathin bonded wearing surface, type C (4133200) | SY | 2,464 | $22.62 | $10.00 | $22.10 |
| 0090 | Construction signs (6161005) | SF | 3,042 | $7.07 | $7.00 | $7.00 |
| 0100 | Channelizer (trim-line) (6161025) | EACH | 200 | $21.21 | $21.00 | $21.00 |
| 0110 | Type 3 moveable barricade (6161030) | EACH | 6 | $166.67 | $165.00 | $164.97 |
| 0120 | Flashing arrow panel (6161040) | EACH | 2 | $1,111.11 | $1,100.00 | $1,099.81 |
| 0130 | Tubular marker (6161070) | EACH | 130 | $65.66 | $65.00 | $64.99 |
| 0140 | Changeable message sign with communication interface, contractor furnished retained (6161099) | EACH | 2 | $4,545.46 | $4,500.00 | $4,499.23 |
| 0150 | Mobilization (6181000) | LS | 1 | $264,761 | $653,575 | $307,844 |
| 0160 | Preformed thermoplastic pavement marking, 24 in. white (6200015) | LF | 334 | $16.20 | $16.00 | $16.00 |
| 0170 | Preformed thermoplastic pavement marking, left/right arrow (6200021) | EACH | 64 | $253.16 | $250.00 | $249.96 |
| 0180 | Preformed thermoplastic pavement marking, combination STR/LT/RT (6200027) | EACH | 2 | $455.70 | $450.00 | $449.92 |
| 0190 | Preformed thermoplastic pavement marking, 24 in. X 36 in., yield line triangle (6200042A) | EACH | 10 | $101.27 | $100.00 | $99.98 |
| 0200 | 6 in. white class 2 pavement marking paint (25-mil, type L beads) (6205902B) | LF | 246,418 | $0.25 | $0.25 | $0.25 |
| 0210 | 6 in. yellow class 2 pavement marking paint (25-mil, type L beads) (6205903B) | LF | 175,318 | $0.25 | $0.25 | $0.25 |
| 0220 | 12 in. white class 2 pavement marking paint (25-mil, type L beads) (6205906B) | LF | 10,461 | $0.61 | $0.60 | $0.60 |
| 0230 | Coldmilling bituminous pavement for removal of surfacing (3 in. thick or less) (6221001) | SY | 652,191 | $0.85 | $1.35 | $1.59 |
| 0240 | Modified coldmilling (depth transitions) (6224010) | SY | 7,428 | $2.23 | $3.60 | $2.05 |
| 0250 | Bituminous shoulder rumble strip (6261000A) | STA | 3,172.60 | $18.12 | $16.25 | $5.36 |
| 0260 | Contractor furnished surveying and staking (6274000) | LS | 1 | $500.00 | $2,800.00 | $887.26 |
| 0270 | MGS double faced guardrail (6061067) | LF | 238 | $49.00 | $50.00 | $48.99 |
| 0280 | Asymmetrical transition section, 6.5 FT. posts (6062303) | EACH | 2 | $700.00 | $800.00 | $699.88 |
| 0290 | Thrie beam anchor section (modified type-C concrete barrier) (6062500) | EACH | 2 | $4,372.00 | $2,300.00 | $4,371.26 |
| 0300 | Type E crashworthy end terminal (MASH) (6063022) | EACH | 1 | $44,405 | $40,000 | $44,397 |
| 0310 | Cable, loop detector, in duct (9028500) | LF | 2,530 | $7.75 | $7.75 | $7.75 |
| 0320 | Removal of improvements (2022010) | LS | 1 | $7,200.00 | $9,000.00 | $7,198.78 |
| 0330 | Shaping slopes, class III (2153000) | 100F | 6 | $1,218.00 | $2,300.00 | $1,217.79 |
| 0340 | Asphaltic concrete mixture PG 70-22 (SP095C mix) (4030003) | TON | 9,534.60 | $87.21 | $125.75 | $100.00 |
| 0350 | Tack coat (4071005) | GAL | 9,598 | $3.41 | $2.80 | $2.47 |
| 0360 | Misc.high friction surface treatment (4139905) | SY | 40,948 | $18.62 | $17.61 | $17.65 |
| 0370 | Construction signs (6161005) | SF | 980 | $7.07 | $7.00 | $7.00 |
| 0380 | Channelizer (trim-line) (6161025) | EACH | 100 | $21.21 | $21.00 | $21.00 |
| 0390 | Type 3 moveable barricade (6161030) | EACH | 6 | $166.67 | $165.00 | $164.97 |
| 0400 | Flashing arrow panel (6161040) | EACH | 2 | $1,111.11 | $1,100.00 | $1,099.81 |
| 0410 | Tubular marker (6161070) | EACH | 53 | $65.66 | $65.00 | $64.99 |
| 0420 | Changeable message sign with communication interface, contractor furnished retained (6161099) | EACH | 2 | $4,545.46 | $4,500.00 | $4,499.23 |
| 0430 | Mobilization (6181000) | LS | 1 | $105,345 | $40,000 | $138,821 |
| 0440 | Preformed thermoplastic pavement marking, 24 in. white (6200015) | LF | 604 | $16.20 | $16.00 | $16.00 |
| 0450 | Preformed thermoplastic pavement marking, left/right arrow (6200021) | EACH | 70 | $253.16 | $250.00 | $249.96 |
| 0460 | Preformed thermoplastic pavement marking, straight arrow (6200024) | EACH | 1 | $253.16 | $250.00 | $249.96 |
| 0470 | Preformed thermoplastic pavement marking, combination STR/LT/RT (6200027) | EACH | 3 | $405.06 | $400.00 | $399.93 |
| 0480 | Preformed thermoplastic pavement marking, word (only) (6200030) | EACH | 9 | $405.06 | $400.00 | $399.93 |
| 0490 | Preformed thermoplastic pavement marking, 24 in. X 36 in., yield line triangle (6200042A) | EACH | 36 | $101.27 | $100.00 | $99.98 |
| 0500 | 6 in. white class 2 pavement marking paint (25-mil, type L beads) (6205902B) | LF | 53,740 | $0.25 | $0.25 | $0.25 |
| 0510 | 6 in. yellow class 2 pavement marking paint (25-mil, type L beads) (6205903B) | LF | 45,050 | $0.25 | $0.25 | $0.25 |
| 0520 | Coldmilling bituminous pavement for removal of surfacing (3 in. thick or less) (6221001) | SY | 95,981 | $1.60 | $3.45 | $4.54 |
| 0530 | Modified coldmilling (depth transitions) (6224010) | SY | 4,744 | $3.62 | $3.35 | $3.20 |
| 0540 | Contractor furnished surveying and staking (6274000) | LS | 1 | $500.00 | $2,800.00 | $887.26 |
| 0550 | MGS guardrail (6061060) | LF | 338 | $33.00 | $35.00 | $32.99 |
| 0560 | MGS guardrail, 8 FT. posts, 6 FT. - 3 in. spacing (6061061) | LF | 875 | $446.88 | $40.00 | $39.99 |
| 0570 | MGS bridge approach transition section (extended curb) (6061068) | EACH | 4 | $4,458.88 | $4,300.00 | $4,051.31 |
| 0580 | MGS height and block transition (6061074) | EACH | 5 | $879.00 | $1,200.00 | $878.85 |
| 0590 | MGS end anchor (6061080) | EACH | 3 | $1,206.00 | $1,700.00 | $1,205.79 |
| 0600 | Asymmetrical transition section, 6.5 FT. posts (6062303) | EACH | 4 | $700.00 | $1,000.00 | $699.88 |
| 0610 | Type A crashworthy end terminal (MASH) (6063014) | EACH | 9 | $3,122.00 | $3,600.00 | $3,121.47 |
| 0620 | Cable, loop detector, in duct (9028500) | LF | 4,140 | $7.50 | $7.50 | $7.50 |
| 0630 | Misc.contractor furnished contractor installed advanced radar detection system (9029902) | EACH | 1 | $26,700 | $26,700 | $26,695 |
| 0640 | Misc.contractor furnished contractor installed radar detction system, 3 radar (9029902) | EACH | 2 | $44,500 | $44,500 | $44,492 |
| 0650 | Misc.contractor furnished contractor installed radar detction system, 4 radar (9029902) | EACH | 2 | $54,295 | $54,295 | $54,286 |
| 0660 | Misc.pole height extension for advanced radar (9029902) | EACH | 2 | $2,885.00 | $2,885.00 | $2,884.51 |
| 0670 | Misc.wireless subscriber unit (9029902) | EACH | 1 | $1,810.00 | $1,810.00 | $1,809.69 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from MoDOT's tabulation for this contract. MoDOT letting tabulation PDFs (vendor ranking and bid tabulation), January 2020 to October 2026. About one bid in eight did not match its published total and is left out. Item codes from before mid 2021 are written in the current MoDOT format so one item groups across years.
Every contract let that day: MoDOT letting of October 16, 2026. Compiled by Mirage Metrics.