MoDOT contract 261016-D01 bid tabulation
JCD0088-ROUTE 63-PHELPS, TEXAS COUNTIES. Let by Missouri DOT on October 16, 2026, Phelps, Central. 5 bids received; low bid $9,530,000 by Pace Construction Company, LLC.
- Owner
- Missouri DOT
- Letting
- 16 OCT 2026
- Pay items
- 44
- Data through
- 16 OCT 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Pace Construction Company, LLC | $9,530,000 | Low |
| 2 | Magruder Paving, LLC | $11,275,433 | +18% |
| 3 | Capital Paving & Construction, LLC | $11,436,666 | +20% |
| 4 | Emery Sapp & Sons, Inc. | $11,916,721 | +25% |
| 5 | N.B. West Contracting Company | $12,390,000 | +30% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Pace Construction Company, LLC | 2. Magruder Paving, LLC | 3. Capital Paving & Construction, LLC | 4. Emery Sapp & Sons, Inc. | 5. N.B. West Contracting Company |
|---|---|---|---|---|---|---|---|---|
| 0010 | Removal of improvements (2022010) | LS | 1 | $60,140 | $63,140 | $63,140 | $36,000 | $65,000 |
| 0020 | Shaping slopes, class III (2153000) | 100F | 68 | $1,532.56 | $1,532.56 | $1,532.56 | $1,660.00 | $1,550.00 |
| 0030 | Gravel (A) or crushed stone (B) (3105002) | TON | 50 | $90.00 | $157.63 | $174.63 | $215.00 | $235.00 |
| 0040 | Bituminous pavement mixture PG64-22, (BP-1) (4011209) | TON | 2,911.30 | $91.00 | $102.60 | $112.93 | $104.35 | $200.00 |
| 0050 | Asphaltic concrete mixture PG 70-22 (SP125C mix) (4030103) | TON | 84,739.50 | $85.75 | $89.40 | $93.67 | $94.80 | $106.00 |
| 0060 | Tack coat - non-tracking (4071007) | GAL | 81,845 | $3.50 | $3.68 | $3.67 | $3.65 | $3.20 |
| 0070 | Changeable message sign with communication interface, contractor furnished retained (6161099) | EACH | 8 | $3,100.00 | $2,800.00 | $3,100.00 | $3,400.00 | $2,800.00 |
| 0080 | Misc.lump sum traffic control (6169901) | LS | 1 | $33,333 | $64,707 | $33,333 | $38,000 | $65,000 |
| 0090 | Misc.digital speed limit assembly (6169902) | EACH | 2 | $3,100.00 | $10,340 | $3,100.00 | $3,400.00 | $10,340 |
| 0100 | Mobilization (6181000) | LS | 1 | $33,739 | $386,588 | $506,811 | $526,600 | $426,359 |
| 0110 | Preformed thermoplastic pavement marking, 24 in. white (6200015) | LF | 2,137 | $17.00 | $17.00 | $17.00 | $18.35 | $17.00 |
| 0120 | Preformed thermoplastic pavement marking, 24 in. yellow (6200018) | LF | 4,025 | $17.00 | $17.00 | $17.00 | $18.35 | $17.00 |
| 0130 | Preformed thermoplastic pavement marking, left/right arrow (6200021) | EACH | 116 | $275.00 | $275.00 | $275.00 | $300.00 | $275.00 |
| 0140 | Preformed thermoplastic pavement marking, straight arrow (6200024) | EACH | 41 | $200.00 | $200.00 | $200.00 | $216.00 | $200.00 |
| 0150 | Preformed thermoplastic pavement marking, combination STR/LT/RT (6200027) | EACH | 11 | $500.00 | $500.00 | $500.00 | $540.00 | $500.00 |
| 0160 | Preformed thermoplastic pavement marking, word (only) (6200030) | EACH | 7 | $550.00 | $550.00 | $550.00 | $600.00 | $550.00 |
| 0170 | Preformed thermoplastic pavement marking, LT/RT fish hook arrow (6200045) | EACH | 2 | $1,000.00 | $1,000.00 | $1,000.00 | $1,080.00 | $1,000.00 |
| 0180 | Preformed thermoplastic pavement marking, combination STR/LT/RT fish hook arrow (6200051) | EACH | 4 | $1,200.00 | $1,200.00 | $1,200.00 | $1,300.00 | $1,200.00 |
| 0190 | 6 in. white class 2 pavement marking paint (25-mil, type L beads) (6205902B) | LF | 316,298 | $0.28 | $0.28 | $0.28 | $0.30 | $0.28 |
| 0200 | 6 in. yellow class 2 pavement marking paint (25-mil, type L beads) (6205903B) | LF | 10,249 | $0.27 | $0.27 | $0.27 | $0.30 | $0.27 |
| 0210 | 4 in. white class 1 pavement marking paint (18-mil, type P beads) (6206000D) | LF | 449 | $2.00 | $2.00 | $2.00 | $2.25 | $2.00 |
| 0220 | 4 in. yellow class 1 pavement marking paint (18-mil, type P beads) (6206001D) | LF | 477,112 | $0.14 | $0.14 | $0.14 | $0.15 | $0.14 |
| 0230 | 8 in. white class 1 pavement marking paint (18-mil, type P beads) (6206108B) | LF | 170 | $5.00 | $5.00 | $5.00 | $5.40 | $5.00 |
| 0240 | Pavement marking removal (6207001) | LF | 702 | $5.00 | $5.00 | $5.00 | $5.40 | $5.00 |
| 0250 | Pavement marking removal (symbols) (6207002) | EACH | 41 | $100.00 | $100.00 | $100.00 | $110.00 | $100.00 |
| 0260 | Misc.temporary pavement marking paint (6209901) | LS | 1 | $1.00 | $105,000 | $1.00 | $1.00 | $1.00 |
| 0270 | Misc.preformed thermoplastic pavement marking, shield (6209902) | EACH | 2 | $1,500.00 | $1,500.00 | $1,500.00 | $1,650.00 | $1,500.00 |
| 0280 | Misc.preformed thermoplastic pavement marking, word (6209902) | EACH | 4 | $1,500.00 | $1,500.00 | $1,500.00 | $1,650.00 | $1,500.00 |
| 0290 | Coldmilling bituminous pavement for removal of surfacing (3 in. thick or less) (6221001) | SY | 808,013 | $0.79 | $1.92 | $1.68 | $2.05 | $1.35 |
| 0300 | Modified coldmilling (depth transitions) (6224010) | SY | 689 | $5.00 | $1.92 | $14.76 | $13.55 | $1.35 |
| 0310 | Bituminous shoulder rumble strip (6261000A) | STA | 2,238.40 | $19.00 | $10.13 | $5.13 | $27.20 | $5.13 |
| 0320 | Bituminous centerline rumble strip (6261001) | STA | 1,242.30 | $22.00 | $13.04 | $8.04 | $25.60 | $8.04 |
| 0330 | MGS guardrail (6061060) | LF | 5,050 | $33.87 | $33.87 | $33.87 | $36.60 | $33.87 |
| 0340 | MGS end anchor (6061080) | EACH | 1 | $2,573.47 | $2,573.47 | $2,573.47 | $3,000.00 | $2,573.47 |
| 0350 | Type A crashworthy end terminal (MASH) (6063014) | EACH | 19 | $3,711.75 | $3,711.75 | $3,711.75 | $4,010.00 | $3,711.75 |
| 0360 | Misc.6' X 15' loop detector (9029902) | EACH | 1 | $2,400.00 | $2,400.00 | $2,400.00 | $2,600.00 | $2,400.00 |
| 0370 | Misc.6' X 6' loop detector (9029902) | EACH | 1 | $2,000.00 | $2,000.00 | $2,000.00 | $2,200.00 | $2,000.00 |
| 0380 | Misc.video detection system (9029902) | EACH | 2 | $32,000 | $32,000 | $32,000 | $34,600 | $32,000 |
| 0390 | Breakaway assembly (perforated square steel tube) (9031241) | EACH | 4 | $444.02 | $444.02 | $444.02 | $185.00 | $444.02 |
| 0400 | 2.5 in. PSST post - 12 GA. (9031280) | LF | 1,008 | $16.60 | $16.60 | $16.60 | $13.50 | $16.60 |
| 0410 | Concrete post anchor for 2.5 in. PSST. - 7 GA. (9031285) | EACH | 63 | $608.71 | $608.71 | $608.71 | $433.00 | $608.71 |
| 0420 | SH-flat sheet (9035004A) | SF | 120 | $30.21 | $30.21 | $30.21 | $21.00 | $30.21 |
| 0430 | ST-structural (9035011A) | SF | 147 | $39.61 | $39.61 | $39.61 | $33.00 | $39.61 |
| 0440 | SHF-flat sheet fluorescent (9035069A) | SF | 532 | $32.53 | $32.53 | $32.53 | $25.00 | $32.53 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from MoDOT's tabulation for this contract. MoDOT letting tabulation PDFs (vendor ranking and bid tabulation), January 2020 to October 2026. About one bid in eight did not match its published total and is left out. Item codes from before mid 2021 are written in the current MoDOT format so one item groups across years.
Every contract let that day: MoDOT letting of October 16, 2026. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.