MoDOT contract 261016-D04 bid tabulation

JCD0199 - ROUTE 5 - HOWARD COUNTY. Let by Missouri DOT on October 16, 2026, Howard, Central. 2 bids received; low bid $327,331 by Capital Paving & Construction, LLC.

Owner
Missouri DOT
Letting
16 OCT 2026
Pay items
17
Data through
16 OCT 2026

Bidders

RankBidderTotal bidAgainst the low bid
1Capital Paving & Construction, LLC$327,331Low
2Christensen Construction Co.$410,514+25%
MoDOT contract 261016-D04: bids by rank

Bid tabulation

LinePay itemUnitQuantity1. Capital Paving & Construction, LLC2. Christensen Construction Co.
0010Bituminous pavement mixture PG64-22, (BP-1) (4011209)TON1,284.90$137.03$150.00
0020Tack coat - non-tracking (4071007)GAL1,187$3.36$8.00
0030Adjusting manhole (6042010)EACH1$949.61$1,500.00
0040Changeable message sign without communication interface, contractor furnished retained (6161098A)EACH3$10.00$2,000.00
0050Misc.lump sum temporary traffic control (6169901)LS1$7,500.00$11,000
0060Mobilization (6181000)LS1$34,129$50,000
0070Preformed thermoplastic pavement marking, 24 in. white (6200015)LF153$16.00$23.50
0080Preformed thermoplastic pavement marking, 24 in. X 36 in., yield line triangle (6200042A)EACH6$100.00$15.00
00904 in. white class 1 pavement marking paint (18-mil, type P beads) (6206000D)LF1,461$0.30$1.25
01004 in. yellow class 1 pavement marking paint (18-mil, type P beads) (6206001D)LF7,958$0.30$0.85
0110Coldmilling bituminous pavement for removal of surfacing (3 in. thick or less) (6221001)SY11,873$3.36$5.00
0120Bituminous pavement mixture PG64-22, (BP-1) (4011209)TON297.90$157.07$150.00
0130Tack coat - non-tracking (4071007)GAL275$3.36$8.00
01404 in. white class 1 pavement marking paint (18-mil, type P beads) (6206000D)LF1,904$0.30$1.75
0150Misc.ADA symbol (6209902)EACH6$25.00$350.00
0160Misc.6 in. white class 1 pavement marking paint (18-mil, type P beads) (6209903)LF1,030$0.40$2.00
0170Coldmilling bituminous pavement for removal of surfacing (3 in. thick or less) (6221001)SY2,753$3.65$5.00
MoDOT contract 261016-D04: unit prices by line

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from MoDOT's tabulation for this contract. MoDOT letting tabulation PDFs (vendor ranking and bid tabulation), January 2020 to October 2026. About one bid in eight did not match its published total and is left out. Item codes from before mid 2021 are written in the current MoDOT format so one item groups across years.

Every contract let that day: MoDOT letting of October 16, 2026. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy