MoDOT contract 261016-D12 bid tabulation

JCD0303 - ROUTE P, JJ - DENT, CRAWFORD COUNTIES. Let by Missouri DOT on October 16, 2026, Dent, Central. 3 bids received; low bid $692,000 by Pace Construction Company, LLC.

Owner
Missouri DOT
Letting
16 OCT 2026
Pay items
14
Data through
16 OCT 2026

Bidders

RankBidderTotal bidAgainst the low bid
1Pace Construction Company, LLC$692,000Low
2N.B. West Contracting Company$735,211+6.0%
3Capital Paving & Construction, LLC$746,890+8.0%
MoDOT contract 261016-D12: bids by rank

Bid tabulation

LinePay itemUnitQuantity1. Pace Construction Company, LLC2. N.B. West Contracting Company3. Capital Paving & Construction, LLC
0010Removal of improvements (2022010)LS1$6,500.00$200.00$1,500.00
0020Gravel (A) or crushed stone (B) (3105002)TON554$60.00$118.00$101.64
0030Tack coat - non-tracking (4071007)GAL7,031$4.50$3.35$3.45
0040Misc.adjusting water valve cover (6049902)EACH1$650.00$125.00$1,653.06
0050Changeable message sign without communication interface, contractor furnished retained (6161098A)EACH2$1,500.00$2,000.00$3,807.02
0060Misc.lump sum traffic control (6169901)LS1$16,000$12,930$12,930
0070Mobilization (6181000)LS1$54,390$45,000$40,500
00804 in. white class 1 pavement marking paint (18-mil, type P beads) (6206000D)LF75,029$0.14$0.17$0.14
00904 in. yellow class 1 pavement marking paint (18-mil, type P beads) (6206001D)LF75,029$0.14$0.11$0.14
0100Modified coldmilling (depth transitions) (6224010)SY213$50.00$63.25$116.87
0110U-channel post, 3 LB (9031250A)LF56$20.00$34.00$34.00
0120SHF-flat sheet fluorescent (9035069A)SF12$20.00$60.00$60.00
0130Bituminous pavement mixture PG64-22 (surface leveling) (4020520)TON2,673$92.50$100.00$104.63
0140Bituminous pavement mixture PG64-22 (surface leveling) (4020520)TON2,663.10$100.00$105.00$102.86
MoDOT contract 261016-D12: unit prices by line

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from MoDOT's tabulation for this contract. MoDOT letting tabulation PDFs (vendor ranking and bid tabulation), January 2020 to October 2026. About one bid in eight did not match its published total and is left out. Item codes from before mid 2021 are written in the current MoDOT format so one item groups across years.

Every contract let that day: MoDOT letting of October 16, 2026. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy