MoDOT contract 251017-C09 bid tabulation

JKU0451, JKU0453-ROUTE I-435-JACKSON COUNTY. Let by Missouri DOT on October 17, 2025, Jackson, Kansas City. 2 bids received; low bid $427,738 by Realm Construction Inc..

Owner
Missouri DOT
Letting
17 OCT 2025
Pay items
46
Data through
16 OCT 2026

Bidders

RankBidderTotal bidAgainst the low bid
1Realm Construction Inc.$427,738Low
2Comanche Construction, Inc.$519,887+22%
MoDOT contract 251017-C09: bids by rank

Bid tabulation

LinePay itemUnitQuantity1. Realm Construction Inc.2. Comanche Construction, Inc.
0010Removal of improvements (2022010)LS1$18,020$45,543
0020Impact attenuator 65 MPH (sand barrel array) (6122017)EACH1$3,220.00$2,853.20
0030Replacement sand barrel (6122020)EACH1$460.00$407.60
0040Construction signs (6161005)SF128$8.05$7.13
0050Channelizer (trim-line) (6161025)EACH40$20.70$18.34
0060Direction indicator barricade (6161033)EACH5$74.75$66.23
0070Sequential flashing warning light (6161055)EACH5$74.75$66.23
0080Changeable message sign with communication interface, contractor furnished retained (6161099)EACH1$2,875.00$2,547.50
0090Temporary traffic barrier, contractor furnished retained (6173600D)LF550$23.00$53.67
0100Mobilization (6181000)LS1$16,868$29,917
0110Temporary removable marking tape 4 in., white (6205301B)LF992$2.70$2.39
01206 in. yellow class 2 pavement marking paint (25-mil, type L beads) (6205903B)LF160$3.25$2.85
0130Pavement marking removal (6207001)LF1,152$0.50$0.41
0140Contractor furnished surveying and staking (6274000)LS1$575.00$1,000.00
0150Mulching (8025006)ACRE0.10$115.00$10,190
0160Seeding - cool season grasses (8051000A)ACRE0.10$20,700$10,190
0170Alternate ditch check (8061006)LF48$10.95$10.19
0180Sediment removal (8061016)CY4$57.50$38.41
0190Type 3B erosion control blanket (8064140)SY527$7.40$3.57
0200MGS guardrail (6061060)LF75$52.90$46.87
0210Misc.concrete sound wall panels (7039904)SF680$380.10$365.57
0220Removal of improvements (2022010)LS1$10,124$17,233
0230Type 5 aggregate for base (6 in. thick) (3040506)SY90$32.90$49.82
0240Concrete pavement (10 in. non-reinf) (5021110)SY90.30$150.20$288.11
0250Impact attenuator 65 MPH (sand barrel array) (6122017)EACH1$3,220.00$2,853.20
0260Replacement sand barrel (6122020)EACH1$460.00$407.60
0270Construction signs (6161005)SF380$8.05$7.13
0280Channelizer (trim-line) (6161025)EACH37$19.55$17.32
0290Direction indicator barricade (6161033)EACH15$63.25$56.05
0300Flashing arrow panel (6161040)EACH1$632.50$560.45
0310Sequential flashing warning light (6161055)EACH15$63.25$56.05
0320Changeable message sign with communication interface, contractor furnished retained (6161099)EACH2$1,955.00$1,732.31
0330Concrete traffic barrier, type D (moment slab) (6173103)LF72$291.00$671.98
0340Temporary traffic barrier, contractor furnished retained (6173600D)LF175$23.00$57.76
0350Mobilization (6181000)LS1$13,706$11,424
0360Temporary removable marking tape 4 in., yellow (6205303B)LF1,827$2.40$2.09
03706 in. yellow class 2 pavement marking paint (25-mil, type L beads) (6205903B)LF457$1.75$1.53
03806 in. yellow class 2 pavement marking paint (25-mil, type L beads) (6205903B)LF1,827$0.20$0.15
0390Pavement marking removal (6207001)LF1,827$0.50$0.41
0400Contractor furnished surveying and staking (6274000)LS1$575.00$500.00
0410Curb inlet check (8061007A)EACH3$172.50$127.38
0420Sediment removal (8061016)CY3$68.30$38.41
0430MGS guardrail (6061060)LF138$28.75$25.48
0440Transition section, 6.5 FT. posts (6062300A)EACH1$701.50$621.59
0450Type A crashworthy end terminal (MASH) (6063014)EACH1$3,197.00$2,832.82
0460Misc.guardrail posts in concrete (6069902)EACH11$241.50$213.99
MoDOT contract 251017-C09: unit prices by line

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from MoDOT's tabulation for this contract. MoDOT letting tabulation PDFs (vendor ranking and bid tabulation), January 2020 to October 2026. About one bid in eight did not match its published total and is left out. Item codes from before mid 2021 are written in the current MoDOT format so one item groups across years.

Every contract let that day: MoDOT letting of October 17, 2025. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy