MoDOT contract 250815-G03 bid tabulation
2 Bridge rehabilitations. Let by Missouri DOT on August 15, 2025, Jasper, Southwest. 6 bids received; low bid $3,192,000 by West Plains Bridge & Grading, LLC.
- Owner
- Missouri DOT
- Letting
- 15 AUG 2025
- Pay items
- 114
- Data through
- 16 OCT 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | West Plains Bridge & Grading, LLC | $3,192,000 | Low |
| 2 | Emery Sapp & Sons, Inc. | $4,028,391 | +26% |
| 3 | Louis-Company, LLC | $4,242,307 | +33% |
| 4 | Capital Paving & Construction, LLC | $4,555,432 | +43% |
| 5 | Comanche Construction, Inc. | $5,294,080 | +66% |
| 6 | William Charles Construction Company, LLC | $5,528,000 | +73% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. West Plains Bridge & Grading, LLC | 2. Emery Sapp & Sons, Inc. | 3. Louis-Company, LLC | 4. Capital Paving & Construction, LLC | 5. Comanche Construction, Inc. | 6. William Charles Construction Company, LLC |
|---|---|---|---|---|---|---|---|---|---|
| 0010 | Project: JSR0074 bridge deck replacement section: 0001 roadway items - JSR0073 removal of improvements (2022010) | LS | 1 | $15,000 | $13,250 | $13,281 | $12,033 | $123,930 | $20,000 |
| 0020 | Unclassified excavation (2035000) | CY | 89 | $23.50 | $55.00 | $44.45 | $44.00 | $88.07 | $100.00 |
| 0030 | Subgrade compaction (6-inch depth) (2101006A) | 100F | 1 | $1,425.00 | $1,200.00 | $6,333.56 | $2,525.95 | $326.07 | $6,500.00 |
| 0040 | Furnishing rock fill (2142000) | CY | 89 | $40.00 | $51.00 | $152.38 | $193.39 | $43.02 | $85.00 |
| 0050 | Placing rock fill (2143000) | CY | 89 | $40.00 | $24.00 | $78.80 | $29.99 | $25.78 | $75.00 |
| 0060 | Misc. shaping slopes, class III (modified material requirement) (2159910) | 100F | 8 | $3,000.00 | $786.00 | $1,913.88 | $1,953.01 | $1,078.19 | $1,500.00 |
| 0070 | Type 1 aggregate for base (6 in. thick) (3040163) | SY | 84 | $28.00 | $28.00 | $88.96 | $52.81 | $30.05 | $30.00 |
| 0080 | Misc. 12" optional pavement (4019905) | SY | 56.80 | $185.00 | $309.00 | $420.46 | $290.04 | $342.94 | $250.00 |
| 0090 | Construction signs (6161005) | SF | 835 | $9.75 | $9.83 | $10.47 | $10.93 | $10.68 | $9.00 |
| 0100 | Type 3 moveable barricade (6161030) | EACH | 14 | $162.00 | $163.91 | $294.49 | $182.12 | $240.19 | $150.00 |
| 0110 | Changeable message sign with communication interface, contractor furnished retained (6161099) | EACH | 2 | $2,150.00 | $2,185.42 | $6,805.87 | $2,428.33 | $6,938.86 | $2,000.00 |
| 0120 | Mobilization (6181000) | LS | 1 | $198,935 | $250,000 | $92,568 | $288,546 | $331,021 | $350,000 |
| 0130 | 4 in. white class 1 pavement marking paint (18-mil, type P beads) (6206000D) | LF | 2,660 | $0.55 | $0.55 | $5.24 | $0.76 | $1.60 | $0.50 |
| 0140 | 4 in. yellow class 1 pavement marking paint (18-mil, type P beads) (6206001D) | LF | 332 | $0.65 | $0.66 | $5.24 | $0.90 | $1.65 | $0.60 |
| 0150 | Flowable backfill (6214600A) | CY | 2 | $1,325.00 | $650.00 | $2,374.97 | $3,675.71 | $1,121.65 | $750.00 |
| 0160 | Modified coldmilling (depth transitions) (6224010) | SY | 1,325 | $21.00 | $21.00 | $29.64 | $13.19 | $55.46 | $25.00 |
| 0170 | Contractor furnished surveying and staking (6274000) | LS | 1 | $8,000.00 | $7,500.00 | $1,963.23 | $8,925.93 | $10,675 | $15,000 |
| 0180 | Section: 0002 guardrail guard cable items - JSR0073 MGS guardrail (6061060) | LF | 400 | $47.50 | $33.00 | $40.12 | $39.07 | $27.76 | $44.00 |
| 0190 | MGS bridge approach transition section (regular/no curb) (6061069) | EACH | 8 | $3,450.00 | $4,260.00 | $4,893.12 | $4,766.20 | $3,789.68 | $3,210.00 |
| 0200 | Type A crashworthy end terminal (MASH) (6063014) | EACH | 8 | $3,600.00 | $3,934.00 | $4,893.12 | $4,067.30 | $3,309.30 | $3,325.00 |
| 0210 | Section: 0003 bridge A2690 items - JSR0073 removal of miscellaneous acm (non-friable) (2024043) | SF | 3 | $1,700.00 | $1,640.00 | $1,963.23 | $2,023.21 | $1,601.27 | $1,500.00 |
| 0220 | Misc. class 2 excavation (2069901) | LS | 1 | $1,500.00 | $8,000.00 | $5,259.77 | $28,243 | $18,091 | $7,500.00 |
| 0230 | Misc. dewatering (2069901) | LS | 1 | $2,000.00 | $2,300.00 | $18,693 | $21,897 | $13,770 | $15,000 |
| 0240 | Total surface hydro demolition (2161001) | SY | 2,515 | $77.00 | $69.00 | $59.54 | $81.53 | $71.57 | $60.00 |
| 0250 | Removal of concrete wearing surface (2161502) | SF | 22,631 | $1.55 | $1.75 | $1.57 | $3.10 | $4.47 | $2.00 |
| 0260 | Removal of existing deck repair (2161503) | SF | 500 | $20.00 | $36.00 | $23.39 | $30.83 | $56.00 | $100.00 |
| 0270 | Removal of existing expansion joint & adjacent concrete (2164500) | LF | 81 | $260.00 | $525.00 | $398.27 | $368.64 | $394.86 | $1,750.00 |
| 0280 | Misc. temporary falsework (2169901) | LS | 1 | $20,000 | $55,000 | $38,675 | $64,207 | $133,702 | $250,000 |
| 0290 | Misc. removal of existing bearings (2169902) | EACH | 10 | $1,775.00 | $410.00 | $3,852.26 | $1,618.05 | $1,488.12 | $2,000.00 |
| 0300 | Misc. remove and replace curb and parapet (2169903) | LF | 16 | $550.00 | $2,800.00 | $535.32 | $537.60 | $1,285.36 | $3,000.00 |
| 0310 | Supplementary wearing surface material (5050004) | CY | 20 | $1,000.00 | $1,000.00 | $1,000.00 | $1,000.00 | $1,000.00 | $1,000.00 |
| 0320 | Latex modified concrete wearing surface (5052000) | SY | 2,515 | $122.00 | $141.00 | $234.68 | $152.00 | $242.19 | $160.00 |
| 0330 | Diamond grinding (7031004) | SY | 2,515 | $4.71 | $16.00 | $3.24 | $7.17 | $9.55 | $20.00 |
| 0340 | Class B-2 concrete (7034214) | CY | 21 | $4,750.00 | $5,400.00 | $5,175.07 | $6,132.70 | $10,569 | $9,000.00 |
| 0350 | Curb blockout (7034600) | LF | 1,210 | $100.00 | $137.00 | $124.34 | $118.00 | $101.41 | $200.00 |
| 0360 | Substructure repair (formed) (7040101) | SF | 120 | $110.00 | $225.00 | $251.87 | $173.90 | $250.67 | $222.00 |
| 0370 | Full depth repair (7040106) | SF | 200 | $67.00 | $206.00 | $34.95 | $66.15 | $124.85 | $180.00 |
| 0380 | Cleaning and epoxy coating (7040113) | SF | 5,400 | $8.50 | $9.26 | $11.09 | $21.02 | $16.01 | $15.00 |
| 0390 | Misc. pile encasement (7049902) | EACH | 6 | $3,750.00 | $5,200.00 | $5,523.12 | $5,812.17 | $7,846.09 | $5,500.00 |
| 0400 | Misc. plugging existing curb outlets (7049902) | EACH | 172 | $160.00 | $136.00 | $246.95 | $157.60 | $401.71 | $500.00 |
| 0410 | Reinforcing steel (epoxy coated) (7101000) | LB | 650 | $4.50 | $8.00 | $3.38 | $1.01 | $14.79 | $15.00 |
| 0420 | Protective coating - concrete bents and piers (epoxy) (7110200) | LS | 1 | $25,000 | $26,500 | $31,739 | $8,771.93 | $6,405.10 | $6,000.00 |
| 0430 | Surface preparation for applying epoxy-mastic primer (7125102) | LS | 1 | $12,950 | $4,400.00 | $5,235.28 | $17,544 | $12,810 | $12,000 |
| 0440 | Surface preparation for recoating structural steel (7125200) | SF | 600 | $88.00 | $93.00 | $111.54 | $124.27 | $90.74 | $85.00 |
| 0450 | Field application of organic zinc primer (7125209) | SF | 600 | $14.00 | $14.00 | $16.73 | $9.05 | $6.41 | $6.00 |
| 0460 | Intermediate field coat (system G) (7125365A) | SF | 600 | $4.50 | $4.65 | $5.58 | $4.39 | $3.20 | $3.00 |
| 0470 | Finish field coat (system G) (7125370A) | SF | 600 | $4.50 | $4.65 | $5.58 | $4.39 | $3.20 | $3.00 |
| 0480 | Gray epoxy-mastic primer (7125961) | LS | 1 | $5,000.00 | $4,371.00 | $5,235.28 | $8,771.93 | $6,405.10 | $6,000.00 |
| 0490 | Misc. cored slab drains (7129902) | EACH | 106 | $510.00 | $1,100.00 | $466.18 | $483.49 | $907.69 | $2,000.00 |
| 0500 | Misc. steel pile repair (7129903) | LF | 20 | $1,200.00 | $1,500.00 | $1,363.17 | $1,486.31 | $1,980.55 | $2,250.00 |
| 0510 | Laminated neoprene bearing pad assembly (7162000) | EACH | 10 | $2,650.00 | $2,300.00 | $2,563.75 | $2,630.51 | $4,657.30 | $3,200.00 |
| 0520 | Strip seal expansion joint system (7172001) | LF | 81 | $800.00 | $785.00 | $1,567.73 | $1,005.86 | $931.77 | $1,200.00 |
| 0530 | Section: 0004 bridge A26912 items - JSR0073 removal of miscellaneous acm (non-friable) (2024043) | SF | 3 | $1,650.00 | $1,640.00 | $1,963.23 | $2,023.21 | $1,601.27 | $1,500.00 |
| 0540 | Total surface hydro demolition (2161001) | SY | 1,802 | $80.00 | $69.00 | $50.80 | $83.50 | $73.36 | $60.00 |
| 0550 | Removal of concrete wearing surface (2161502) | SF | 16,218 | $1.75 | $1.85 | $2.90 | $8.23 | $4.89 | $2.00 |
| 0560 | Removal of existing deck repair (2161503) | SF | 350 | $22.00 | $36.00 | $23.39 | $30.83 | $56.00 | $100.00 |
| 0570 | Partial removal of existing bridge deck (2163000) | SF | 130 | $56.00 | $289.00 | $192.19 | $186.31 | $71.08 | $300.00 |
| 0580 | Removal of existing expansion joint & adjacent concrete (2164500) | LF | 38 | $180.00 | $540.00 | $423.71 | $612.81 | $459.19 | $1,750.00 |
| 0590 | Misc. temporary falsework (2169901) | LS | 1 | $12,500 | $35,000 | $38,524 | $51,409 | $133,702 | $178,705 |
| 0600 | Misc. removal of existing bearings (2169902) | EACH | 5 | $2,000.00 | $420.00 | $5,582.07 | $1,334.73 | $1,488.12 | $2,000.00 |
| 0610 | Misc. remove and replace curb and parapet (2169903) | LF | 12 | $550.00 | $3,200.00 | $536.06 | $1,177.62 | $1,191.53 | $3,000.00 |
| 0620 | Supplementary wearing surface material (5050004) | CY | 15 | $1,000.00 | $1,000.00 | $1,000.00 | $1,000.00 | $1,000.00 | $1,000.00 |
| 0630 | Latex modified concrete wearing surface (5052000) | SY | 1,802 | $131.00 | $147.00 | $234.68 | $164.50 | $256.66 | $160.00 |
| 0640 | Diamond grinding (7031004) | SY | 1,802 | $6.34 | $16.00 | $3.24 | $8.12 | $9.64 | $20.00 |
| 0650 | Class B-2 concrete (7034214) | CY | 28.80 | $3,460.00 | $3,300.00 | $4,607.21 | $2,894.72 | $3,668.43 | $5,500.00 |
| 0660 | Curb blockout (7034600) | LF | 873 | $110.00 | $144.00 | $133.50 | $119.91 | $108.89 | $200.00 |
| 0670 | Substructure repair (formed) (7040101) | SF | 50 | $120.00 | $216.00 | $251.86 | $243.85 | $245.39 | $255.00 |
| 0680 | Full depth repair (7040106) | SF | 175 | $71.00 | $205.00 | $35.86 | $54.35 | $124.85 | $175.00 |
| 0690 | Cleaning and epoxy coating (7040113) | SF | 3,200 | $10.00 | $11.00 | $12.90 | $21.93 | $16.01 | $15.00 |
| 0700 | Misc. plugging existing curb outlets (7049902) | EACH | 114 | $165.00 | $134.00 | $246.94 | $142.03 | $401.67 | $500.00 |
| 0710 | Reinforcing steel (epoxy coated) (7101000) | LB | 3,460 | $3.00 | $7.00 | $3.38 | $1.04 | $6.84 | $15.00 |
| 0720 | Protective coating - concrete bents and piers (epoxy) (7110200) | LS | 1 | $8,500.00 | $9,000.00 | $10,785 | $11,696 | $8,540.12 | $8,000.00 |
| 0730 | Surface preparation for recoating structural steel (7125200) | SF | 300 | $135.00 | $141.00 | $168.84 | $82.85 | $90.74 | $85.00 |
| 0740 | Field application of organic zinc primer (7125209) | SF | 300 | $20.00 | $22.00 | $25.39 | $9.05 | $6.41 | $6.00 |
| 0750 | Intermediate field coat (system G) (7125365A) | SF | 300 | $7.00 | $7.07 | $8.47 | $4.19 | $3.20 | $3.00 |
| 0760 | Finish field coat (system G) (7125370A) | SF | 300 | $7.00 | $7.07 | $8.47 | $4.10 | $3.20 | $3.00 |
| 0770 | Misc. cored slab drains (7129902) | EACH | 76 | $510.00 | $1,100.00 | $365.36 | $552.02 | $907.63 | $2,000.00 |
| 0780 | Laminated neoprene bearing pad assembly (7162000) | EACH | 5 | $2,900.00 | $2,300.00 | $2,563.75 | $2,502.75 | $4,657.30 | $3,250.00 |
| 0790 | Strip seal expansion joint system (7172001) | LF | 38 | $800.00 | $794.00 | $3,295.60 | $1,002.11 | $900.33 | $1,200.00 |
| 0800 | Section: 0005 roadway items - JSR0074 removal of improvements (2022010) | LS | 1 | $10,000 | $10,000 | $22,358 | $17,405 | $63,858 | $35,000 |
| 0810 | Subgrade compaction (6-inch depth) (2101006A) | 100F | 2 | $1,100.00 | $783.00 | $4,920.04 | $1,231.75 | $416.50 | $6,500.00 |
| 0820 | Misc. modified linear grading class 2 (2129900) | 100F | 6 | $1,300.00 | $1,665.00 | $6,544.10 | $1,854.00 | $9,821.15 | $3,000.00 |
| 0830 | Misc. shaping slopes, class III (modified material requirement) (2159910) | 100F | 4 | $3,000.00 | $586.00 | $2,349.06 | $2,397.09 | $1,078.19 | $2,000.00 |
| 0840 | Type 1 aggregate for base (6 in. thick) (3040163) | SY | 315 | $27.00 | $27.45 | $64.27 | $52.15 | $24.18 | $30.00 |
| 0850 | Misc. optional pavement (4019905) | SY | 292.20 | $88.00 | $88.38 | $171.72 | $185.34 | $140.06 | $250.00 |
| 0860 | Integral curb (6 in. height and under) type A (6092011) | LF | 44 | $115.00 | $6.26 | $174.94 | $96.63 | $128.10 | $100.00 |
| 0870 | Furnishing type 1 rock ditch liner (6096010A) | CY | 9 | $42.00 | $54.08 | $152.38 | $185.66 | $54.18 | $150.00 |
| 0880 | Placing type 1 rock ditch liner (6096041) | CY | 9 | $155.00 | $232.06 | $389.61 | $569.42 | $416.65 | $200.00 |
| 0890 | Construction signs (6161005) | SF | 660 | $9.75 | $9.83 | $10.47 | $12.02 | $8.54 | $9.00 |
| 0900 | Type 3 moveable barricade (6161030) | EACH | 10 | $165.00 | $163.91 | $386.10 | $200.34 | $240.19 | $150.00 |
| 0910 | Changeable message sign with communication interface, contractor furnished retained (6161099) | EACH | 6 | $2,160.00 | $2,185.00 | $3,926.46 | $2,671.16 | $2,348.54 | $2,000.00 |
| 0920 | Mobilization (6181000) | LS | 1 | $57,695 | $150,000 | $63,938 | $395,996 | $107,561 | $75,000 |
| 0930 | 4 in. white class 1 pavement marking paint (18-mil, type P beads) (6206000D) | LF | 472 | $0.55 | $0.55 | $11.45 | $0.75 | $4.27 | $0.50 |
| 0940 | 4 in. yellow class 1 pavement marking paint (18-mil, type P beads) (6206001D) | LF | 59 | $0.65 | $0.66 | $11.45 | $0.90 | $5.87 | $0.60 |
| 0950 | Permanent erosion control geotextile (6240103A) | SY | 59 | $15.00 | $21.97 | $42.44 | $7.51 | $23.70 | $25.00 |
| 0960 | Contractor furnished surveying and staking (6274000) | LS | 1 | $3,500.00 | $0.01 | $3,926.46 | $3,967.07 | $9,607.64 | $9,000.00 |
| 0970 | Mulching (8025006) | ACRE | 0.80 | $2,250.00 | $2,458.60 | $7,198.50 | $2,946.57 | $2,401.91 | $2,250.00 |
| 0980 | Seeding - cool season grasses (8051000A) | ACRE | 0.80 | $3,650.00 | $3,988.40 | $5,889.69 | $4,779.98 | $3,896.44 | $3,650.00 |
| 0990 | Sediment removal (8061016) | CY | 10 | $6.00 | $113.41 | $175.33 | $221.66 | $53.38 | $100.00 |
| 1000 | Silt fence (8061019) | LF | 966 | $3.50 | $3.82 | $8.51 | $4.80 | $6.49 | $3.50 |
| 1010 | Section: 0006 guardrail guard cable items - JSR0074 MGS guardrail (6061060) | LF | 350 | $47.50 | $32.78 | $45.39 | $44.21 | $27.76 | $44.00 |
| 1020 | MGS bridge approach transition section (regular/no curb) (6061069) | EACH | 4 | $3,500.00 | $4,261.58 | $5,088.39 | $4,956.41 | $3,789.68 | $3,210.00 |
| 1030 | Type A crashworthy end terminal (MASH) (6063014) | EACH | 4 | $3,500.00 | $3,933.77 | $4,175.61 | $4,067.30 | $3,309.30 | $3,225.00 |
| 1040 | Section: 0007 bridge A2862 items - JSR0074 class 1 excavation (2061000) | CY | 80 | $40.00 | $99.03 | $109.58 | $64.22 | $152.38 | $100.00 |
| 1050 | Temporary shoring (2065500) | LS | 1 | $10,000 | $38,000 | $27,853 | $7,720.77 | $17,765 | $50,000 |
| 1060 | Misc. dewatering (2069901) | LS | 1 | $5,000.00 | $40,000 | $48,823 | $32,452 | $27,770 | $20,000 |
| 1070 | Removal of existing bridge deck (2162500) | SF | 3,009 | $20.00 | $22.00 | $24.94 | $32.08 | $31.53 | $20.00 |
| 1080 | Bridge approach slab (minor road) (5031011A) | SY | 128 | $185.00 | $182.00 | $240.63 | $510.93 | $196.26 | $300.00 |
| 1090 | Slab on steel (7034212) | SY | 333 | $690.00 | $880.00 | $550.84 | $697.66 | $1,081.96 | $1,000.00 |
| 1100 | Type D barrier (7034219A) | LF | 221 | $165.00 | $185.00 | $183.72 | $232.97 | $197.23 | $300.00 |
| 1110 | Fiber reinforced polymer wrap (7040164) | SF | 126 | $150.00 | $220.00 | $324.24 | $454.43 | $274.13 | $160.00 |
| 1120 | Slab drain (7123610) | EACH | 14 | $625.00 | $775.00 | $413.91 | $464.35 | $612.99 | $1,250.00 |
| 1130 | Non-destructive testing (7126000) | LF | 33 | $125.00 | $130.00 | $143.97 | $145.46 | $117.28 | $325.00 |
| 1140 | Vertical drain at end bents (7151001) | EACH | 2 | $1,600.00 | $3,500.00 | $4,890.59 | $11,195 | $4,422.06 | $5,000.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from MoDOT's tabulation for this contract. MoDOT letting tabulation PDFs (vendor ranking and bid tabulation), January 2020 to October 2026. About one bid in eight did not match its published total and is left out. Item codes from before mid 2021 are written in the current MoDOT format so one item groups across years.
Every contract let that day: MoDOT letting of August 15, 2025. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.