Capital Paving & Contracting, LLC: NJDOT bid record
Capital Paving & Contracting, LLC submitted 21 bids on New Jersey DOT contracts in the data, from 09 DEC 2021 to 18 MAY 2023, and was the low bidder on 4 of them (19%). When it was not low, its total sat a median +5.0% above the low bid.
- Owner
- New Jersey DOT
- Low bid volume
- $18,943,288
- Latest bid
- 18 MAY 2023
- Data through
- 16 APR 2026
By year
| Year | Bids | Low bids | Win rate |
|---|---|---|---|
| 2021 | 1 | 0 | 0% |
| 2022 | 12 | 1 | 8% |
| 2023 | 8 | 3 | 38% |
By district
| District | Bids | Low bids | Win rate |
|---|---|---|---|
| N1 | 8 | 3 | 38% |
| C4 | 4 | 0 | 0% |
| N4 | 4 | 0 | 0% |
| C1 | 4 | 1 | 25% |
| H4 | 1 | 0 | 0% |
Pay items where it is most often lowest
| Pay item | Code | Unit | Lines bid | Lowest on the line | Its median price | All bidders' median |
|---|---|---|---|---|---|---|
| Construction signs | 159012M | SF | 21 | 15 (71%) | $14.00 | $15.00 |
| Drum | 159006M | U | 15 | 15 (100%) | $1.00 | $1.00 |
| Hot mix asphalt pavement repair | 401021M | SY | 23 | 14 (61%) | $35.00 | $75.00 |
| Breakaway barricade | 159003M | U | 19 | 14 (74%) | $1.00 | $1.00 |
| Traffic cone | 159009M | U | 19 | 14 (74%) | $1.00 | $9.20 |
| Fuel price adjustment | 160004M | DOL | 12 | 12 (100%) | $8,050.00 | $2,700.00 |
| Asphalt price adjustment | 160007M | DOL | 12 | 12 (100%) | $23,600 | $10,200 |
| 9" X 16" concrete vertical curb | 607018P | LF | 21 | 11 (52%) | $64.00 | $60.00 |
| Bicycle safe grate | 602210M | U | 22 | 9 (41%) | $500.00 | $469.00 |
| Curb piece | 602213M | U | 21 | 9 (43%) | $400.00 | $500.00 |
| Reset water valve box | 651255M | U | 12 | 9 (75%) | $30.00 | $75.00 |
| Reset gas valve box | 653084M | U | 12 | 9 (75%) | $30.00 | $60.00 |
A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.
Who it meets most
| Firm | Contracts in common | That firm ranked ahead |
|---|---|---|
| Schifano Construction Corp. | 19 | 12 of 19 |
| Della Pello Paving, Inc. | 15 | 10 of 15 |
| Crisdel Group, Inc. | 10 | 0 of 10 |
| Black Rock Enterprises, LLC | 8 | 1 of 8 |
| D'Annunzio & Sons, Inc. | 8 | 0 of 8 |
| Tilcon New York, Inc. | 6 | 0 of 6 |
| Stavola Contracting Co., Inc | 4 | 0 of 4 |
| Earle Asphalt Company | 3 | 2 of 3 |
| South State, Inc. | 2 | 1 of 2 |
| Roman Asphalt Corp. | 1 | 1 of 1 |
Latest bids
| Let | Contract | District | Project | Rank | Its bid | Against the low bid |
|---|---|---|---|---|---|---|
| 18 MAY 2023 | 23116 | C1 | Rt 130, Main Street (CR 614) to Rt 1 | 2 of 7 | $7,883,010 | +1.0% |
| 02 MAY 2023 | 23110 | N1 | RT80 - WB South Beverwyck Rd (CR637) to Riverview Dr(CR640) | 3 of 5 | $6,086,286 | +4.0% |
| 06 APR 2023 | 23102 | N1 | Route 78, to Route 1&9 to Stuyvesant Ave | 1 of 5 | $3,443,245 | Low, 3.0% under the second |
| 06 APR 2023 | 23105 | N1 | Route 78, PLAINFIELD AVENUE (CR 641) TO WALKER AVENUE | 1 of 5 | $6,588,069 | Low, 7.0% under the second |
| 07 FEB 2023 | 23402 | N4 | Maintenance Roadway Contract N214, DP No. 23402 | 3 of 5 | $10,944,330 | +4.0% |
| 24 JAN 2023 | 23401 | N4 | Maintenance Roadway Contract N110, DP 23401 | 2 of 7 | $9,643,569 | +2.0% |
| 19 JAN 2023 | 22159 | N1 | Route 17, Linwood Ave to CR 83 | 1 of 5 | $3,388,354 | Low, 7.0% under the second |
| 05 JAN 2023 | 23403 | N4 | Maintenance Roadway Contract N319, DP No. 23403 | 2 of 5 | $9,570,752 | +6.0% |
| 22 DEC 2022 | 23406 | C4 | MAINTENANCE ROADWAY CONTRACT C313, DP 23406 | 3 of 5 | $8,673,101 | +5.0% |
| 06 DEC 2022 | 22154 | N1 | Rt 80, Alphano Rd (CR 613) to Rt 46 (Ledgewood Ave) | 4 of 7 | $6,345,631 | +9.0% |
| 20 OCT 2022 | 22143 | N1 | Route 1, South Inman Ave to Dowd Ave | 3 of 6 | $8,142,988 | +16% |
| 22 SEP 2022 | 22142 | N1 | Rt 80 EB, Rt 46 (Ledgewood Avenue) to Berkshire Valley Drive | 2 of 6 | $2,343,297 | 0.0% |
| 02 JUN 2022 | 22110 | C1 | Route 17 Pierrepont Ave. to Terrace Ave/Polify Rd (CR 55) | 3 of 5 | $6,086,343 | +11% |
| 21 APR 2022 | 22113 | C1 | Rt 22, Rt 287 to Maple Ave | 1 of 5 | $5,523,620 | Low, 7.0% under the second |
| 21 APR 2022 | 22118 | C1 | Rt 18, Buckingham Dr to Knightsbridge Rd/Rmp to I-287 | 2 of 3 | $2,290,918 | +1.0% |
| 31 MAR 2022 | 22449 | H4 | MTN Resurfacing Contract No. 524 | 3 of 3 | $6,973,923 | +19% |
| 03 MAR 2022 | 22102 | N1 | ROUTE 22, BROAD STREET (CR623) TO ROUTE 27 (EMPIRE STREET) | 2 of 7 | $2,073,981 | +2.0% |
| 03 MAR 2022 | 22402 | N4 | Maintenance Roadway Contract N318, DP No. 22402 | 3 of 5 | $8,595,158 | +5.0% |
| 22 FEB 2022 | 22404 | C4 | Maintenance Roadway Contract C216, DP 22404 | 2 of 3 | $10,153,918 | +10% |
| 06 JAN 2022 | 22405 | C4 | Maintenance Roadway Contract C312, DP 22405 | 2 of 3 | $12,377,824 | +4.0% |
| 09 DEC 2021 | 22403 | C4 | Maintenance Roadway Contract C117, DP 22403 | 3 of 4 | $12,472,798 | +26% |
How this record was read
NJDOT bid tabulation PDFs linked from its 2018 to 2026 award pages (lettings from June 2017 to April 2026). Bids on redacted tabulations with scanned pages could not be read and are left out, as are bids that did not match their published total. Some maintenance contracts price an adjustment factor (unit PCT): published as is, not a unit price.
- Every bid counted here matched its published total to within one dollar; NJDOT's rank decides who was low.
- The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
- A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.
A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.