South State, Inc.: NJDOT bid record
South State, Inc. submitted 166 bids on New Jersey DOT contracts in the data, from 06 JUL 2017 to 16 APR 2026, and was the low bidder on 86 of them (52%). When it was not low, its total sat a median +12% above the low bid.
- Owner
- New Jersey DOT
- Low bid volume
- $1,132,080,667
- Latest bid
- 16 APR 2026
- Data through
- 16 APR 2026
By year
| Year | Bids | Low bids | Win rate |
|---|---|---|---|
| 2017 | 6 | 4 | 67% |
| 2018 | 22 | 11 | 50% |
| 2019 | 19 | 9 | 47% |
| 2020 | 18 | 9 | 50% |
| 2021 | 21 | 13 | 62% |
| 2022 | 18 | 10 | 56% |
| 2023 | 20 | 11 | 55% |
| 2024 | 26 | 13 | 50% |
| 2025 | 12 | 5 | 42% |
| 2026 | 4 | 1 | 25% |
By district
| District | Bids | Low bids | Win rate |
|---|---|---|---|
| S1 | 72 | 41 | 57% |
| S4 | 38 | 23 | 61% |
| C1 | 33 | 14 | 42% |
| C4 | 11 | 2 | 18% |
| N1 | 9 | 4 | 44% |
| H4 | 3 | 2 | 67% |
Pay items where it is most often lowest
| Pay item | Code | Unit | Lines bid | Lowest on the line | Its median price | All bidders' median |
|---|---|---|---|---|---|---|
| Reinforcement steel, epoxy- coated | 504006P | LB | 163 | 131 (80%) | $1.60 | $2.52 |
| Fuel price adjustment | 160004M | DOL | 103 | 103 (100%) | $10,900 | $2,700.00 |
| Temporary sheeting | 501003P | SF | 109 | 101 (93%) | $1.00 | $18.06 |
| Asphalt price adjustment | 160007M | DOL | 94 | 94 (100%) | $30,100 | $10,200 |
| Oil only emergency spill kit, type 1 | 158072M | U | 120 | 86 (72%) | $200.00 | $900.00 |
| Performance bond and payment bond | 151006M | DOL | 148 | 69 (47%) | $25,000 | $32,468 |
| 9" X 16" concrete vertical curb | 607018P | LF | 126 | 68 (54%) | $45.00 | $60.00 |
| 3" rigid metallic conduit | 701021P | LF | 112 | 62 (55%) | $60.00 | $65.00 |
| Inlet filter type 2, 2' X 4' | 158030M | U | 77 | 60 (78%) | $50.00 | $120.00 |
| Beam guide rail anchorage | 609039M | U | 71 | 55 (77%) | $1,000.00 | $1,430.00 |
| Removal of beam guide rail | 609075M | LF | 66 | 55 (83%) | $1.00 | $2.00 |
| Removal of traffic stripes | 610036M | LF | 88 | 53 (60%) | $0.65 | $0.75 |
A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.
Who it meets most
| Firm | Contracts in common | That firm ranked ahead |
|---|---|---|
| Earle Asphalt Company | 48 | 19 of 48 |
| Richard E. Pierson Construction Co., Inc. | 44 | 14 of 44 |
| Iew Construction Group, Inc. | 35 | 9 of 35 |
| A.E. Stone, Inc. | 26 | 3 of 26 |
| Crisdel Group, Inc. | 24 | 1 of 24 |
| Schifano Construction Corp. | 22 | 10 of 22 |
| Midlantic Construction, LLC | 19 | 5 of 19 |
| Black Rock Enterprises, LLC | 18 | 4 of 18 |
| Green Construction, Inc. | 17 | 5 of 17 |
| JPC Group, Inc. | 17 | 2 of 17 |
Latest bids
| Let | Contract | District | Project | Rank | Its bid | Against the low bid |
|---|---|---|---|---|---|---|
| 16 APR 2026 | 26453 | S4 | MTN JOC Infrastructure South 2026 | 2 of 3 | $1,322,727 | +15% |
| 26 MAR 2026 | 26408 | S4 | MAINTENANCE ROADWAY CONTRACT S314 | 1 of 2 | $9,497,441 | Low, 19% under the second |
| 19 MAR 2026 | 26407 | S4 | MAINTENANCE ROADWAY CONTRACT S216 | 2 of 2 | $8,605,353 | +6.0% |
| 27 JAN 2026 | 25129 | C1 | ADA Central, Contract 1 | 3 of 4 | $24,040,000 | +8.0% |
| 23 OCT 2025 | 25136 | S1 | Route 30, Cooper Street to Grove Street | 1 of 3 | $49,613,394 | Low, 5.0% under the second |
| 16 OCT 2025 | 26447 | S4 | MTN Beam Guide Rail & Attenuator South 2026 | 3 of 3 | $3,035,098 | +36% |
| 14 OCT 2025 | 26446 | C4 | MTN Beam Guide Rail & Attenuator Central 2026 | 3 of 3 | $3,875,040 | +45% |
| 26 AUG 2025 | 25122 | C1 | Route 295 Noise Barrier | 2 of 10 | $13,558,884 | +18% |
| 17 JUN 2025 | 25115 | C1 | Rt 295, Lower Ferry Rd (CR 643) to Rt 29 | 3 of 5 | $6,997,877 | +19% |
| 05 JUN 2025 | 25111 | S1 | Rt 9, CR 559 (Mays Landing RD) to Bayview Drive | 1 of 3 | $5,042,893 | Low, 20% under the second |
| 03 JUN 2025 | 25106 | N1 | Rt 130, Island Rd/Main St to Rt 130/I-295 Merge | 1 of 2 | $7,124,980 | Low, 67% under the second |
| 29 MAY 2025 | 25104 | S1 | ROUTE 130, CR 545 (FARNSWORTH AVENUE) INT Improvements | 2 of 5 | $10,393,417 | +14% |
| 01 MAY 2025 | 25407 | S4 | MAINTENANCE ROADWAY CONTRACT S215 | 2 of 3 | $6,179,817 | +3.0% |
| 29 APR 2025 | 25406 | S4 | MAINTENANCE ROADWAY CONTRACT S121 | 1 of 3 | $13,985,448 | Low, 6.0% under the second |
| 03 APR 2025 | 25103 | S1 | Route 47, Bridge over Menantico Creek | 3 of 3 | $12,141,207 | +10% |
| 14 JAN 2025 | 24152 | C1 | Guiderail Replacement Central, Contract 2019-2 | 1 of 2 | $3,574,266 | Low, 26% under the second |
| 19 DEC 2024 | 25436 | S4 | MTN TIMBER AND UNDERWATER, SOUTH - 2025 | 3 of 3 | $8,559,302 | +72% |
| 10 DEC 2024 | 24150 | S1 | ADA SOUTH, CONTRACT 5 | 1 of 1 | $2,484,000 | Low |
| 21 NOV 2024 | 24140 | S1 | Rt. 206 - Park Av to Willow Grove Rd / Old Indian Mill Rd | 3 of 3 | $2,155,908 | +8.0% |
| 31 OCT 2024 | 24147 | C1 | Rt 295, Rt 195/Rt 29 to Rt 1 | 3 of 3 | $9,167,292 | +35% |
| 31 OCT 2024 | 24151 | S1 | ADA South, Contract 1 with ROW Cost Estimate | 1 of 2 | $3,994,000 | Low, 16% under the second |
| 29 OCT 2024 | 24146 | S1 | Route 49, Bridge over Maurice River | 1 of 3 | $12,380,977 | Low, 43% under the second |
| 24 OCT 2024 | 24148 | S1 | Rt 76/676 Bridges and Pavement, Contract 3 | 2 of 3 | $82,476,168 | +13% |
| 22 OCT 2024 | 25447 | S4 | MTN Beam Guide Rail & Attenuator South 2025 | 2 of 3 | $1,931,599 | +1.0% |
| 17 OCT 2024 | 25446 | C4 | MTN Beam Guide Rail & Attenuator Central 2025 | 1 of 3 | $2,259,000 | Low, 16% under the second |
How this record was read
NJDOT bid tabulation PDFs linked from its 2018 to 2026 award pages (lettings from June 2017 to April 2026). Bids on redacted tabulations with scanned pages could not be read and are left out, as are bids that did not match their published total. Some maintenance contracts price an adjustment factor (unit PCT): published as is, not a unit price.
- Every bid counted here matched its published total to within one dollar; NJDOT's rank decides who was low.
- The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
- A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.
A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.