Richard E. Pierson Construction Co., Inc.: NJDOT bid record
Richard E. Pierson Construction Co., Inc. submitted 54 bids on New Jersey DOT contracts in the data, from 15 MAY 2018 to 05 JUN 2025, and was the low bidder on 11 of them (20%). When it was not low, its total sat a median +12% above the low bid.
- Owner
- New Jersey DOT
- Low bid volume
- $294,064,459
- Latest bid
- 05 JUN 2025
- Data through
- 16 APR 2026
By year
| Year | Bids | Low bids | Win rate |
|---|---|---|---|
| 2018 | 5 | 1 | 20% |
| 2019 | 10 | 4 | 40% |
| 2020 | 7 | 2 | 29% |
| 2021 | 11 | 1 | 9% |
| 2022 | 3 | 0 | 0% |
| 2023 | 5 | 0 | 0% |
| 2024 | 9 | 3 | 33% |
| 2025 | 4 | 0 | 0% |
By district
| District | Bids | Low bids | Win rate |
|---|---|---|---|
| S1 | 31 | 10 | 32% |
| S4 | 12 | 1 | 8% |
| C1 | 6 | 0 | 0% |
| H4 | 3 | 0 | 0% |
| N1 | 2 | 0 | 0% |
Pay items where it is most often lowest
| Pay item | Code | Unit | Lines bid | Lowest on the line | Its median price | All bidders' median |
|---|---|---|---|---|---|---|
| Fuel price adjustment | 160004M | DOL | 36 | 36 (100%) | $24,350 | $2,700.00 |
| Asphalt price adjustment | 160007M | DOL | 34 | 34 (100%) | $47,650 | $10,200 |
| Traffic stripes, 4" | 610003M | LF | 52 | 24 (46%) | $0.50 | $0.50 |
| HMA milling, 3" or less | 401009P | SY | 51 | 24 (47%) | $4.70 | $6.85 |
| Hot mix asphalt pavement repair | 401021M | SY | 35 | 21 (60%) | $45.00 | $75.00 |
| Rumble strip | 610033M | LF | 39 | 20 (51%) | $0.82 | $1.07 |
| Prime coat | 401036M | GAL | 23 | 20 (87%) | $0.01 | $0.01 |
| Traffic marking lines, 24" | 610017M | LF | 46 | 19 (41%) | $5.20 | $5.02 |
| Removal of traffic stripes | 610036M | LF | 36 | 18 (50%) | $0.60 | $0.75 |
| Traffic markings symbols | 610060M | SF | 22 | 18 (82%) | $7.00 | $8.00 |
| Excavation, unclassified | 202009P | CY | 63 | 17 (27%) | $50.00 | $78.60 |
| RPM, mono-directional, white lens | 610012M | U | 45 | 17 (38%) | $30.20 | $34.65 |
A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.
Who it meets most
| Firm | Contracts in common | That firm ranked ahead |
|---|---|---|
| South State, Inc. | 44 | 30 of 44 |
| Earle Asphalt Company | 18 | 12 of 18 |
| A.E. Stone, Inc. | 10 | 5 of 10 |
| JPC Group, Inc. | 10 | 2 of 10 |
| Midlantic Construction, LLC | 7 | 4 of 7 |
| Mount Construction Co., Inc. | 6 | 1 of 6 |
| Black Rock Enterprises, LLC | 6 | 1 of 6 |
| Crisdel Group, Inc. | 6 | 1 of 6 |
| Joseph Defino Contracting Co., Inc. Ta Defino Contrcting Co. | 5 | 0 of 5 |
| Green Construction, Inc. | 5 | 2 of 5 |
Latest bids
| Let | Contract | District | Project | Rank | Its bid | Against the low bid |
|---|---|---|---|---|---|---|
| 05 JUN 2025 | 25111 | S1 | Rt 9, CR 559 (Mays Landing RD) to Bayview Drive | 2 of 3 | $6,036,391 | +20% |
| 29 MAY 2025 | 25104 | S1 | ROUTE 130, CR 545 (FARNSWORTH AVENUE) INT Improvements | 3 of 5 | $11,992,160 | +32% |
| 29 APR 2025 | 25406 | S4 | MAINTENANCE ROADWAY CONTRACT S121 | 3 of 3 | $20,309,868 | +45% |
| 03 APR 2025 | 25103 | S1 | Route 47, Bridge over Menantico Creek | 2 of 3 | $11,706,411 | +6.0% |
| 29 OCT 2024 | 24146 | S1 | Route 49, Bridge over Maurice River | 3 of 3 | $19,107,420 | +54% |
| 24 OCT 2024 | 24148 | S1 | Rt 76/676 Bridges and Pavement, Contract 3 | 1 of 3 | $73,187,142 | Low, 13% under the second |
| 03 OCT 2024 | 24138 | S1 | Rt 54, Atlantic City Expressway to Rt 30 (Whitehorse Pike) | 1 of 3 | $8,705,227 | Low, 0.0% under the second |
| 26 SEP 2024 | 24132 | S1 | Perkintown Rd (CR 644), Bridge over Rt 295 | 1 of 4 | $8,919,386 | Low, 13% under the second |
| 06 JUN 2024 | 24119 | N1 | CR 583 (Princeton Pike), Bridge over Rt 295 & Ramps B & D | 6 of 9 | $22,458,258 | +14% |
| 04 JUN 2024 | 24116 | S1 | Route 47, Grove Street to Route 130, Pavement | 2 of 3 | $64,749,888 | +9.0% |
| 16 APR 2024 | 24407 | S4 | MAINTENANCE ROADWAY CONTRACT S214, DP 24407 | 2 of 3 | $7,906,111 | +1.0% |
| 09 APR 2024 | 24406 | S1 | MAINTENANCE ROADWAY CONTRACT S120 | 3 of 4 | $15,499,640 | +12% |
| 22 FEB 2024 | 18450 | H4 | Maintenance Bridge Fender Replacement Contract 2018-1 | 2 of 5 | $18,404,295 | +1.0% |
| 31 OCT 2023 | 23156 | S1 | Route 42, Kennedy Avenue to Atlantic City Expressway | 4 of 4 | $81,928,293 | +13% |
| 08 JUN 2023 | 23125 | S1 | Route 47 Bridge over Big Timber Creek | 2 of 4 | $52,803,670 | +11% |
| 02 MAR 2023 | 22470 | H4 | Construct Taxiway (Phase 1) | 3 of 3 | $2,664,990 | +40% |
| 14 FEB 2023 | 23408 | S4 | MAINTENANCE ROADWAY CONTRACT S119, DP 23408 | 3 of 3 | $6,294,409 | +10% |
| 09 FEB 2023 | 23407 | S4 | MAINTENANCE ROADWAY CONTRACT S118, DP 23407 | 4 of 4 | $11,619,897 | +38% |
| 06 OCT 2022 | 22139 | S1 | RT 40 & CR 555 Intersection, Operational & Safety Imp | 2 of 3 | $2,365,151 | +6.0% |
| 12 APR 2022 | 22103 | S1 | Rt 206, Monmouth Rd (C.R. 537) & Juliustown Rd (C.R. 669) | 2 of 8 | $6,280,410 | 0.0% |
| 10 FEB 2022 | 22406 | S4 | Maintenance Roadway Contract S117, DP 22406 | 3 of 5 | $9,091,166 | +7.0% |
| 30 SEP 2021 | 21132 | S1 | Route 76, Bridge over Klemm Avenue | 2 of 3 | $64,898,971 | +13% |
| 10 JUN 2021 | 21123 | S1 | ROUTE 40, ELMER LAKE TO ELMWOOD AVE. | 2 of 3 | $6,685,573 | +7.0% |
| 10 JUN 2021 | 21131 | S1 | Route 42 Bridges Over Blackwood Railroad Trail | 2 of 10 | $21,852,662 | +2.0% |
| 03 JUN 2021 | 21112 | S1 | Route 70, Rt 38 to Cooper Ave. | 1 of 5 | $151,992,517 | Low, 3.0% under the second |
How this record was read
NJDOT bid tabulation PDFs linked from its 2018 to 2026 award pages (lettings from June 2017 to April 2026). Bids on redacted tabulations with scanned pages could not be read and are left out, as are bids that did not match their published total. Some maintenance contracts price an adjustment factor (unit PCT): published as is, not a unit price.
- Every bid counted here matched its published total to within one dollar; NJDOT's rank decides who was low.
- The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
- A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.
A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.